Resolved
RESOLVED THAT COMMITTEE: Grant planning permission, subject to the following conditions 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Location and Site Plan (amended 13th May 2025) Floor Plans ( dwg no. EF_OXFO_DM.2.0 dated March 2018) Proposed Side Elevation REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent. 3. The materials to be used on the external surfaces of the development as indicated within the application form and on drawing ‘Proposed Side Elevation’ shall be implemented as indicated. REASON: In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality. 4. The development hereby permitted shall not be occupied until such time as the parking facilities have been implemented in accordance with the amended Location and Site Plan received 13th May 2025. Thereafter the onsite parking provision shall be so maintained in perpetuity. REASON: To ensure adequate off-street parking provision is made to reduce the possibility of the proposed development leading to on-street parking problems locally in the interests of highway safety. 5. The parking area hereby approved shall be surfaced with porous hard bound material (not loose aggregate) or if surfaced in impermeable materials then the surface water runoff shall be drained within the site and to a suitable internal outfall. Thereafter, the porous material/ drainage shall be maintained in perpetuity. REASON: In the interest of highway safety and to prevent water from being discharged and deleterious materials being deposited onto the public highway.