Resolved
Resolved :- That the proposed works and the associated funding arrangements be noted.
Cultural Services and Sport from May, 2009 to July, 2010 noted this item on Tuesday 20 October 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved :- That the proposed works and the associated funding arrangements be noted.
Fix for support
Support Bracket 300mm above ground level &
Sculptural Ribbon Fixing to Wall Sculptural ribbon
Angled Bracket Wall !
PLAN
Coiled ribbon-can be support for main ribbon strip coming
Concrete foundation off the wall
AK Landscaped Area*
planting l , ) \ ret 4 ae fray "PAVEMENT LEVEL | ~ \ == Concrete Foundation D a — a a \ | 100mm below ground level \ Etched Text a | | ——— — - — é Scale 1:50 } Fi =a ao ii . Panel 5 Panel 5 Panel 4 Panel 3 Panel 2 Panel 1 } Landscaped Area anel 67 NTS *Landscaped Area - this area to be designed, prepared and maintained by RMBC
Ribbon sculpture secured to block concrete foundation
set at least 100m below ground level with anchor bolts set - = r 4mm Thick Stainless Steel
in resin. ‘
_— SARIN NETH FREN ootlepereacrencees acta ee | — _ — = - lle GRASS BANK--~ o + ff PAVEMENT LEVEL MN * —_ See drw no. A3/393/415a Sv SS ~ 2 Panel 6 Panel 5 Panel 4 ; “Panel 3 PC, en 14475 iF = = x | SCALE 1:50 x oo e
TOWARDS ROTHERHAM
NOTE:
~ All measurements in mm
~ Details may vary from those shown here
~ All edges to be free from burrs & sharp points rounded
Existing Site
KNOLLBECK LANE
TOWARDS BARNSLEY
PROJECT:
CLIENT:
BRAMPTON PUBLIC ART PROJECT
ROTHERHAM METROPOLITAN BOROUGH COUNCIL
TITLE: DETAILED DESIGN FOR RIBBON SCULPTURE - LAYOUT ASS arts JOB: 393 _DRW NO.: A3/393/414a | NOTES:
+The An Depst, Asquith incustiel Estatn, Echton Road. -
Gaegreve, Noch Yorkahine 023 356 DATE: 24/8/09 | SCALE: 1:50 14/8/09- 3 Extra ribbons added Toh O1756 749222 fax: 01756 740034 nl —_ DRAWN BY: VN |
web woe. chysalicarte org. i
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Brampton Modern Art Attachment 1.docReport | 1 pages | DownloadRead as text |
PDF |
Brampton Modern Art Attachment 2.docReport | 1 pages | Download |
PDF |
Brampton Modern Art Attachment 3Report | 2 pages | Download |
PDF |
Proposed Public Art Feature on Knollbeck Lane, Brampton: Gateway Improvement WorksReport | 4 pages | Download |
Follow Cultural Services and Sport from May, 2009 to July, 2010 at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Jul 2010 | Minutes of the previous meeting held on 29th June, 2010Resolved :- That the minutes of the meeting of the Cabinet Member held on 29 th June, 2010, be signed as a true record. | Decided | Open |
| 20 Jul 2010 | Rotherham Green Space Strategy – Final VersionResolved :- (1) That the Green Space Strategy be referred to Cabinet for adoption by full Council. (2) That, subject ... | Approved | Open |
| 20 Jul 2010 | ‘Active Rotherham’ A Strategy for Sport and Physical Activity 2010 - 2020Resolved :- (1) That an annual progress report against the Strategy’s 10 year vision be submitted to the Cabinet Memb... | Approved | Open |
| 20 Jul 2010 | Exclusion of the press and publicResolved :- That, under Section 100A(4) of the Local Government Act 1972, the press and public be excluded from the m... | Decided | Open |
| 29 Jun 2010 | Minutes of the previous meeting held on 15th June, 2010Resolved :- (1) That the minutes of the meeting of the Cabinet Member held on 15 th June, 2010, with the above cleric... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.