Rotherham Metropolitan Borough Council
Regeneration and Development, Monday 7 January 2013

Proposed Improvements to the Canal Towpath between Centenary Way, Rotherham and Tinsley, Sheffield

Noted Committee 2 papers

Regeneration and Development noted this item on Monday 7 January 2013. Below is the council's own wording, with the papers it was decided on.

Item79

Resolved

- (1) That the report be received and its contents noted. (2) That detailed design and construction be undertaken to improve the surface of the canal towpath between Rotherham town centre at Centenary Way and Tinsley just beyond the Rotherham and Sheffield boundary, with a 2.5 metres wide bound, waterproof surface constructed of tarmacadam or similar material. (3) That the Director of Streetpride be authorised to enter into a licence agreement between the Canal and River Trust and the Council to undertake the construction and future maintenance of the new canal towpath on Canal and River Trust land. (4) That the Director of Streetpride be authorised to enter into a third party works agreement with the Canal and River Trust committing the Council to work to the Code of Practice for Works Affecting the Canal and River Trust during the construction process.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Regeneration and Development

Summary

To seek approval to improve the surface of the canal towpath between Rotherham Town Centre (adjacent Centenary Way) and Tinsley for cyclists.

Recommendations

It is recommended Cabinet Member resolve that:

i) detailed design and construction is undertaken to improve the surface of the canal towpath between Rotherham town centre at Centenary Way and Tinsley just beyond the Rotherham / Sheffield boundary with a 2.5 meter wide, bound, waterproof surface constructed of tarmacadam or similar material.

ii) the Director of Streetpride be approved to enter into a licence agreement between the Canal and River Trust and the Council to undertake the construction and future maintenance of the new canal towpath on CRT land.

iii) The Director of Streetpride be approved to enter into a third party works agreement with the Canal and River Trust committing the Council to work to Code of Practice for Works Affecting the Canal and River Trust during the construction process. 7. Proposals and Details

As part of South Yorkshire’s successful Local Sustainable Transport Fund main bid to the Department for Transport proposals were included to improve the surface of the canal towpath for cyclists between Rotherham town centre and Sheffield city centre. This will improve sustainable access to employment and training in the Lower Don Valley, Sheffield and Rotherham. This route forms part of the Sustrans National Cycle Network and Trans Pennine Trail.

Within Rotherham the canal towpath is currently in a poor condition with little or no hard surface and during wet weather the path can become very muddy, often with large areas of standing water, making it impassable to many.

It is proposed to introduce a 2.5 meter wide, bound, waterproof surface constructed of tarmacadam or similar material between Rotherham town centre and the Rotherham/ Sheffield boundary and beyond to Tinsley. This route is highlighted in red on the attached drawing (Appendix A). This initial phase of construction works includes the section from Centenary Way towards Sheffield. In order to retain scheme continuity it has been agreed with Sheffield City Council that Rotherham will deliver the towpath improvements within Sheffield to Half Penny Bridge near Tinsley. From this point the towpath is in a good condition and does not require further works.

Links onto the canal towpath from Templeborough, Masbrough and Kimberworth have also been identified for improvement from surrounding communities and employment sites. These are highlighted in green on the attached plan. It is also proposed to remove the existing cantilevered section of the canal towpath near New York Stadium following the construction of a new canal towpath route through the stadium development as part of the planning permission for the site. The cantilevered section is currently a maintenance liability and not adequate for cyclists to use. These works will form subsequent phases of the scheme.

Sheffield City Council are also proposing to improve sections of the Five Wiers walk route (beyond the canal towpath and which links to it) into the city centre that are currently in a poor condition using their allocation of the funding available.

In order to promote the canal towpath route when completed it will be well signed along its length and also from adjacent areas including Rotherham town centre and Sheffield city centre. It is also proposed to undertake promotional events such as guided rides and send out press releases to raise the profile of the new cycle route.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed Improvements to the Canal Towpath between Centenary Way, Rotherham and Tinsley, SheffieldReport 39 KB DownloadRead as text
PDF
RothSheffcanal routeReport 2.4 MB Download

At this meeting

Whole meeting

Who was there

3 of 3 attended
GS
Councillor Gerald SmithChairman, present
MC
Councillor Maggi ClarkMember, present
MG
Councillor Margaret GodfreyMember, present

On this subject at Rotherham

Search all
  1. Proposed Improvements to the Canal Towpath between Centenary Way, Rotherham and Tinsley, SheffieldThis decision
  2. Proposed Improvements to A6021 Hollowgate/A618 Moorgate Road JunctionNoted
  3. Proposed accessibility improvements A6021 Broom Road, RotherhamNoted
  4. Proposed Shared Use Footpath Improvements - Footpath No.23 at SwintonNoted
  5. Proposed cycling improvements in and towards Rotherham town centre.Decided
  6. A630 Rotherham to Thrybergh Smart Route - Proposed improvementsDecided

More from Rotherham Regeneration and Development

All decisions
MeetingDecisionOutcome
2 Jun 2014 Minutes of the previous meetings held on 6th May 2014 and on 8th May 2014Resolved :- That the minutes of the meetings of the Cabinet Member and Advisers for Regeneration and Development, hel... Approved Open
2 Jun 2014 A633 Rotherham to Parkgate - Bus Priority MeasuresResolved :- (1) That the report be received and its contents noted. (2) That the principle of a bus and cycle only la... Noted Open
2 Jun 2014 Objections to Proposed Waiting Restrictions - Areas of Wellgate and Moorgate, RotherhamResolved :- (1) That the report be received and its contents noted. (2) That, after due consideration by Elected Memb... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Temple Crescent, BramleyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Cook Avenue, MaltbyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies