Resolved
Resolved :- (1) That the report be received. (2) That the Cabinet Members continue to receive monthly updates.
Regeneration and Development Services and Streetpride decided this item on Monday 26 November 2007. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved :- (1) That the report be received. (2) That the Cabinet Members continue to receive monthly updates.
To outline the scheme details and report commencement of works.
It be resolved that:
This report be noted. 7. Proposals and Details
Cabinet Member for Regeneration and Development Services will recall earlier reports on the Waverley Link Road: Junction of B6533 Poplar Way/Europa Link with A630 Sheffield Parkway (Minute No 258 of 9 May 2005 and No 48 of 20 July refer). These reports approved the principle of the scheme and authorised bids to be submitted to the Objective 1 Programme Directorate for funding of the B6533 Poplar Way/Europa Link/A630 Sheffield Parkway junction improvement.
This scheme is one of several identified in the Rotherham/Sheffield Motorway Corridor Study (Babtie Study) which was commissioned to consider the complex relationship between land use, transportation, economic regeneration and the environment as a result of South Yorkshire gaining Objective 1 status for European Union funding. The study set out an Investment Strategy that would realise the economic development potential of the area and provide a balanced transport infrastructure to enable future development. This study was then developed into the Memorandum of Understanding – Strategic Transportation Initiatives study which identified that one of the key constraints to be addressed is the Catcliffe Interchange (A630 Sheffield Parkway/B6533 Poplar Way/Europa Link Junction). This scheme is described below.
The adopted solution includes widening the carriageway through the bridge beneath the Sheffield Parkway to provide two lanes of traffic in both directions. The existing footways beneath the bridge will be rerouted through a new underpass to make room for the new carriageways. The new underpass will be constructed beneath the Parkway, to the immediate west of the existing bridge and is for pedestrian, cycling and equestrian use. The route forms part of the National Cycle Network and the Trans Pennine Trail. There will be improvements to parts of the slip roads, the roundabout junctions and footway/cycleways. A dedicated slip lane from Europa Way to the eastbound Parkway is also included. The layout of works is shown on the attached sketches.
The original design had envisaged two underpasses, to the east and west of the existing bridge but as the detailed design was developed, it became clear that a single, larger underpass would provide a better practical and financial solution.
One of the major concerns during the development of this scheme was how would the traffic on both the A630 Sheffield Parkway and B6533 Poplar Way/Europa Link be accommodated during the works which include excavating across the Parkway to construct the underpass. It is fortunate that at this location, the bridge which carries the Parkway is significantly wider than the carriageway it carries. This is a legacy of the original junction configuration here before Europa Link was constructed. This extra width has been used to enable the live traffic lanes to be moved sideways, in phases to suit the underpass construction. Accordingly, it has proved possible to maintain two traffic lanes in both directions on the Parkway throughout the works, albeit with a temporary speed reduction to 40mph for safety reasons.
The works on Poplar Way/Europa link away from the bridge will involve having alternate one way traffic controlled by temporary traffic signals for periods of the work. When the carriageway widening is carried out beneath the bridge, there will be one lane open to traffic travelling south, ie towards Catcliffe. Traffic travelling north and wishing to continue onto Europa Link or the eastbound Parkway will be diverted onto the westbound Parkway
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Catcliffe Interchange Improvements (A630 Sheffield/Parkway/B6533 Poplar Way/Europa Link Junction)Report | 37 KB | DownloadRead as text |
PDF |
Catcliffe map 1, 26/11/2007 Cabinet Member for Regeneration and Development ServicesPlan | 181 KB | Download |
PDF |
Catcliffe map 2, 26/11/2007 Cabinet Member for Regeneration and Development ServicesPlan | 391 KB | Download |
Follow Regeneration and Development Services and Streetpride at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Apr 2009 | Revenue Budget Monitoring - April, 2008 to February, 2009- (1) That the forecast outturn position of an overspend of £100,000 for the Environment & Development Services Direc... | Noted | Open |
| 20 Apr 2009 | Real Time Intelligent Detection (RID) – Phase 1, Traffic Signal Optimisation- (1) That the RID Bus Priority Measures report be approved. (2) That the recommendations of Phase 1 be implemented d... | Approved | Open |
| 20 Apr 2009 | Traffic Management Act 2004 - South Yorkshire Network Management Plan and RMBC Action Plan- (1) That the South Yorkshire Network Management Plan be noted. (2) That the RMBC Action Plan for 2009/10 be approve... | Noted | Open |
| 20 Apr 2009 | Fixed Penalty Notice Scheme for Street WorksResolved :- (1) That, with the exception of Section 1.6, the Fixed Penalty Notice Scheme for Street Works (as now rep... | Decided | Open |
| 20 Apr 2009 | Connect2 Programme Joint Rotherham/Sheffield Walking and Cycling ProjectResolved :- (1) That the Rotherham elements of the project be implemented on a phased approach by 2012 as described w... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.