Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012) approved this item on Monday 18 July 2011. Below is the council's own wording, with the papers it was decided on.
Resolved :- (1) That approval be given to consult on the proposals identified in the attached Drawing No. (126/17/TT149). (2) That the detailed design be undertaken on the scheme. (3) That, subject to no objections being received, the scheme be implemented within the 2011/12 financial year. (4) That the junction improvements and signalised ... view the full minutes text for item 14.
Word for word from the decision Rotherham published for this meeting.Source: moderngov.rotherham.gov.uk
Report to Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012), 3 pages
Recommendations
It is recommended Cabinet Member resolves that:
i) approval is given to consult on the proposals identified in the attached drawing (126/17/TT149)
ii) detailed design is undertaken on the scheme
iii) subject to no objections being received the scheme is implemented within the 2011/12 financial year 7. Proposals and Details
This report follows a previous submission to Cabinet Member for Regeneration and Development Services Matters on 27th October 2008 regarding a traffic management scheme on Wellgate. Minute 120 refers.
The 2008 report identified two sections of Wellgate that were to be improved by a variety of measures.
Section one was the section between Doncaster Gate and the Hollowgate Junction. This included a combination of speed cushions and flat top humps along with minor amendments to parking and loading bays. These works have now been completed.
Section two was to make changes to the Hollowgate / Wellgate Junction, improve pedestrian accessibility between the Hollowgate Junction and the Clifton Lane Roundabout as well as undertake carriageway maintenance work between the two junctions. Carriageway maintenance has been carried out as planned however due to budget constraints the proposed improvement at the Hollowgate Junction was delayed. Accessibility improvements on Wellgate between the Hollowgate Junction and the Clifton Lane Roundabout were partly completed.
Funding is available in this financial year to undertake the works at the Hollowgate / Wellgate junction. The existing signal equipment is coming to the end of its life and needs to be replaced. In order to create efficiencies and cost savings we are proposing to undertake the junction improvement at the same time as the signal maintenance.
The Transportation Unit has taken the opportunity to re-examine the junction arrangement originally proposed and have made a series of alterations that now provide:
• Improved pedestrian crossings. The Hollowgate crossing is to be located on the pedestrian desire line • Advanced cycle stop lines allowing cyclists to ride to the front of a queue when the signals are on red
It is proposed that (for information) consultation is undertaken on the scheme as shown in drawing 126/18/TT149 (a copy of which is attached as Appendix A). The consultation will take place with statutory consultees (e.g. Police, Fire Brigade, etc) as well as affected residents / business owners and local ward councillors.
The proposals for the junction are as follows:
• A triangular pedestrian island segregating left turning vehicles from Wellgate into Hollowgate is constructed. The island will connect Puffin Crossings across Hollowgate. The crossings will be positioned as a stagger such that pedestrians do not walk straight across. • A Puffin Crossing is proposed across the western arm of Wellgate in a similar position to the current crossing • New signal equipment is installed around the junction • A signal controlled left turn from Wellgate into Hollowgate is installed which removes the give way line and reduces the risk of pedestrian casualties (drivers are regularly observed turning from Wellgate and passing through a red light at the stand alone crossing on Hollowgate)
The new junction arrangements will lead to a slight reduction in overall junction capacity. However the new arrangement will comfortably accommodate current and expected future traffic flows. Queue lengths and traffic delay will be similar to the current junction.
8. Finance
The Wellgate / Hollowgate junction amendments and upgrade is estimated to cost £60,000 and will be funded by the LTP strategic fund programme and traffic signal maintenance for 2011/12.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012) at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Previous Meetings- That the minutes of the previous meetings of the Cabinet Member for Town Centres, Economic Growth and Prosperity be...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.