CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Apr27Monday

Procurement Board

SalfordHeldPapers from sccdemocracy.salford.gov.uk
Monday 27 April 2026, 2.00pmHeld 207 days ago.
Salford SuiteSalford Civic Centre, Chorley Road, Swinton. Open to the public except for exempt items.
16 items, 12 papersAbout 3.2 MB, led by Jewish IAG - Approval to Award (Dave Timperley).
1 item with exempt partsExclusion of the public may be taken in private.
This meeting was held27 April 2026
16items
12papers
6decisions
1exempt
Running order, sized by papersItem 1 to 10
ReportsProcedureExempt parts

AI summaryWhat Procurement Board decided

Checked against 8 papers PDF briefing Pro

Salford Procurement Board approved a £699,083.75 SAP software contract for Liverpool City Council, with costs fully recharged, and about £440,000 of laptops for around 275 staff returning from the Northern Care Alliance. It also approved building maintenance and demolition tenders, a £135,000 Jewish advice service, and a £75,331.49-a-year Innovation Forum contract extension.

6decisions 1agreed5approved 4with money Topicprocurement
5a
Approved
Jewish IAG - Approval to Award (Dave Timperley)Salford Procurement Board approves award of a £135,000 contract to The Jewel Foundation to run a cross-boundary Information, Advice and Guidance service for Jewish residents in Salford, Bury and Manchester from 1 July 2026.
£135,000Total £202,500 with one-year extension option
Read in full
5b
Approved
Going out for Competition – Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)Salford City Council approved open tender competition for two building maintenance frameworks: responsive repairs and minor building works. Current arrangements end in August and November 2026, covering council-owned buildings excluding housing.
–
Read in full
5c
Approved
Approval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)Salford City Mayor approved going out to competition for new Demolition and Associated Works Framework Agreements, replacing the current arrangement which ends 30 August 2026. The open tender will cover three lots including planned demolition and 24 hour emergency security works.
–
Read in full
5d
Approved
SAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)Salford City Council approves a £699,083.75 contract to buy SAP licences for Liverpool City Council, with all costs fully recharged to Liverpool.
£699,083.75Total over 24 months, fully recharged to Liverpool
Read in full
5e
Approved
Approval to go out to competition for Provision of end-user devices (Peter Cowling)Salford City Council's Lead Member for Finance has approved a procurement exercise worth approximately £440,000 for around 275 laptops, using the CCS framework, to support about 510 staff transferring back from the Northern Care Alliance.
£440,000estimated total procurement value
Read in full
6a
Agreed
Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)Salford City Council's Procurement Board approved a twelve month extension of Oxford Innovation's contract to manage Salford Innovation Forum at £75,331.49 a year, to allow time for visioning work and a new provider.
£75,331.49Total including extension: £408,814.12
Read in full
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Jewish IAG - Approval to Award (Dave Timperley) is the main business; one item may be taken in private.

1
Procedure

Apologies for absence

2
Procedure

Declarations of interest

3
Report

To approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026

1 paper, 108 KBSearch inside with Pro
ReportTo approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026108 KBDownload
4
Procedure

Matters arising

5
Procedure

Decision items - Part 1 (open to the public)

5a
ReportMain business

Jewish IAG - Approval to Award (Dave Timperley)

Decision: Salford City Council – Record of Decision I Councillor Youd, Lead Member for Finance and Support Services and Chairman of the Procurement Board, accept the recommendation of the Procurement Board and in exercise of the powers contained within the Council Constitution do hereby approve: the award of a contract for an Information, Advice and Guidance Service to support Jewish residents’ living in Salford, Bury and Manchester, as detailed in the table below: Detail required Answers Title/... Decision page

2 papers, 387 KBSearch inside with Pro
ReportJewish IAG: Approval to Award (Dave Timperley)156 KBDownload
Reporteia-template-march-2025: Jewish IAG Service v1.4231 KBDownload
5b
Report

Going out for Competition – Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)

Decision: Salford City Council – Record of Decision I Councillor Youd, Lead Member for Finance and Support Services and chairman of the Procurement Board, accept the recommendation of the Procurement Board and in exercise of the powers contained within the Council Constitution do hereby approve: going out to competition for the procurement of the Responsive Repairs Contractor and Minor Building Works Framework Agreements. The Reasons are : to source suppliers who are able to undertake response repairs... Decision page

ReportGoing out for Competition: Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)83 KBDownload
5c
Report

Approval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)

Decision: Salford City Council – Record of Decision I Paul Dennett, City Mayor, accept the recommendation of the Procurement Board and in exercise of the powers contained within the Council Constitution do hereby approve: to go out to competition for Demolition and Associated Works Framework Agreements. The Reasons are : to source suppliers who are able to undertake demolition projects and associated works. The current contract terminates in August 2026. Options considered and rejected were : None. All... Decision page

ReportApproval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)57 KBDownload
5d
Report

SAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)

Decision: Salford City Council – Record of Decision I Councillor Youd, Lead Member for Finance and Support Services and chairman of the Procurement Board, accept the recommendation of the Procurement Board and in exercise of the powers contained within the Council Constitution do hereby approve: to Award the Contract for SAP and related infrastructure for Liverpool Collaboration , as detailed in the table below: Detail required Answers Title/ Description of Contracted Service/Supply/Project SAP and... Decision page

1 paper, 175 KBSearch inside with Pro
ReportSAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)175 KBDownload
5e
Report

Approval to go out to competition for Provision of end-user devices (Peter Cowling)

Decision: Salford City Council – Record of Decision I Councillor Youd, Lead Member for Finance and Support Services and chairman of the Procurement Board accept the recommendation of the Procurement Board and in exercise of the powers contained within the Council Constitution do hereby approve: to go out to competition for Provision of end-user devices. The Reasons are: The Digital Data and Technology ( DDaT ) team is seeking Procurement Board approval to commence a competitive tender for the supply of... Decision page

ReportApproval to go out to competition for Provision of end-user devices (Peter Cowling)61 KBDownload
6
Procedure

Items of Urgent Business - Part 1 (Open to the Public)

There is one (1) Item of Urgent Business – Part 1 (Open to the Public), this being seeking Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF). This item was added following original publication of the agenda and is subject to the Chair being of the opinion that it should be considered at this meeting as a matter of urgency.

6a
Report

Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)

Decision: Urgent Decision – Request to waive call-in Request to a Scrutiny Chair that an urgent decision be exempt from Call-In for Scrutiny. About the decision Responses Decision maker Procurement Board Nature of the decision Extension to the existing Management Agreement at Salford Innovation Forum Is this a key decision? NO If yes, please provide date added to the Forward Plan Date added: N/A Will 5 working days’ notice of the decision be provided? NO Non-confidential report Can be made available to... Decision page

2 papers, 218 KBSearch inside with Pro
ReportApproval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)97 KBDownload
ReportProcurement Board Extension of Management Agreement Oxford Innovation Report April 2026 FINAL (002)121 KBDownload
7
Exempt parts

Exclusion of the public

The officers consider that the following items contain exempt information as provided for in the Local Government Access to Information Act and that the public interest in maintaining the exemption outweighs the public interest in disclosing the information. Members are recommended to agree the necessary resolutions excluding the public from the meeting during consideration of this item. At the time this agenda is...

8
Procedure

Decision items - Part 2 (closed to the public)

None.

9
Procedure

Items of Urgent Business - Part 2 (Closed to the Public)

None.

10
Procedure

Date and time of next meeting

Monday 11 May 2026 at 2pm in Committee Room 1, Salford Civic Centre, Chorley Road, Swinton, M27 5DA.

Read inside all 12 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

4 contracts

The main business: Jewish IAG - Approval to Award (Dave Timperley)

Item 5a is where most of this meeting's papers sit: 2 papers, about 387 KB.

Item 5a

Jewish IAG - Approval to Award (Dave Timperley)

What is in the pack2 papers, about 387 KB
Report
Jewish IAG: Approval to Award (Dave Timperley)The report to the committee
156 KB
Report
eia-template-march-2025: Jewish IAG Service v1.4The report to the committee
231 KB
Read and search every page of this itemPro opens all 2 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

23 March 2026Approval to Award the Contract for the Salford Healthy Child Programme, 0-19 Service (Gillian McLauchlan)
13 April 2026ADDENDUM REPORT - Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung)This addendum provides updated cost information for the contract value in relation to Approval to Award the Contract for Monton Canal Bridge VRS...
13 April 2026Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung)
27 April 2026Jewish IAG - Approval to Award (Dave Timperley)This meeting.

Every paper for this meeting

All 12 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
101 KB
Kept 30 Sep
Agenda reports packItem
1.7 MB
Kept 30 Sep
Printed decisionsItem
234 KB
Kept 30 Sep
To approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026Item 3, To approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026
108 KB
Kept 30 Sep
Jewish IAG: Approval to Award (Dave Timperley)Item 5a, Jewish IAG - Approval to Award (Dave Timperley)
156 KB
Kept 30 Sep
eia-template-march-2025: Jewish IAG Service v1.4Item 5a, Jewish IAG - Approval to Award (Dave Timperley)
231 KB
Kept 30 Sep
Going out for Competition: Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)Item 5b, Going out for Competition – Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)
83 KB
Kept 30 Sep
Approval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)Item 5c, Approval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)
57 KB
Kept 30 Sep
SAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)Item 5d, SAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)
175 KB
Kept 30 Sep
Approval to go out to competition for Provision of end-user devices (Peter Cowling)Item 5e, Approval to go out to competition for Provision of end-user devices (Peter Cowling)
61 KB
Kept 30 Sep
Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)Item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
97 KB
Kept 30 Sep
Procurement Board Extension of Management Agreement Oxford Innovation Report April 2026 FINAL (002)Item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
121 KB
Kept 30 Sep

Last time, and what carried over

The committee last met on 13 April 2026. 6 of its items lead into this meeting; 4 items are new. Point at any item to follow a thread. Procedural items are left out.

Apr13
13 April 202616 items, 10 papers
Held
carried over
Apr27
27 April 202616 items, 12 papers
Held
3
To approve, as a correct record, the minutes of the meeting held on Monday 23 March 2026
5a
BBR Site Investigation (Matthew Mollart)
5b
Request approval to extend the contract for Community Protection/ Refuse Collection software (Place) from 01/04/2026 to 31/03/2028 (Matt Wylie)
5c
ADDENDUM REPORT - Request approval to extend the contract for Community Protection/ Refuse Collection software (Place) from 01/04/2026 to 31/03/2028 (Matt Wylie)This addendum provides updated social value information for the...
5d
Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung)
5e
ADDENDUM REPORT - Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung)This addendum provides updated cost information for the contract...
7
Exclusion of the publicThe officers consider that the following items contain exempt...
8a
BBR Site Investigation (Matthew Mollart)
3
To approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026
5a
Jewish IAG - Approval to Award (Dave Timperley)
5b
Going out for Competition – Responsive Repairs Contractor and Minor Building Works Framework (Tracy Squirrell)New this time
5c
Approval to go out to competition for Demolition and Associated Works Framework Agreements (Tracy Squirrell/ Jonathan Phillips)New this time
5d
SAP and related infrastructure for Liverpool Collaboration (Andrea Beaven)New this time
5e
Approval to go out to competition for Provision of end-user devices (Peter Cowling)New this time
6a
Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
7
Exclusion of the publicThe officers consider that the following items contain exempt...

The threads

  • To approve, as a correct record, the minutes of the meeting held on Monday 23 March 2026 leads to item 3, To approve, as a correct record, the minutes of the meeting held on Monday 13 April 2026
  • Request approval to extend the contract for Community Protection/ Refuse Collection software (Place) from 01/04/2026 to 31/03/2028 (Matt Wylie) leads to item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
  • ADDENDUM REPORT - Request approval to extend the contract for Community Protection/ Refuse Collection software (Place) from 01/04/2026 to 31/03/2028 (Matt Wylie) leads to item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
  • Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung) leads to item 5a, Jewish IAG - Approval to Award (Dave Timperley)
  • Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung) leads to item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
  • ADDENDUM REPORT - Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung) leads to item 5a, Jewish IAG - Approval to Award (Dave Timperley)
  • ADDENDUM REPORT - Approval to Award the Contract for Monton Canal Bridge VRS Protection Scheme (Jack McClung) leads to item 6a, Approval for an Extension of Contract for the Management Agreement at Salford Innovation Forum (SIF) (Jo Ivison)
  • Exclusion of the public leads to item 7, Exclusion of the public

Not carried over

BBR Site Investigation (Matthew Mollart), BBR Site Investigation (Matthew Mollart) do not return this time.

See the 13 April meeting

This committee over time

Every Procurement Board meeting we have read, the dates it has set for the future, and each time those dates have changed.

180 meetings, 2014 to 2027Dot size shows the number of papers
2014201620182020202220242026
HeldThis meeting
MeetingItemsPapers
18 Jan 2027Monday
0items
0papers
UpcomingOpen
21 Dec 2026Monday
0items
0papers
UpcomingOpen
14 Dec 2026Monday
0items
0papers
UpcomingOpen
23 Nov 2026Monday
0items
0papers
UpcomingOpen
9 Nov 2026Monday
0items
0papers
HeldOpen
26 Oct 2026Monday
0items
0papers
HeldOpen
12 Oct 2026Monday
0items
0papers
HeldOpen
21 Sep 2026Monday
16items
12papers
HeldOpen
14 Sep 2026Monday
13items
7papers
HeldOpen
24 Aug 2026Monday
14items
8papers
HeldOpen
10 Aug 2026Monday
12items
6papers
HeldOpen
27 Jul 2026Monday
18items
12papers
HeldOpen
13 Jul 2026Monday
14items
7papers
HeldOpen
22 Jun 2026Monday
16items
14papers
HeldOpen
8 Jun 2026Monday
18items
12papers
HeldOpen
18 May 2026Monday
0items
0papers
HeldOpen
11 May 2026Monday
11items
6papers
HeldOpen
27 Apr 2026Monday, this meeting
16items
12papers
13 Apr 2026Monday
16items
10papers
HeldOpen
23 Mar 2026Monday
25items
23papers
HeldOpen
9 Mar 2026Monday
12items
7papers
HeldOpen
23 Feb 2026Monday
19items
13papers
HeldOpen
9 Feb 2026Monday
12items
6papers
HeldOpen
26 Jan 2026Monday
14items
8papers
HeldOpen
12 Jan 2026Monday
19items
13papers
HeldOpen
9 Jun 2025Monday
13items
7papers
HeldOpen
19 May 2025Monday
16items
11papers
HeldOpen
12 May 2025Monday
0items
0papers
HeldOpen
28 Apr 2025Monday
14items
9papers
HeldOpen
14 Apr 2025Monday
11items
7papers
HeldOpen
24 Mar 2025Monday
14items
10papers
HeldOpen
10 Mar 2025Monday
16items
10papers
HeldOpen
24 Feb 2025Monday
11items
5papers
HeldOpen
10 Feb 2025Monday
16items
13papers
HeldOpen
27 Jan 2025Monday
11items
6papers
HeldOpen
13 Jan 2025Monday
12items
7papers
HeldOpen
12 Jun 2024Wednesday
17items
15papers
HeldOpen
22 May 2024Wednesday
15items
12papers
HeldOpen
8 May 2024Wednesday
15items
10papers
HeldOpen
24 Apr 2024Wednesday
0items
0papers
HeldOpen
10 Apr 2024Wednesday
10items
9papers
HeldOpen
27 Mar 2024Wednesday
16items
11papers
HeldOpen
18 Mar 2024Monday
12items
7papers
HeldOpen
28 Feb 2024Wednesday
12items
8papers
HeldOpen
14 Feb 2024Wednesday
15items
10papers
HeldOpen
24 Jan 2024Wednesday
10items
7papers
HeldOpen
10 Jan 2024Wednesday
18items
13papers
HeldOpen
22 Nov 2023Wednesday
14items
9papers
HeldOpen
27 Sep 2023Wednesday
14items
10papers
HeldOpen
13 Sep 2023Wednesday
15items
10papers
HeldOpen
24 May 2023Wednesday
12items
7papers
HeldOpen
10 May 2023Wednesday
12items
8papers
HeldOpen
26 Apr 2023Wednesday
14items
10papers
HeldOpen
12 Apr 2023Wednesday
0items
0papers
HeldOpen
22 Mar 2023Wednesday
17items
13papers
HeldOpen
15 Mar 2023Wednesday
17items
12papers
HeldOpen
8 Mar 2023Wednesday
0items
0papers
HeldOpen
15 Feb 2023Wednesday
12items
7papers
HeldOpen
8 Feb 2023Wednesday
12items
6papers
HeldOpen
31 Jan 2023Tuesday
16items
10papers
HeldOpen
11 Jan 2023Wednesday
20items
16papers
HeldOpen
14 Dec 2022Wednesday
0items
0papers
HeldOpen
7 Dec 2022Wednesday
0items
0papers
HeldOpen
23 Nov 2022Wednesday
14items
9papers
HeldOpen
9 Nov 2022Wednesday
12items
7papers
HeldOpen
26 Oct 2022Wednesday
13items
8papers
HeldOpen
12 Oct 2022Wednesday
13items
8papers
HeldOpen
29 Sep 2022Thursday
0items
0papers
HeldOpen
14 Sep 2022Wednesday
12items
9papers
HeldOpen
24 Aug 2022Wednesday
12items
7papers
HeldOpen
10 Aug 2022Wednesday
12items
7papers
HeldOpen
22 Jun 2022Wednesday
0items
0papers
HeldOpen
8 Jun 2022Wednesday
16items
11papers
HeldOpen
25 May 2022Wednesday
14items
9papers
HeldOpen
11 May 2022Wednesday
17items
12papers
HeldOpen
20 Apr 2022Wednesday
12items
8papers
HeldOpen
13 Apr 2022Wednesday
14items
9papers
HeldOpen
30 Mar 2022Wednesday
0items
0papers
HeldOpen
23 Mar 2022Wednesday
13items
8papers
HeldOpen
2 Mar 2022Wednesday
11items
9papers
HeldOpen
16 Feb 2022Wednesday
10items
7papers
HeldOpen
2 Feb 2022Wednesday
0items
0papers
HeldOpen
26 Jan 2022Wednesday
11items
7papers
HeldOpen
12 Jan 2022Wednesday
16items
21papers
HeldOpen
14 Dec 2021Tuesday
12items
9papers
HeldOpen
8 Dec 2021Wednesday
14items
10papers
HeldOpen
24 Nov 2021Wednesday
17items
13papers
HeldOpen
10 Nov 2021Wednesday
9items
6papers
HeldOpen
27 Oct 2021Wednesday
0items
0papers
HeldOpen
13 Oct 2021Wednesday
9items
7papers
HeldOpen
29 Sep 2021Wednesday
13items
7papers
HeldOpen
22 Sep 2021Wednesday
12items
11papers
HeldOpen
1 Sep 2021Wednesday
9items
5papers
HeldOpen
28 Jul 2021Wednesday
12items
10papers
HeldOpen
26 May 2021Wednesday
13items
10papers
HeldOpen
12 May 2021Wednesday
8items
5papers
HeldOpen
21 Apr 2021Wednesday
16items
10papers
HeldOpen
7 Apr 2021Wednesday
8items
5papers
HeldOpen
24 Mar 2021Wednesday
0items
0papers
HeldOpen
11 Mar 2021Thursday
11items
10papers
HeldOpen
3 Mar 2021Wednesday
12items
9papers
HeldOpen
17 Feb 2021Wednesday
16items
20papers
HeldOpen
3 Feb 2021Wednesday
0items
0papers
HeldOpen
22 Jan 2021Friday
9items
7papers
HeldOpen
6 Jan 2021Wednesday
12items
9papers
HeldOpen
17 Jun 2020Wednesday
0items
0papers
HeldOpen
10 Jun 2020Wednesday
10items
5papers
HeldOpen
3 Jun 2020Wednesday
13items
12papers
HeldOpen
13 May 2020Wednesday
12items
9papers
HeldOpen
22 Apr 2020Wednesday
10items
5papers
HeldOpen
8 Apr 2020Wednesday
10items
4papers
HeldOpen
25 Mar 2020Wednesday
15items
13papers
HeldOpen
11 Mar 2020Wednesday
18items
17papers
HeldOpen
19 Feb 2020Wednesday
17items
18papers
HeldOpen
5 Feb 2020Wednesday
12items
7papers
HeldOpen
22 Jan 2020Wednesday
13items
11papers
HeldOpen
9 Jan 2020Thursday
14items
8papers
HeldOpen
29 May 2019Wednesday
15items
14papers
HeldOpen
1 May 2019Wednesday
11items
4papers
HeldOpen
17 Apr 2019Wednesday
11items
6papers
HeldOpen
3 Apr 2019Wednesday
14items
10papers
HeldOpen
13 Mar 2019Wednesday
12items
7papers
HeldOpen
6 Mar 2019Wednesday
12items
8papers
HeldOpen
20 Feb 2019Wednesday
11items
6papers
HeldOpen
6 Feb 2019Wednesday
13items
8papers
HeldOpen
23 Jan 2019Wednesday
16items
13papers
HeldOpen
16 Jan 2019Wednesday
11items
6papers
HeldOpen
9 Jan 2019Wednesday
14items
12papers
HeldOpen
27 Jun 2018Wednesday
13items
9papers
HeldOpen
13 Jun 2018Wednesday
14items
13papers
HeldOpen
30 May 2018Wednesday
12items
7papers
HeldOpen
9 May 2018Wednesday
12items
7papers
HeldOpen
2 May 2018Wednesday
0items
0papers
HeldOpen
18 Apr 2018Wednesday
13items
8papers
HeldOpen
4 Apr 2018Wednesday
0items
0papers
HeldOpen
28 Mar 2018Wednesday
15items
14papers
HeldOpen
7 Mar 2018Wednesday
13items
7papers
HeldOpen
28 Feb 2018Wednesday
11items
7papers
HeldOpen
7 Feb 2018Wednesday
12items
6papers
HeldOpen
24 Jan 2018Wednesday
12items
7papers
HeldOpen
10 Jan 2018Wednesday
12items
7papers
HeldOpen
10 May 2017Wednesday
11items
6papers
HeldOpen
3 May 2017Wednesday
11items
11papers
HeldOpen
19 Apr 2017Wednesday
15items
11papers
HeldOpen
6 Apr 2017Thursday
15items
9papers
HeldOpen
22 Mar 2017Wednesday
15items
9papers
HeldOpen
8 Mar 2017Wednesday
16items
10papers
HeldOpen
22 Feb 2017Wednesday
0items
0papers
HeldOpen
8 Feb 2017Wednesday
14items
9papers
HeldOpen
25 Jan 2017Wednesday
11items
5papers
HeldOpen
11 Jan 2017Wednesday
8items
9papers
HeldOpen
1 Jun 2016Wednesday
0items
0papers
HeldOpen
25 May 2016Wednesday
0items
0papers
HeldOpen
20 Apr 2016Wednesday
0items
0papers
HeldOpen
6 Apr 2016Wednesday
0items
0papers
HeldOpen
23 Mar 2016Wednesday
0items
0papers
HeldOpen
9 Mar 2016Wednesday
0items
0papers
HeldOpen
17 Feb 2016Wednesday
0items
0papers
HeldOpen
9 Feb 2016Tuesday
0items
0papers
HeldOpen
27 Jan 2016Wednesday
0items
0papers
HeldOpen
13 Jan 2016Wednesday
0items
0papers
HeldOpen
27 May 2015Wednesday
0items
0papers
HeldOpen
13 May 2015Wednesday
0items
0papers
HeldOpen
29 Apr 2015Wednesday
0items
0papers
HeldOpen
15 Apr 2015Wednesday
0items
0papers
HeldOpen
1 Apr 2015Wednesday
0items
0papers
HeldOpen
17 Mar 2015Tuesday
0items
0papers
HeldOpen
4 Mar 2015Wednesday
0items
0papers
HeldOpen
17 Feb 2015Tuesday
0items
0papers
HeldOpen
4 Feb 2015Wednesday
0items
0papers
HeldOpen
20 Jan 2015Tuesday
0items
0papers
HeldOpen
30 Jul 2014Wednesday
0items
0papers
HeldOpen
16 Jul 2014Wednesday
0items
0papers
HeldOpen
18 Jun 2014Wednesday
0items
0papers
HeldOpen
28 May 2014Wednesday
0items
0papers
HeldOpen
14 May 2014Wednesday
0items
0papers
HeldOpen
30 Apr 2014Wednesday
0items
0papers
HeldOpen
16 Apr 2014Wednesday
0items
0papers
HeldOpen
2 Apr 2014Wednesday
0items
0papers
HeldOpen
19 Mar 2014Wednesday
0items
0papers
HeldOpen

Follow the Procurement Board

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Salford, Procurement Board

Procurement Board: 3 kinds of updateSalford, sent the same day
PDF
12 papers published for 27 AprilJewish IAG - Approval to Award (Dave Timperley) and 11 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 27 AprilThe committee's resolutions, the day they are recorded
ABC
"jewish" found in 2 papersJewish IAG: Approval to Award (Dave Timperley) and eia-template-march-2025: Jewish IAG Service v1.4
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Procurement Board, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies