Rotherham Metropolitan Borough Council
Regeneration and Development, Friday 14 June 2013

Proposed pedestrian improvement scheme, Main Street, Rotherham Town Centre

Noted Committee 2 papers

Regeneration and Development noted this item on Friday 14 June 2013. Below is the council's own wording, with the papers it was decided on.

Item13

Resolved

Resolved :- (1) That the report be received and its contents noted. (2) That the consultation process and the detailed design work be undertaken in respect of the proposed pedestrian improvement scheme on Main Street, Rotherham, at its junction with The Statutes, adjacent to Riverside House and as detailed in the submitted report and drawing. (3) That, subject to there being no objections received, the scheme be implemented.
Word for word from the decision Rotherham published for this meeting. Source: moderngov.rotherham.gov.uk

Follow this further

Built from Rotherham's papers

What the report saysPro

Report to Regeneration and Development, 3 pages

Summary

The report details the proposal for a pedestrian improvement scheme on Main Street, Rotherham Town Centre

Recommendations

It is recommended the Cabinet Member resolves that:

a) consultation and detailed design for the proposal is undertaken and,

b) subject to no objections being received, that the scheme be implemented. 7. Proposals and Details The number of pedestrians visiting Riverside House has steadily increased following the phased consolidation of town centre offices into the new offices since 2011.

The main pedestrian routes to access Riverside House are along Main Street from both directions including from Market Street across the Main Street zebra crossing. A further route is available from the railway station via The Statutes, however, there is no controlled crossing where The Statutes meets Main Street. Requests have been received from visitors, employees and the Council’s Disabled Workers Group for a controlled crossing in this location to make it easier to cross the road.

A pedestrian/vehicle survey was undertaken, which demonstrated that the criteria for a controlled crossing were met. Several design options were considered including: • a signal controlled pelican / puffin crossing - the highway layout does not permit a crossing of this kind to be installed due to the proximity of the side roads being less than the permitted 20m distance to the crossing. • A signalised junction including a pedestrian crossing - modelling of traffic flow showed that at peak times traffic would back up along Main Street in both directions particularly affecting the efficiency of the Westgate traffic signals. In view of the impact on the road network it was decided that a signalised junction would not be the most appropriate option to improve crossing facilities at this location. • A formal crossing point on Main Street near to The Statutes and also to improve the pedestrian crossing provision along the whole of Main Street.

This third option has been worked up into an outline scheme (see appendix A) which includes: • a new zebra crossing outside Riverside House between the junctions with Don Street and The Statutes; • the creation of 2 (net) additional disabled parking spaces next to Riverside House; • an extension of the town centre 20mph zone to include Don Street, The Statutes and Main Street (from Westgate to New York Way); • amendments to the kerb lines of The Statutes and Don Street to reduce the crossing widths for pedestrians; • amendments to the existing imprint surfacing on Main Street to form a gateway feature tied into the start of 20mph zone and also an imprint surface on side road entrances at Don Street and Market Street; • new enhanced paving materials along parts of Main Street.

It is also planned to paint lighting columns and signposts black and that several bollards along Main Street will be removed in order to reduce street clutter.

Consultation with the emergency services and other organisations will have to be undertaken in order to promote the change in speed limit. South Yorkshire Police have informally raised concerns that vehicle may not comply with the proposed 20mph speed limit however unless traffic calming is installed as part of the scheme. It is proposed that, following completion of the scheme, vehicle speed surveys will be undertaken and, if they are not commensurate with the proposed 20mph limit, then we will consider further measures (including vertical traffic calming) to ensure that the proposed speed limit is adhered to.

8. Finance The cost of the recommended scheme is estimated at £350,000; funding is available from the Local Transport Plan Integrated Transport Capital Programme for 2013/2014.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix AAppendix A 1 pages Download
PDF
Proposed pedestrian improvement scheme, Main Street, Rotherham Town CentreReport 3 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Rotherham

Search all
  1. Proposed pedestrian improvement scheme, Main Street, Rotherham Town CentreThis decision
  2. Main Street, Rotherham - proposed Pedestrian Improvement SchemeNoted
  3. Fenton Road, Bradgate - Proposed Controlled Pedestrian Crossing and Cycle Improvement SchemeNoted
  4. Proposed Pedestrian Refuges - Biscay Way and Station Road, Wath upon Dearne.Decided
  5. Proposed Pedestrian Crossing on Worksop RoadDeferred
  6. Proposed New Pedestrian Refuges - variousApproved

More from Rotherham Regeneration and Development

All decisions
MeetingDecisionOutcome
2 Jun 2014 Minutes of the previous meetings held on 6th May 2014 and on 8th May 2014Resolved :- That the minutes of the meetings of the Cabinet Member and Advisers for Regeneration and Development, hel... Approved Open
2 Jun 2014 A633 Rotherham to Parkgate - Bus Priority MeasuresResolved :- (1) That the report be received and its contents noted. (2) That the principle of a bus and cycle only la... Noted Open
2 Jun 2014 Objections to Proposed Waiting Restrictions - Areas of Wellgate and Moorgate, RotherhamResolved :- (1) That the report be received and its contents noted. (2) That, after due consideration by Elected Memb... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Temple Crescent, BramleyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open
2 Jun 2014 Petition - Condition of the Carriageway - Cook Avenue, MaltbyResolved :- (1) That the petition and report be received and their contents noted. (2) That the lead petitioner be in... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies