CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Rotherham Metropolitan Borough Council

A629 Upper Wortley Road, Thorpe Hesley

Approved Committee 2 papers

Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012) approved this item on Monday 3 October 2011. Below is the council's own wording, with the papers it was decided on.

Item44

Resolved

- (1) That approval be given to commence detailed design and implementation of the proposal. (2) That the scheme be funded from the Local Transport Plan Integrated Transport Programme 2011/12 and 2012/13.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012), 2 pages

Recommendations

Cabinet Member is asked to resolve that

1. Approval be given to commence detailed design and implementation of the proposal.

2. The scheme be funded from the Local Transport Plan Integrated Transport Programme 2011/12 and 2012/13. 7. Proposals and Details Following a request to introduce a controlled crossing on the A629, Thorpe Hesley it was established following an investigation that the location meets the Councils criteria for consideration of the provision of a controlled crossing and consequently was placed on the implementation priority list with other locations that also meet the criteria. Each financial year this list (which also includes zebra crossings) is examined and crossings at a number of locations on the list are implemented based on the available budget and feasibility of installation. The budget settlement for 2011/12 allows the request for a crossing near to Thorpe Hesley J&I to be implemented. Currently a School Crossing Patrol (SCP) operates on the A629 near to Eldertree Road and it is envisaged that the proposed controlled crossing will be sited in the same location. (See Appendix A). Following the introduction of the puffin crossing it is anticipated that a SCP would no longer operate at this location. A puffin crossing is being proposed as vehicle speeds and volume of traffic along the A629 in this location are above that recommended for a zebra crossing facility.

8. Finance The cost of the works is expected to be approximately £100,000 with funding being available from the Local Transport Plan Integrated Transport Programme 2011/12, though this scheme may require funding from 2012/13 dependant upon the exact start date of the scheme.

9. Risks and Uncertainties Statutory Undertakers apparatus may need to be diverted as a consequence of this proposal. The exact cost of any diversions has yet to be determined

10. Policy and Performance Agenda Implications The proposed scheme is in line with the Councils’ objectives of achieving safer roads and encouraging walking and also accords with the Equalities Policy.

11.Background Papers and Consultation Consultation with statutory consultees, Ward Members and affected frontages has been undertaken. No objections were received to the proposal though specific requests were made by a number of residents with regard to any noise emitted from the crossing equipment. It is felt that these concerns can be addressed during the detailed design of the crossing.

Contact Name : Nigel Davey, Engineer, Ext 22380 [email protected]

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A629 Upper Wortley Road, Thorpe HesleyReport 2 pages DownloadRead as text
PDF
Item 1: A629 Crossing location Thorpe Hesley-Layout1Report 1 pages Download

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. A629 Upper Wortley Road, Thorpe HesleyThis decision
  2. A629 Upper Wortley Road/London Way - Bus Accessiblity and Highway ImprovementsDecided
  3. Petition for traffic calming measures on Upper Wortley Service Road, DroppingwellDecided
  4. Proposed closure of public footpath from Webster Crescent and Hill View Road to Upper Wortley RoadDecided
  5. Petition - Request for Traffic Calming on Upper Wortley Road Service Road, KimberworthNoted

More from Rotherham Town Centres, Economic Growth and Prosperity (from July, 2011 to May, 2012)

All decisions
MeetingDecisionOutcome
28 May 2012 Proposed cycling improvements in and towards Rotherham town centre.- (1) That the Director of Planning and Regeneration, in accordance with delegated powers, promote a Traffic Regulati... Decided Open
28 May 2012 Proposed 20 miles per hour zone within Rotherham Town Centre.- (1) That detailed design and consultation on the introduction of a 20 miles per hour zone in the Rotherham Town Cen... Decided Open
28 May 2012 Petition relating to the Withdrawal of Free Transport Assistance to Aston Fence Junior & Infant School and Aston Academy.- (1) That the concerns raised by Orgreave Parish Council be noted. (2) That the decision taken on 23 rd January (Min... Noted Open
28 May 2012 Proposed Temporary Offer of Reduced Parking Charges for Council Employees to Ease Parking Pressure on the Masbrough Area.- (1) That the report be received and its content noted. (2) That the proposal to offer a three month reduced cost pa... Noted Open
23 Apr 2012 Minutes of the Previous Meetings- That the minutes of the previous meetings of the Cabinet Member for Town Centres, Economic Growth and Prosperity be... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies