Resolved
RESOLVED THAT COMMITTEE: APPROVE planning permission with the following conditions:- 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Location Plan ( dwg no. BS.23-277-03 Rev B) Site Plan with Proposed Fencing ( dwg no. BS.23-277-02 Rev C) Highway Details ( dwg no. BS.23-277-04 Rev B) Vehicle Entrance Details ( dwg no. BS.23-277-06) Fence and Gate Details ( dwg no. BS.23-277/05 Rev A) Betafence Nylofor 2D Specification Grounds Maintenance Method Statement: Protection of Public Highway (received 20th May 2024). REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent. 3. The materials to be used on the external surfaces of the development hereby approved as indicated within the application form and on drawing(s) ‘Fence and Gate Details’ ( dwg no. BS.23-277/05 Rev A) shall be implemented as indicated. REASON: In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality and respond positively to the inherent character of the area. 4. During the construction period, all trees to be retained shall be protected in accordance with British Standards BS 5837:2012 or any subsequent amendment to the British Standard. REASON: To protect trees/ hedging or landscape and visual amenity value on and adjacent to the site or those likely to be affected by the proposed development hereby approved. 5. During the construction phase of the replacement boundary fencing/gates hereby permitted:- - wheel washing facilities shall be provided and made available for use at the new site access onto Little Lane where this access is being used by site operatives or for the delivery of materials in the event that the new hard surfacing has not been installed in accordance with condition 6. These facilities shall remain in place for the duration of the construction phase of the development. - there shall be no deliveries to site or removal of existing material from site between 0830 and 0915 and between 1500 and 1545 during school term time. Reason: In the interest of protecting residential amenity and to ensure the safe operation of the Highway for the duration of the construction phase of the development. 6. The new vehicular access hereby approved shall be surfaced with tarmacadam, or similar hard bound material (not loose aggregate), for a distance of at least 5 metres behind the highway boundary, as indicated on the Site Plan with Proposed Fencing ( dwg no. BS.23-277-02 Rev C), prior to first use of the new vehicle access by a ground maintenance contractor and retained thereafter. REASON: To reduce the possibility of deleterious material being deposited in the highway in the interest of highway safety. 7. The off-site works of ... view the full minutes text for item 37a