Resolved
DECISIONS: (1) The Strategy, Vision and Methodology for Tertiary Highways Network Scheme, selection and treatment, was approved. (2) The proposed three year Tertiary Network Investment Programme was noted.
Traffic & Transportation approved this item on Thursday 15 December 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
DECISIONS: (1) The Strategy, Vision and Methodology for Tertiary Highways Network Scheme, selection and treatment, was approved. (2) The proposed three year Tertiary Network Investment Programme was noted.
To consider and approve the recommended Asset Management Strategy for Investment in the Council's Tertiary Network. To note the three year investment programme as a result of the selection Policy.
2.1That the Strategy, Vision and Methodology for Tertiary Highways Network Scheme selection and treatment is approved.
2.2That the proposed three year Tertiary Network Investment Programme is noted.
3.1The City Council entered in to a 25 year Highways Maintenance PFI Contract with the Service Company (Ensign Highways Ltd) in 2004. The purpose of this Contract was to provide investment in the Highways Network so that the overall condition of the Network was brought up to a specific condition. The Service Company is then required to maintain this standard throughout the life of the Contract for both the Primary and Secondary Network. This would be paid for by the Service Payment to the Service Company.
3.2The Tertiary Network is treated slightly differently, however the Service Company are obliged to deposit £200,000 (indexed) into a specific joint bank account on an annual basis between years 6 and 20 of the Contract. The Contract specifies that this money can only be spent on providing Lifecycle Replacement to the Tertiary Network and that this money can only be used to commission the LCR work through the Service Company.
1 www.portsmouth.gov.uk 3.3 During the Core Investment Period (CIP) the Service Company invested £13m in the road upgrading 47km of Tertiary Network carriageway. Since CIP the Council have commissioned £1m from the Tertiary Network Fund covering 15km of carriageway. There is currently £1.1m in the Joint Tertiary Network Bank account and a further £2.1m to be received by 2024. Based on previous cost of works it is estimated with the remaining funds available, the Council would be able to treat a further 48km. This means during the term of the Contract 37% of the entire Tertiary Network would have been treated, this is demonstrated in figure 1 below.
Figure 1: % of TRN Carriageway treated/to be treated against entire TRN
294km of TRN Carriageway
Carriageway Treated during CIP 16%
5% Carriageway Treated since CIP
63% 16% Carriageway that can be treated with funds remaining in the Contract Carriageway that will go untreated as unfunded
3.4To date the decision on which Road Sections Lengths to treat and the treatment applied has been driven by Ensign who have suggested a programme, however consideration of public and Member concerns and not using recognised engineering techniques had been the Council's methodology for either scheme selection or the treatment to be applied. This has led to roads that require treatment because they are in a poorer condition being left untreated or inappropriate treatments being applied.
3.5Given the finite amount of money available to treat the Tertiary Network the Council needs to set out it's criteria for scheme selection and treatment, hence why the Policy document in appendix A has been developed.
3.6When formulating this scheme selection and treatment policy the Council has had to consider the Council's corporate priorities, Local and Regional Local Transport Plans and it's own Asset Management Strategy. The policy sets out how this has been incorporated into the plan.
2 www.portsmouth.gov.uk 4. Reasons for the Recommendations.
Scheme Selection and Treatment Strategy
4.1Council officers working with Ensign have devised a strategy for treating the Tertiary Network with a view to maximising the value for money of the financial resources it has available. This focuses on the following objectives:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
PCC HPFI TRN Vision Strategy MethodologyAppendix A | 674 KB | Download |
PDF |
TRN-Programme of WorksAppendix B | 358 KB | Download |
PDF |
Tertiary Highways Network Investment Policy and Programme 2017: 2019Report | 270 KB | DownloadRead as text |
Follow Traffic & Transportation at Portsmouth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Mar 2023 | Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... | Approved | Open |
| 23 Mar 2023 | Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... | Approved | Open |
| 23 Mar 2023 | Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... | Approved | Open |
| 23 Mar 2023 | TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... | Approved | Open |
| 23 Mar 2023 | St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.