Resolved
- (1) That the ownership of the be transferred to the Council. (2) That, subject to the progression of the Mineral Line Project, the bridge be strengthened by the provision of an Armco type subway structure, otherwise consideration be given to the cheaper option of strengthening by infilling under the bridge.