Item62
Resolved
That planning permission be granted subject to conditions 1) The development hereby permitted shall be begun before the expiration of three years from the date of this permission. In pursuance of section 91 of the Town and Country Planning Act 1990. 2) The development shall be carried out in accordance with approved drawings and details: Site location plan to the scale of 1:2500 (drawing no. 4906-PD2-01); Existing plans, elevations and section of Building 1 (drawing no. 4906-PD2-03); Existing plans, elevations and section of Building 2 (drawing no. 4906-PD2- 04); Existing site plan with approved scheme (drawing no. EX01 Rev A); Proposed site plan (drawing no. SP01 Rev D); Proposed ground floor and lower ground floor plan- Building 1 (drawing no. 02 B1 rev B); Proposed ground floor plan- Building 2 (drawing no. 02 B2 Rev D); Coloured elevation - Building 1 (drawing no. 04a B1); Coloured elevation - Building 2 (drawing no. 04a B2); Proposed elevations - Building 1 (drawing no. 04 B1 Rev D); Proposed elevations - Building 2 (drawing no. 04 B2 Rev F); Proposed outline sections - Building 1 (drawing no. 05 B1 Rev C); Proposed outline sections - Building 2 (drawing no. 05 B2 Rev B); Layout and elevations - Atcost building (drawing no. EX02); Proposed car port floor plans and elevations (drawing no. G01); Proposed floor plans and elevations - Building 1 (drawing no. X01 B1 Rev D); Proposed floor plans and elevations- Building 2 (drawing no. X02 B2 Rev G); Proposed elevations comparison - Building 1 (drawing no. X03 B1 Rev C); Proposed elevations comparison - Building 2 (drawing no. X04 B2 Rev C); Howard Sharp & Partners - Planning, Design and Access Statement. TSC Designs Ltd dated August 2019, an addendum report from TSC Designs Ltd dated April 2020. Supplemental structural engineers report from Structural Solutions Management Ltd dated 8th July 2021. Traffic Impact Statement Preliminary ecology assessment and bat survey from KB Ecology. Phase 1 Contaminated Land Assessment from Lustre Consulting. Photographs of the Atcost building. For the avoidance of doubt and in the interests of proper planning. 3) Before the commencement of the development hereby approved (including demolition), a Phase 2 contaminated land investigation, including a remediation methodology ... view the full minutes text for item 62.
Word for word from the decision Sevenoaks published for this meeting.
Source: cds.sevenoaks.gov.uk