Resolved
Resolved :- (1) That the report be received and its contents noted. (2) That the Overview and Scrutiny Management Board notes the Highways Agency’s proposed ... view the full minutes text for item 106.
Overview and Scrutiny Management Board noted this item on Friday 25 January 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved :- (1) That the report be received and its contents noted. (2) That the Overview and Scrutiny Management Board notes the Highways Agency’s proposed ... view the full minutes text for item 106.
The report outlines the Highways Agency’s (HA) proposed Managed Motorways proposals on sections of the M1 motorway within South Yorkshire, which are due to commence in April 2013. The proposals involve the introduction of a new All Lane Running standard which sees the conversion of the Hard Shoulder to a permanent running lane. The report also sets out the risks associated with the proposals and the views of the emergency services.
It is recommended that Overview and Scrutiny Management Board: i) Note the Highways Agency’s proposed Managed Motorways All Lane Running (MM-ALR) proposals. ii) Note that due to the timescales associated with responding to the HA’s formal consultation that Cabinet considered the draft consultation response at its meeting on 16 January 2013. iii) Provide any additional observations and comments on the proposed draft consultation response and that these are included in the final consultation response. 7. Proposals and Details
In early 2012 the Highways Agency (HA) announced their intention to undertake improvements to the national motorway network, including capacity improvements on the M1 between Junctions 28 to 31 and 32 to 35A. These sections of the M1 are some of the worst congested and improving the capacity along these sections of motorway is welcome in terms of both its benefit to improved traffic flow and journey times, and its associated impact on the economy. Plans indicating the proposed extents of the Managed Motorways schemes within South Yorkshire are attached at Appendices A and B.
In March, the HA published its Interim Advice Note (IAN) 161/12, Managed Motorways – All Lane Running (MM-ALR) and it became clear that the scheme design represented a departure from the existing motorway standards associated with existing hard shoulder running schemes contained within the national Design Manual for Roads and Bridges (DMRB). The HA in issuing the IAN acknowledge that this is a new standard to work from and the section of the M1 between junction 32 and 35A is proposed to be the first section of motorway implemented using this new standard.
The M42 was the first motorway to operate a Managed Motorway scheme called Dynamic Hard Shoulder (DHS) running. This involves active traffic management using overhead gantry signs to indicate to drivers those periods (usually the most congested) when the hard shoulder can be used by all traffic. Active traffic management involving reduce speed limits are also in place. Whilst many of the features of dynamic hard shoulder running are automated the opening and closing of the hard shoulder requires a HA resource to remotely check that there are no obstructions or other safety risks. The M42 scheme has then been followed by further DHS schemes on the M62 between Junctions 25 and 26, and 29 and 30.
The proposed MM – ALR removes the need for this resource as the scheme will involve the permanent conversion of the hard shoulder to a running lane for use at all times of the day, both during busy periods and at quieter off-peak periods. The default position will be that all lanes of the motorway will operate at a speed limit of 70mph. In addition queue protection and congestion systems will be introduced to determine when variable mandatory speed limits will automatically be displayed on verge mounted and overhead gantry signing. At the side of the previous hard shoulder emergency refuge areas with roadside telephones will be provided.
Emergency Services view
South Yorkshire Police (SYP) and South Yorkshire Fire and Rescue (SYFR) have considered the proposed MM-ALR standards and have raised their concerns regarding new standard. These views have also been shared by ACPO and CFOA and have been expressed to the HA.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
mmalr3235 1Appendix A | 226 KB | Download |
PDF |
mmalr2831Appendix B | 198 KB | Download |
PDF |
HA consultation letterAppendix C | 245 KB | Download |
PDF |
M1 J32 to 35a MM Consultation documentAppendix C | 1.2 MB | Download |
PDF |
Draft Consultation ResponseAppendix D | 53 KB | Withheld: personal details |
PDF |
Highways Agency Managed Motorways programmeReport | 39 KB | DownloadRead as text |
Follow Overview and Scrutiny Management Board at Rotherham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Nov 2026 | Minutes of meeting Wednesday 7 October 2026 of Overview and Scrutiny Management BoardThat the Minutes of the meeting of the Overview and Scrutiny Management Board held on 7 October 2026 be approved as a... | Approved | Open |
| 10 Nov 2026 | Work ProgrammeThat the Overview and Scrutiny Management Board: 1. Approved the current work programme. 2. Agreed that the Governanc... | Approved | Open |
| 10 Nov 2026 | Forward Plan of Key DecisionsThat the Overview and Scrutiny Management Board: 1. Agreed that the following items would be added to the December ag... | Agreed | Open |
| 10 Nov 2026 | South Yorkshire Mayoral Combined Authority Overview and Scrutiny CommitteeResolved That: The Overview and Scrutiny Management Board received an update on the activities of the South Yorkshire... | Decided | Open |
| 7 Oct 2026 | Minutes of meeting Tuesday 8 September 2026 of Overview and Scrutiny Management BoardThat the Minutes of the meeting of the Overview and Scrutiny Management Board held on 8 September 2026 be approved as... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.