Resolved
RESOLVED THAT COMMITTEE: Approve the application subject to the following conditions: 1. The development must be begun before the expiration of three years beginning with the date of this permission. REASON: This condition is required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. The development shall be carried out, except where modified by the conditions to this permission, in accordance with the Planning Application received by the Local Planning Authority on 01.08.2022 including the following plans/documents: • BTD/P20 rev A: Boundary Treatment Elevations & Details. • DS/GA01 rev C: Drainage Strategy. • SKETCH01 rev A: Flex MSE Retaining Wall Proposed Section. • MKB/C/01 rev -: House Type C, Proposed Elevations. • MKB/C/02 rev -: House Type C, Proposed Floor Plans. • MKB/D/01 rev -: House Type D, Proposed Elevations. • MKB/D/02 rev -: House Type D, Proposed Floor Plans. • LAN/BND/P01 rev D: Hard Landscaping, Soft Landscaping & Boundary Treatment Layout. • MKB/L01 rev -: Location Plan. • MKB/P01 rev G: Proposed Site Plan. • Levels Sketch rev C: Proposed Levels. • MKB/P07 rev B: S278 Highway Works, General Arrangement. • MKB/P08 rev A: S278 Highway Works, Site Boundary. • MKB/P02 rev C: Proposed Site Sections, 1 of 2. • MKB/P02.1 rev A: Proposed Site Sections, 2 of 2. • MKB/P06 rev A: Swept Path Analysis. • MKB/TS01 rev -: Topographical Survey. • MKB/P03 rev D: Traffic Management Plan. • MKB/P04 rev D: Tree Protection Plan. The development shall be retained hereafter in accordance with this detail. REASON: For the avoidance of doubt and so that the Local Planning Authority shall be satisfied as to the details. 3. The development hereby permitted shall be carried out in accordance with the approved Foul & Surface Water Drainage Design Drawing DS/GA01, Rev C - Dated 28.12.22. For the avoidance of doubt no surface water will be permitted to drain directly or indirectly into the public sewer. Prior to occupation of any dwelling, the drainage scheme shall be completed in accordance with the approved details for that dwelling. The approved measures shall be retained thereafter for the lifetime of the development. REASON: To ensure satisfactory sustainable drainage facilities are provided to serve the site to prevent an undue increase in surface water run-off and to reduce the risk of flooding. 4. No works above slab level shall commence until details of the materials to be used in the construction of the external surfaces of the dwellings (including the external walls, roof, windows, lintels, cills, soffits, fascias and bargeboards) have first been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out using the approved materials. REASON: To safeguard the visual amenities of the locality 5. (a) The development shall be carried out in accordance with the approved hard and soft landscaping and boundary treatment details (Drawing Nos. LAN/BND/P01 Rev D: Hard Landscaping, Soft Landscaping and Boundary Treatment Details, ... view the full minutes text for item 783a