Resolved
That the application was approved subject to the following conditions: Time limit, plans and details 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: In order that the Local Planning Authority shall retain effective control of the development and to ensure the continued structural integrity of the buildings. 2. All the external works of the development hereby permitted shall be completed before the expiration of five years from the date of this permission. REASON: In order that the Local Planning Authority retains effective control over the development and to ensure that there is no significant deterioration in the condition of the buildings. 3. The permission shall relate to the development as shown on drawing no: 01 Location Plan 02 Existing Site Plan Roof Level 03 Existing Site Plan Ground Floor Level 04 Existing Floor Plans 05 Existing Elevations 06 Existing Courtyard Elevations 07B Proposed Site Plan Roof Level (amended 17.08.2021) 08B Proposed Site Plan Ground Floor Level (amended 17.08.2021) 09B Proposed Floor Plans 10B Proposed Ground Floor Plan 11B Proposed First Floor Plan 12A Proposed Elevations 13B Proposed Courtyard Elevations 14B Proposed Courtyard Elevations 15 Existing Out-buildings 16 Proposed Out-buildings 17B Proposed Garages 18B Landscape & Boundary Treatments (amended 17.08.2021) 19 Highways & Ownership J1194 access fig 1 J1194 access fig 2 J1194 access fig 3 Rev A REASON: For the avoidance of doubt and to ensure that the development is carried out in accordance with the submitted plans. 4. The existing buildings earmarked for demolition on the approved plans shall be demolished prior to the commencement of any building works being carried out on the buildings hereby approved for conversion. All resultant materials shall be removed from the site on completion of the development. REASON: To safeguard the amenity of the locality. 5. Precise specifications or samples of all external surfaces of the development hereby permitted shall have been submitted to and approved by the Local Planning Authority before their use in the proposed development. REASON: To ensure that the materials to be used are appropriate to the locality. 6. This permission shall relate to the proposed conversion in accordance with the Structural Assessment by Michael Holden submitted as part of the application and dated 18 December 2019. Any deviation from the survey may need to be the subject of a further planning application. Prior to the commencement of development a schedule of works including a sequence of operations for the scheme of conversion in accordance with the findings of the Structural Assessment shall be submitted to and approved in writing by the Local Planning Authority. REASON: Since the application is for the conversion of the building only. 7. Prior to the commencement of the development, full details of the alignment, height and appearance of all boundary treatment, including but not limited to fences, walls and gates to be erected ... view the full minutes text for item 219.