Resolved
- (1) That the results of the stakeholder consultation, set out in Appendix B to the report, be noted. (2) That the revised draft LTP2 be endorsed. (3) That the submission be approved as the provisional LTP2 to be submitted to Government by 31 st July, 2005. (4) That the continuing broader consultation on LTP2 be noted, along with the need to refine the document for full submission in March 2006. (5) That the report be referred to the Cabinet for decision.