Grange Lane Improvements - Feasibility Study

Noted Committee 2 papers

Economic and Development Services - Oct 2000 to May 2005 noted this item on Monday 7 March 2005. Below is the council's own wording, with the papers it was decided on.

Item201

Resolved

- (1) That the conclusion of the study be noted, there being no transport economic case for the improvement of Grange Lane , Templeborough at the moment. (2) That the release of the report to relevant interested parties in the areas concerned be approved.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Economic and Development Services - Oct 2000 to May 2005

Executive summary

f:\projects\40056fe grange lane new proposal\reports \grange lane final report 171204.doc 4 Executive Summary

Introduction During consultation with stakeholders for the Sheffield and Rotherham Air Quality Action Plans, a suggestion was proposed that the air quality could be improved in Tinsley by upgrading Grange Lane, to divert traffic from Bawtry Road. FaberMaunsell has been commissioned by Rotherham Metropolitan Borough Council (RMBC) to study the potential for Grange Lane in this respect. In addition, opportunities for the Sheffield-Rotherham QBC were to be explored, as well as other potential benefits such as better links for sustainable transport modes.

Option Generation and Selection The scheme was split into three distinct parts – Grange Lane north, Grange Lane south and Complementary Measures – and ideas for these sections, referred to as ‘elements’ were identified. These came from the Action Plan stakeholders, Grange Lane study Steering Group and FaberMaunsell. The options included:-

• For the northern section of Grange Lane, on-line improvements with removal of the bridge and off-line alignments to the east of the current road, cutting across the site used for slag reduction. • For the southern section of Grange Lane, on-line improvements, plus two more radical options based on cutting across the sports fields to the east, or creating a smooth curved bend between Bawtry Road and Grange Lane. • For complementary measures, HGV ban and traffic calming or bus gate on Bawtry Road in Tinsley, HGV ban in Brinsworth and bus lane on Sheffield Road approaching M1 J34(S).

These elements were evaluated by FaberMaunsell to eliminate those unlikely to proceed, and then the remainder taken to the Grange Lane study Steering Group for discussion at a workshop. The resulting schemes, following further evaluation work, led to the definition of two schemes to be taken forward for further assessment:-

• Full Scheme, comprising largely on-line improvements on Grange Lane, but with a signal junction at Sheffield Road and a roundabout on a realigned Bawtry Road. Complementary measures comprise a bus gate on Bawtry Road west of Park House Lane, an HGV ban in Brinsworth, a westbound bus lane on Sheffield Road, and one-way northbound plugs on Norborough Road and Harrowden Road; and • Lower Cost Scheme, comprising more modest upgrades to Grange Lane by combining pedestrian and cycle facilities, and traffic lanes at junctions. The junction with Bawtry Road would be left without improvements, whilst the junction with Sheffield Road would still be signalised but to a lower standard. Complementary measures would include HGV bans in Tinsley and Brinsworth, traffic calming through Tinsley and possibly a reduced length westbound bus lane on Sheffield Road.

Scheme Alignment, Costs and Programme The Full Scheme alignment would require the purchase of land from 3 three owners – Heckett Multiserv (SR), Exel Logistics and the Phoenix Sports and Social Club. No land appears to be required from Corus. The existing bridge is proposed to be removed, and land used by the slag reduction operation (owned by Heckett Multiserv) is assumed to require capping to prevent environmental contamination.

The scheme is predicted to cost £7.8m at current prices including 15% risk, with an estimated average annual maintenance cost of £35,000. Major cost risks include the diversion of buried plant such as pipelines and cables, and the cost of any environmental remediation, if required. The Lower Cost Alternative Scheme would be expected to cost in the region of £5.4m with 15% risk. These costs include Complementary Measures, which amount to £1.7m and £1.3m respectively for both schemes.

It is estimated that the scheme could open during 2011, allowing for a Public Inquiry should it be required.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Grange Lane Executive SummaryReport 70 KB DownloadRead as text
PDF
Grange Lane Improvements: Feasibility StudyReport 36 KB Download

At this meeting

Whole meeting

Who was there

4 of 6 attended
GS
Councillor Gerald SmithChair, present
SW
Councillor Sheila WalkerSenior Advisor, present
PB
Councillor Patrick BurkeMember, apologies
DH
Councillor David HallMember, present
DP
Councillor Dave PickeringGuest, present
RS
Councillor Richard S. RussellGuest, apologies

On this subject at Rotherham

Search all
  1. Grange Lane Improvements - Feasibility StudyThis decision
  2. Consideration of an application (made in accordance with s.17 of the Licensing Act 2003) for the Grant of a Premises Licence for the premises described as The Vintage Booth, 14 Grange Lane, Maltby, Rotherham, S66 7DADecided
  3. Courtesy Consultation from Doncaster MBC - Erection of One Wind Turbine and associated infrastructure at Conisbrough Grange Farm, Common Lane, Ravenfield (RB2015/1023)Noted
  4. Appeal decision - against refusal of planning permission for the change of use of barn to form 4 holiday apartments at falconer grange farm, smallage lane, fence (rb2010/0478)Noted
  5. Tree Preservation Order No 8 2008 – Trees within the curtilage of New Grange, Anston Hall, Quarry Lane, North AnstonDecided
  6. Visit of Inspection - Erection of a building to form grain store and formation of landscaped bund at The Farm, Newhall Grange, Newhall Lane, Carr for S. Hinchcliffe & Son (RB2008/1168)Deferred

More from Rotherham Economic and Development Services - Oct 2000 to May 2005

All decisions
MeetingDecisionOutcome
9 May 2005 Bus Strategy 2006-2011- That [name removed] be thanked for his presentation. Decided Open
9 May 2005 South Yorkshire Passenger Transport Authority Bus Strategy Consultation- That the response to the consultation, as outlined in the report submitted, be agreed, and the consultation questio... Agreed Open
9 May 2005 Regional Transport Matters- That the report be noted. Noted Open
9 May 2005 Petition requesting Traffic Calming on Melton Green, West MeltonResolved :- (1) That the lead petitioner be informed that currently the Council does not have any plans to traffic ca... Decided Open
9 May 2005 Kimberworth Road/Bradgate Lane/Psalters Lane, Kimberworth- (1) That the necessary consultations be undertaken regarding the proposed scheme. (2) That authority be given for t... Decided Open