Item507
Resolved
RESOLVED THAT COMMITTEE: GRANT planning permission subject to the following conditions:- 1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. REASON: Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchasing Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Proposed Site Plan 3343-020B 1st November 2024 Drainage Surcharge Runoff 3343-070 1st November 2024 Site Location Plan 3343-010 6th January 2023 Site Sections 3343-030A 6th January 2023 Existing Drain Section 3343-040 6th January 2023 GA Plans and Section 3343-050 6th January 2023 GA Elevations 3343-060 6th January 2023 REASON: For the avoidance of doubt as the proposal was the subject of agreed design improvements and/or amendments and to clarify which plans are relevant to the consent hereby approved. 3. All of the windows in the north and west elevations of the properties hereby approved shall be fitted with a minimum of double-glazed units with acoustic trickle ventilators. A minimum of double glazed windows shall be retained thereafter in perpetuity. Reason: to reduce potential noise impact on the future occupants from the adjacent premises. 4. The materials to be used on the external surfaces of the development as indicated within the approved details shall be implemented in accordance with the approved details. REASON: In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality and respond positively to the inherent character of the area. 5. No development shall take place, including any works of demolition or site clearance, until a Construction Management Plan (CMP) or Construction Method Statement (CMS) has been submitted to, and approved in writing by the Local Planning Authority. The approved plan / statement shall provide: • 24 Hour emergency contact number; • Details of the parking of vehicles of site operatives and visitors (which shall be wholly within the application site); • Details of loading and unloading of plant and materials (which shall be wholly within the application site; • Arrangements for turning of vehicles within the site; • Swept path analysis showing access for the largest vehicles regularly accessing the site and measures to ensure adequate space is available and maintained, including any necessary temporary traffic management measures; • Measures to protect vulnerable road users (pedestrians and cyclists); • The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; • Measures to control the emission of dust and dirt during construction; • Details of a scheme for recycling/disposing of waste resulting from demolition and construction works; • Construction vehicle routing; The approved Construction Management Plan or Construction Method Statement shall be adhered to throughout the construction period for the ... view the full minutes text for item 507.
Word for word from the decision Ribble Valley published for this meeting.
Source: democracy.ribblevalley.gov.uk