Rainbow Corner Nursery Phase 2 - Speed Hump Consultation

Approved Committee 1 paper

Transport approved this item on Thursday 11 July 2024. Below is the council's own wording, with the papers it was decided on.

Item35

Resolved

DECISION The Cabinet Member for Transport: 1) Approved the implementation of speed humps RCN01 2) Approved the proposed road safety infrastructure (as detailed in section 3.4 of the report)
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Transport

Purpose of report

1.1To consider the implementation of the proposed speed humps and road safety infrastructure within Victoria Road North, Southsea as outlined in appendix A of this report.

Recommendations

It is recommended that the Cabinet Member for Transport approves:

2.1The implementation of speed humps RCN01; and

2.2The proposed road safety infrastructure (as detailed in section 3.4).

Background

3.1Following the report submitted to the Cabinet Member of Traffic and Transportation on 22 September 2022, which identified the need for road safety improvements as detailed in 3.4 A review of the implemented road safety infrastructure for the protection of Rainbow Corner Nursery has been undertaken. Further measures have also been investigated to assist with improving road safety within the area and to

1 www.portsmouth.gov.uk - Official -

address vehicle speeds within the area due to the incidents that have occurred. A traffic survey was conducted with Victoria Road North from 24 March 2022 to 31 March 2022 to measure the speed, and number of motor vehicles, travelling through the area. The survey information indicated that the average speed of traffic travelling through the area was 24.7mph for northbound traffic and 24.8mph for southbound traffic. The 85th percentile speeds were 29.3mph northbound and 29.6mph southbound. The “85th percentile” speed is a speed at which 85% of traffic will be travelling at, or below, along a street or road (under free flow conditions). The data shows traffic speeds are below the 30mph speed limit.

3.2Following the two accidents that have occurred since September 2021, and through liaison with local stakeholders, this site has been identified as a priority due to the large number of nursery children and pedestrians that are at risk of impact from vehicles driving over the footway (see Appendix B).

3.3Since the implementation of the road safety bollards within the footway in the vicinity of the nursery, a further two accidents have occurred. The first on 31 October 2021 and the second on 27 November 2021. Again, both incidents involved the vehicles leaving the highway and damaging the bollards installed as part of the road safety measures. There was also damage to the nursery wall.

3.4As approved in the Local Transport Plan 4 Implementation Plan 2022/23, funding has been identified through the Local Transport Plan Casualty and Speed Reduction fund 2022-23 to undertake and deliver the road safety improvements within Victoria Road North within the vicinity of Rainbow Corner Nursery.

3.5It is proposed that the following measures be implemented within Victoria Road North between Montgomerie Road to the north and Elm Grove to the South. The measures consist of the following:-

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Rainbow Corner Nursery Phase 2 v2Report 2.5 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

3 of 4 attended
PC
Councillor Peter CandlishCabinet Member, present
SB
Councillor Simon BosherOpposition spokesperson, apologies
GH
Councillor Graham HeaneyOpposition spokesperson, present
BM
Councillor Brian MadgwickOpposition spokesperson, present

On this subject at Portsmouth

Search all
  1. Rainbow Corner Nursery Phase 2 - Speed Hump ConsultationThis decision
  2. Rainbow Corner Day Nursery - Victoria Road NorthApproved
  3. Rainbow Corner Day Nursery - Victoria Road NorthApproved

More from Portsmouth Transport

All decisions
MeetingDecisionOutcome
1 Jul 2026 Proposed time-limited parking place - New Road - TRO Ref P055-25DECISION The Cabinet Member for Transport approved the proposed time-limited parking place as advertised on New Road. Approved Open
1 Jul 2026 Exeter Road EV Bay: THE PORTSMOUTH CITY COUNCIL (VARIOUS ROADS)(ELECTRIC VEHICLE RECHARGING PARKING PLACES)(NO.6) ORDER 2026 (Ref.P004-2026)DECISION The Cabinet Member for Transport approved the implementation of Traffic Regulation Order Reference P004-2026... Approved Open
1 Jul 2026 Residents Parking Zones Future ProgrammeDECISION The Cabinet Member for Transport: 1. Approved progressing the RPZs Future Programme for proposed new zones a... Approved Open
1 Jul 2026 Review of Parking TariffsDECISION The Cabinet Member for Transport: 1. Approved the metered parking tariffs to be increased as set out in appe... Approved Open
1 Jul 2026 Updated Portsmouth Transport Implementation Plan and Local Transport Delivery Plan 2026/27 - 2029/30DECISION The Cabinet Member for Transport: 1. Approved the proposed Portsmouth Transport Implementation Plan 2026/27 ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies