Resolved
RESOLVED that the application be approved subject to the following conditions: 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed pursuant to section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Location Plan OS Map Nov 2021 Proposed Building Layout Plan March 2021 Proposed Section Plan Sept 2021 Proposed Revised Elevation Plan March 2021 received on 18/01/22 REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent. Materials 3. This permission shall relate to the materials specified on elevation plan received on 18/01/22 and photograph sent on the 19/01/22 in relation to the natural stone. The development thereafter shall be constructed in accordance with the approved materials. REASON: To ensure that the appearance of the development is appropriate to the character and setting of the area. Drainage 4 The development permitted by this planning permission shall be carried out in accordance with the principles set out within the flood risk assessment drainage strategy (October 2021 / 041121 - Revision A / REFORD). The measures shall be fully implemented prior to the commencement of the use of the development and in accordance with the timing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority in consultation with the lead local flood authority. REASON: To ensure satisfactory sustainable drainage facilities are provided to serve the site in accordance with the Paragraphs 166 and 168 of the National Planning Policy Framework, Planning Practice Guidance and Defra Technical Standards for Sustainable Drainage Systems. 5. No development shall commence until details of how surface water and pollution prevention will be managed during each demolition and construction phase have been submitted to and approved in writing by the local planning authority. Those details shall include for each phase, as a minimum: a) Measures taken to ensure surface water flows are retained on-site during demolition and construction phase(s) and, if surface water flows are to be discharged they are done so at a restricted rate to be agreed with the Lancashire County Council LLFA. b) Measures taken to prevent siltation and pollutants from the site into any receiving groundwater and/or surface waters, including watercourses, with reference to published guidance. The development shall be constructed in accordance with the approved details. REASON: To ensure the development is served by satisfactory arrangements for the disposal of surface water during each demolition and construction phase(s) so it does not pose an undue flood risk on site or elsewhere and to ensure that any pollution arising from the development as a result of the demolition and construction works does not adversely impact on existing ... view the full minutes text for item 663.