CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Shropshire Council
Planning, Housing and Commissioning (Central), Monday 20 October 2014 at 10.00am

Shropshire Council Draft Local Development Scheme 2015 to 2018

Approved Planning 1 paper

Planning, Housing and Commissioning (Central) approved this item on Monday 20 October 2014. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

That the draft Local Development Scheme as set out in Appendix A to the report be approved for publication.
Word for word from the decision Shropshire published for this meeting. Source: www.shropshire.gov.uk

Follow this further

Built from Shropshire's papers

What the report saysPro

Report to Planning, Housing and Commissioning (Central)

Portfolio Holder Decision Item Making Session and date/time

Portfolio Holder Decision Making Session 10am 20th 3 October 2014 Public

Shropshire Council Draft Local Development Scheme (LDS) 2015- 2018

Responsible Officer Andrew Evans, Head of Economic Growth and Prosperity Email: [email protected] Tel: 01743 252003 Fax:

1. Summary 1.1 The Local Development Scheme is the formal programme of the development plan and supporting documents to be prepared which will comprise the Shropshire Council Local Plan. The purpose of this report is to seek approval for a draft version (attached as Appendix A) of the Local Development Scheme (LDS) to be published and referred to if required in the forthcoming SAMDev examination.

2. Recommendations 2.1 To approve the draft Local Development Scheme (LDS) for publication.

Reasons for decision: To consider the timescales for producing statutory Local Plan documents and to publish the draft LDS at an appropriate time before the commencement of the hearing part of the SAMDev examination.

REPORT

3. Risk Assessment and Opportunities Appraisal 3.1 The Risk Management Log of the LDS contains analysis of the areas of uncertainty and risk facing production of the Local Plan, with risks of a critical or significant potential impact and of a very high or high likelihood including for example: staff turnover and recruitment difficulties or receipt of large numbers of objections.

3.2There are significant risks that could impact upon delivery of the Local Plan to the schedules set out within this Local Development Scheme. In order to minimise possible impacts, risk management has been embedded in the Local Plan production processes in order that risk can be evaluated and where possible eliminated. Whilst proposed

1 responses or mitigation measures have been set out, seeking where possible, to manage these risks, some areas of risk are outside the Council’s control. In addition, financial pressures could curtail many of the proposed mitigation measures.

3.3The risk assessment would suggest that the Local Plan programme remains extremely challenging. For example, where individual project production milestones are missed it could be difficult to get “back on track” without impacts on other elements of the overall programme. Given however, that the production of a Local Plan is a statutory requirement in order to provide local planning policy coverage and deliver housing land, these risks must be accepted by the Council. The most fundamental overall mitigation measure that can be made is to build-in realistic document production timescales into this LDS at the outset and ensure sufficient resources are available throughout the timescale of the LDS.

4. Financial Implications 4.1 There are no financial implications arising from the LDS itself, it is a requirement that Councils publish one setting out their plan production schedule. Any financial implications arise potentially from slippage in the timetable leading to delays in Local Plan production with subsequent impacts on development management decision making, housing land supply and infrastructure funding.

5. Background 5.1 The spatial planning system is based on a portfolio of Local Plan documents and other components. Some are mandatory, whilst local authorities have a certain amount of discretion over whether others are needed. The programme of policy work must be set out in a project timetable or Local Development Scheme (LDS), which must be published, and then monitored and reviewed if required on an annual basis.

5.2The LDS sets out the programme or timetable for the various stages in the production of new Planning documents, principally the Core Strategy and Site Allocation documents, highlighting important milestones such as public consultation stages, examination and adoption. It also shows how other important work areas such as neighbourhood planning, monitoring and evidence base work interact with or impact upon the production of new Planning documents.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Shropshire Council Draft Local Development Scheme 2015 to 2018Report 171 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

1 of 1 attended
MP
Malcolm PriceCommittee Member, present

On this subject at Shropshire

Search all
  1. Shropshire Council Draft Local Development Scheme 2015 to 2018This decision
  2. Proposed Local Needs Dwelling to the South Of Pulverbatch Shrewsbury Shropshire (24/04212/FUL)Agreed
  3. Shropshire Local Plan and NPPF Position StatementNoted
  4. Shropshire Local Cycling & Walking Infrastructure PlanApproved
  5. Shropshire Integrated Place Partnership Strategic Plan & Local Care Neighbourhood Working UpdateNoted
  6. Shropshire Local Cycling & Walking Infrastructure Plan – Final DraftNoted

More from Shropshire Planning, Housing and Commissioning (Central)

All decisions
MeetingDecisionOutcome
24 Apr 2015 Community Infrastructure Levy (CIL): Exceptional Circumstances ReliefThat Shropshire Council withdraws Exceptional Circumstances Relief in Shropshire for the following reasons: (a) The l... Decided Open
7 Apr 2015 Tenancy Policy Relating To Properties Managed by Shropshire Towns and Rural HousingThat the Tenancy Policy relating to properties managed by Shropshire Towns and Rural Housing be approved. Approved Open
25 Feb 2015 Proposal for Community Flood Resilience ProjectThat approval be given to the procurement of the National Flood Forum, subject to the appropriate procurement exempti... Approved Open
28 Jan 2015 Management Fee Increase - Section 106 Contributions(a) That approval be given to an increase from 2% to 5% on all relevant S106 agreements that provided a cash sum. (b)... Approved Open
8 Jan 2015 Collaborative Working Proposal for the Management of Local Flood Risk, including the Local Flood Risk Management Strategy, between Shropshire Council and Staffordshire County CouncilThe Portfolio Holder for Planning, Housing and Commissioning (Central) approved as follows: A. The Local Flood Risk M... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies