Item22
Resolved
That the Assistant Director of Place (Highways and Public Protection) be authorised to implement the following modifications to the Highway: (1) introduction of a cycle route adjacent to both carriageways linking Dodds Lane to Robbins Island; (2) modification of the junction of A59, Northway with Kenyon’s Lane to include crossing facilities on all legs for both pedestrians and cyclists; and (3) introduction of the signal-controlled crossing over the A59, Northway at the junction with Robbins Island together with the continuation of the cycleway around the roundabout to link with existing facilities at the borough boundary.
Word for word from the decision Sefton published for this meeting.
Source: modgov.sefton.gov.uk