Rackford Road/Narrow Lane, North Anston - Proposed Carriageway Widening

Noted Committee 3 papers

Regeneration and Development noted this item on Tuesday 28 August 2012. Below is the council's own wording, with the papers it was decided on.

Item29

Resolved

Resolved :- (1) That the report be received and its contents noted. (2) That the objection be acknowledged, but not acceded to. (3) That approval be granted for detailed design work to be undertaken in relation to this proposed scheme at North Anston , and for the scheme to be implemented.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Regeneration and Development, 3 pages

Summary

To report the receipt of an objection to a proposed carriageway widening scheme at the junction of Rackford Road and Narrow Lane, North Anston.

Recommendations

Cabinet Member resolves that:-

i) The objection to be acknowledged and not acceded to;

ii) Approval be given for detailed design work to be undertaken in relation to this proposed scheme, and for the scheme to be implemented. 7. Proposals and Details

The scheme will involve widening of the carriageway on the north-western side of the junction by approximately 1 metre to accommodate the turning manoeuvres of buses and large wheel-based vehicles, together with the introduction of a new footway link and associated pedestrian dropped crossings to improve facilities for mobility impaired pedestrians and those with push-chairs. The proposals are shown on the plan attached as Appendix ‘A’.

This increase in carriageway width represents the area of verge currently being over-run by large vehicles, when turning left into Narrow Lane from Rackford Road, and reduces the impact on utility equipment in the area.

8. Finance

The scheme is estimated to cost approximately £15,000 including fees, with funding for the works identified being provided by the South Yorkshire Passenger Transport Executive from their ‘hotspots’ programme. Any additional costs incurred will be recharged to the Passenger Transport Executive.

9. Risks and Uncertainties

The estimated cost is dependent upon the need to divert Statutory Undertakers’ apparatus, and the implementation of appropriate traffic management measures while undertaking the works; these are expected to be minimal.

10. Policy and Performance Agenda Implications

The scheme is in line with the Councils’ corporate objective of safe and well maintained roads.

11. Background Papers and Consultation

Concerns have been raised by residents and the Passenger Transport Executive about the tight radii at the junction of Rackford Road / Narrow Lane which results in buses and large-wheel based vehicles having to over-run the existing grassed verge in order to make the left turn into Narrow Lane. This clearly has safety implications for any pedestrians stood in close proximity to the kerb line when large vehicles are turning and has already resulted in a number of buses being damaged as they negotiate the junction due to clipping the kerbs.

Consultations have been carried out with the Emergency Services, Councillors, Parish Council and local residents. From these consultations an objection was received from a local resident on the grounds that ‘the proposed widening would totally ruin the area by taking of more grass verge and increase in heavy traffic’, a copy of which is attached as Appendix ‘B’. As this particular junction is located within a residential area without any direct access to higher classification roads there is no evidence to suggest that there would be any increase in heavy traffic as a consequence of these works. Although some of the grassed verge will be removed, the majority of the affected area will be used to improve crossing facilities for pedestrians by introducing a footway with dropped kerb crossing facilities.

A copy of the email has also been forwarded to the South Yorkshire Transport Executive, for their information, as reference was also made to the bus route through the estate, and the objector has been made aware of this.

Contact Name : Andrew Lee, Assistant Engineer, Ext. 54489, [email protected]

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Rackford Road Appendix AAppendix 1 pages Download
PDF
Rackford Road Appendix BAppendix 1 pages Download
PDF
Rackford Road/Narrow Lane, North Anston: Proposed Carriageway WideningReport 3 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Rackford Road/Narrow Lane, North Anston - Proposed Carriageway WideningThis decision
  2. Visit of Inspection - Erection of a two storey building comprising 8 No. apartments with associated, bike store and parking area at land to rear of 60 Rackford Road, North Anston for Mr. T. Cooke (RB2010/0248)Agreed
  3. Conversion of agricultural buildings to three dwellings and erection of a detached garage being amendments to planning permission RB2001/1712 at Rackford Farm, Rackford Road North Anston (RB2008/0291 and RB2008/0514)Decided

More from Rotherham Regeneration and Development

All decisions
MeetingDecisionOutcome
2 Jun 2014 Minutes of the previous meetings held on 6th May 2014 and on 8th May 2014Resolved :- That the minutes of the meetings of the Cabinet Member and Advisers for Regeneration and Development, hel... Approved Open
2 Jun 2014 A633 Rotherham to Parkgate - Bus Priority MeasuresResolved :- (1) That the report be received and its contents noted. (2) That the principle of a bus and cycle only la... Noted Open
2 Jun 2014 Objections to Proposed Waiting Restrictions - Areas of Wellgate and Moorgate, RotherhamResolved :- (1) That the report be received and its contents noted. (2) That, after due consideration by Elected Memb... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Temple Crescent, BramleyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Cook Avenue, MaltbyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies