Resolved
That the application be approved with the following conditions: 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed pursuant to section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Site Location Plan: Dwg no 21/55/6 Site Layout: Dwg no 21/55/5B Proposed Building Plan: Dwg no 21/55/3 REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent. 3. The external facing materials, detailed on the approved plans, shall be used and no others substituted. REASON: To ensure that the materials to be used are appropriate to the locality. 4 Prior to the commencement of the development the following shall be submitted to and approved in writing by the Local Planning Authority: i. A drainage scheme and layout to show how surface water will be sustainably managed ii. Use of sustainable drainage systems to manage surface water from the additional impermeable surfaces resulting from the proposals The drainage scheme must include: ( i ) Evidence that the National Planning Practice Guidance (NPPG) hierarchy has been followed and the proposed scheme in accordance with the hierarchy- the following drainage hierarchy should be investigated by the developer when considering a surface water sustainable drainage system and that surface water runoff should be discharged as high up the following hierarchy of drainage options as reasonably practical: 1. into the ground (infiltration); or 2. to a surface water body; or 3. to a surface water sewer, highway drain, or another drainage system; or 4. to a combined sewer (ii) A restricted rate of discharge of surface water agreed with the local planning authority (if it is agreed that infiltration is discounted by the investigations); and (iii)A timetable for its implementation. The approved scheme shall also be in accordance with the Non-Statutory Technical Standards for Sustainable Drainage Systems (March 2015) or any subsequent replacement national standards. The development hereby permitted shall be carried out only in accordance with the approved drainage scheme and timetable for implementation. REASON: To promote sustainable development, secure proper drainage and to manage the risk of flooding and pollution. 5. Foul and surface water shall be drained on separate systems. REASON: To secure proper drainage and to manage the risk of flooding and pollution. 6. Before the access is used for vehicular purposes that part of the access extending from the highway boundary for a minimum distance of 10m into the site shall be appropriately paved using a permeable form of bitumen macadam, concrete, block paviours, or other approved materials. REASON: To prevent loose surface material from being carried on to the public highway thus causing a potential source of danger to other road users. 7. Before ... view the full minutes text for item 326.