Economic and Development Services - Oct 2000 to May 2005 noted this item on Monday 7 March 2005. Below is the council's own wording, with the papers it was decided on.
- (1) That the conclusion of the study be noted, there being no transport economic case for the improvement of Grange Lane , Templeborough at the moment. (2) That the release of the report to relevant interested parties in the areas concerned be approved.
Word for word from the decision Rotherham published for this meeting.Source: moderngov.rotherham.gov.uk
Report to Economic and Development Services - Oct 2000 to May 2005
Executive summary
f:\projects\40056fe grange lane new proposal\reports \grange lane final report 171204.doc 4 Executive Summary
Introduction During consultation with stakeholders for the Sheffield and Rotherham Air Quality Action Plans, a suggestion was proposed that the air quality could be improved in Tinsley by upgrading Grange Lane, to divert traffic from Bawtry Road. FaberMaunsell has been commissioned by Rotherham Metropolitan Borough Council (RMBC) to study the potential for Grange Lane in this respect. In addition, opportunities for the Sheffield-Rotherham QBC were to be explored, as well as other potential benefits such as better links for sustainable transport modes.
Option Generation and Selection The scheme was split into three distinct parts – Grange Lane north, Grange Lane south and Complementary Measures – and ideas for these sections, referred to as ‘elements’ were identified. These came from the Action Plan stakeholders, Grange Lane study Steering Group and FaberMaunsell. The options included:-
• For the northern section of Grange Lane, on-line improvements with removal of the bridge and off-line alignments to the east of the current road, cutting across the site used for slag reduction. • For the southern section of Grange Lane, on-line improvements, plus two more radical options based on cutting across the sports fields to the east, or creating a smooth curved bend between Bawtry Road and Grange Lane. • For complementary measures, HGV ban and traffic calming or bus gate on Bawtry Road in Tinsley, HGV ban in Brinsworth and bus lane on Sheffield Road approaching M1 J34(S).
These elements were evaluated by FaberMaunsell to eliminate those unlikely to proceed, and then the remainder taken to the Grange Lane study Steering Group for discussion at a workshop. The resulting schemes, following further evaluation work, led to the definition of two schemes to be taken forward for further assessment:-
• Full Scheme, comprising largely on-line improvements on Grange Lane, but with a signal junction at Sheffield Road and a roundabout on a realigned Bawtry Road. Complementary measures comprise a bus gate on Bawtry Road west of Park House Lane, an HGV ban in Brinsworth, a westbound bus lane on Sheffield Road, and one-way northbound plugs on Norborough Road and Harrowden Road; and • Lower Cost Scheme, comprising more modest upgrades to Grange Lane by combining pedestrian and cycle facilities, and traffic lanes at junctions. The junction with Bawtry Road would be left without improvements, whilst the junction with Sheffield Road would still be signalised but to a lower standard. Complementary measures would include HGV bans in Tinsley and Brinsworth, traffic calming through Tinsley and possibly a reduced length westbound bus lane on Sheffield Road.
Scheme Alignment, Costs and Programme The Full Scheme alignment would require the purchase of land from 3 three owners – Heckett Multiserv (SR), Exel Logistics and the Phoenix Sports and Social Club. No land appears to be required from Corus. The existing bridge is proposed to be removed, and land used by the slag reduction operation (owned by Heckett Multiserv) is assumed to require capping to prevent environmental contamination.
The scheme is predicted to cost £7.8m at current prices including 15% risk, with an estimated average annual maintenance cost of £35,000. Major cost risks include the diversion of buried plant such as pipelines and cables, and the cost of any environmental remediation, if required. The Lower Cost Alternative Scheme would be expected to cost in the region of £5.4m with 15% risk. These costs include Complementary Measures, which amount to £1.7m and £1.3m respectively for both schemes.
It is estimated that the scheme could open during 2011, allowing for a Public Inquiry should it be required.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Economic and Development Services - Oct 2000 to May 2005 at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.