Resolved
- (1) That route option E be progressed as the alignment for the Waverley Link Road . (2) That option E be fully appraised in accordance with Annex E of the Guidance for Local Transport Plans and submitted to the DfT as part of the South Yorkshire Annual Progress Report for 2005 for the South Yorkshire Local Transport Plan 2001-2006.