The Cabinet Member for Traffic and Transportation agreed that: (1) Portsmouth City Council enter into an 18 month pilot with Nextbike to provide a floating bike share scheme in the city; (2) A concession contract is agreed and signed with Nextbike prior to the launch of the first bikes in Portsmouth; (3) A code of conduct for bike share schemes in the city is explored.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
1.1This report sets out the details a scheme to pilot a floating bike share provider in the city of Portsmouth
Recommendations
2.1It is recommended that:
1. Portsmouth City Council enter into an 18 month pilot with Nextbike to provide a floating bike share scheme in the city;
2. A concession contract is agreed and signed with Nextbike prior to the launch of the first bikes in Portsmouth;
3. A code of conduct for bike share schemes in the city is explored.
Background
3.1Following the decision made at the November 2017 Traffic and Transportation decision meeting, to support the development of a floating bike hire scheme within Portsmouth, meetings took place with six hire providers.
3.2The meetings were structured with a prepared list of questions to be answered by the providers. This provided a consistent approach to gather information about how a scheme would work in the city, how a launch would be managed and how the engagement process would work with key stakeholders such as the University, Portsmouth Naval Base, the Hospitals and local businesses. Discount offers were also discussed as a method to increase the numbers of people cycling and to make a scheme as inclusive as possible to all residents and visitors to the city. Costs to the user of bike hire were very similar across all 6 providers.
1 www.portsmouth.gov.uk 4. Nextbike
4.1Nextbike are able to provide a high quality bike hire scheme and currently have 7 active schemes in the UK and 125 other locations across Europe. They are community focussed and offer a varied pricing framework so as to make it as inclusive as possible and this includes a member's rate for an annual fee or a pay as you go rate.
4.2Nextbike is also accredited to Bikeplus. Bikeplus is the representative body for UK bike share. Bikeplus has launched an accreditation scheme for bike share operators which provides assurance to local authorities on an agreed set of standards expected by operators when providing services.
4.3The bike has its central intelligence and locking system on the bicycle itself. All the bikes are suitable for riders between 150cm –200cm in height and feature high quality components for the highest cycling comfort. Standard bike features include:
3-8 speed Shimano nexus hub gears Shimano roller brakes Air-filled Schwalbe puncture resistant tires Shimano hub dynamo for permanent power supply Axa LED front and back lights
2 www.portsmouth.gov.uk 4.4 The tariff rate is set out in the table below and they also offer other pricing options that include:
BusinessBike - Corporate membership CampusBike - University Membership HotelBike - Hotel Membership
Membership Type Annual Cost Free Period Cost per 30 minutes thereafter Tier 1 concession £20 1st 30 minutes of £0.25 membership each trip (students, OAP's) (unlimited trips per day) Tier 2 concession FREE 1st 30 minutes of £0.25 membership each trip (NEETS etc.) (unlimited trips per day) Standard Membership £30 annually 1st 30 minutes of £0.25 (or £2.50/month) each trip (unlimited trips per day) Pay as you go FREE 1st 10 minutes of £0.50 1st trip each day
4.5Through private investment, Nextbike are offering to implement a new dockless bike share system into the city, removing all capital outlay from the council. With support from the council Nextbike aims to introduce the scheme by summer 2018. The aim is to pilot the scheme with 150 Eco Bikes, with the opportunity to expand. Nextbike would seek a local third party organisation to manage the maintenance and redistribution of the bikes and Nextbike will collaborate with the city council to integrate the bike share system into the existing travel model.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.