Resolved :- (1) That the report be received and its contents noted. (2) That the proposals, as now reported, to improve the Pool Green Roundabout (junction of the A630 Centenary Way, Main Street and Masbrough Street, Rotherham) to a signalised junction in accordance with the principles of WSP UK drawing number SK-005 REV E, be approved subject to agreement from the Department for Transport and the scheme be implemented subject to the satisfactory completion of the statutory processes. (3) That the Traffic Regulation Orders required to implement the scheme be secured, to include appropriate consultation in accordance with the statutory process and any objections received shall be reported to a future meeting of the Cabinet Member and Advisers for Regeneration and Development. (4) That the commission to WSP UK be extended to include detailed design processes and the monitoring and evaluation for the scheme as required by the Department for Transport.
Word for word from the decision Rotherham published for this meeting.Source: moderngov.rotherham.gov.uk
(i) The proposals to improve Pool Green Roundabout to a signalised junction in accordance with the principles of WSP drawing number SK-005 REV E, attached, are approved subject to agreement from the Department for Transport, and that the scheme be implemented subject to the satisfactory completion of statutory processes.
(ii) The Traffic Regulation Orders required to implement the scheme are secured to include appropriate consultation in accordance with the statutory process; any objections received be reported to a future meeting.
(iii) The commission to WSP UK is extended to include detailed design processes, and monitoring and evaluation for the scheme as required by the Department for Transport. 7. Proposals and Details
Cabinet Member will recall the successful bid made to the Department for Transport (DfT) regarding the proposed improvement to Pool Green Roundabout as noted in the report considered on 29th July 2013. The report noted the significant changes to flows on the highway network around Centenary Way, particularly in the vicinity of Main Street. Traffic surveys were recently undertaken to enable an additional technical assessment to be carried out to ensure the detail of the proposed signalisation of the junction would operate optimally. The traffic surveys revealed a significant increase in flow at the junction since the previous surveys in 2010 which were used to develop the original design for the Pinch Point Scheme. Subsequently, a more complex signalised junction has been developed utilising the most up to date traffic flows. The revised design, which will require the support from the DfT, ensures that traffic growth, and in particular traffic generated from developments such as the Bassingthorpe Farm project, can be accommodated. The most significant changes to the scheme are the widening of the Centenary Way approaches to 3 lanes, and accommodating the right turn movements from Main Street and Centenary Way via signal controlled U-Turn facilities within the wide central reservation on Centenary Way. Pedestrian crossing facilities will be at-grade and signal controlled resulting in the removal of the two Centenary Way subways to the South and North of the current Pool Green Roundabout. The right turn movement from Masbrough Street, which has the highest right turning flow at the junction, is retained and signal controlled. The principles of the scheme concept are illustrated on WSP drawing number SK-005 REV E, attached as an appendix.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.