Meadowland, Sleap, Harmer Hill, Shrewsbury, - 15/01937/EIA

Agreed Planning 1 paper

Northern Planning Committee agreed this item on Tuesday 4 August 2015. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

That planning permission be granted in accordance with the Officer’s recommendation, subject to the applicants entering into a S106 agreement to secure a financial contribution for road improvement works and the conditions set out in Appendix 1.
Word for word from the decision Shropshire published for this meeting. Source: www.shropshire.gov.uk

Follow this further

Built from Shropshire's papers

What the report saysPro

Report to Northern Planning Committee

Committee and Date Item

North Planning Committee 11 4th August 2015 Public

Development Management Report

Responsible Officer: Tim Rogers Email: [email protected] Tel: 01743 258773 Fax: 01743 252619

Summary of Application

Application Number: 15/01937/EIA Parish: Myddle And Broughton

Proposal: Erection of a poultry building, an expansion of the existing poultry business on site.

Site Address: Meadowland Sleap Harmer Hill Shrewsbury Shropshire

Applicant: [name removed]: Karen Townend email: [email protected]

Grid Ref: 349125 - 326124

© Crown Copyright. All rights reserved. Shropshire Council 100049049. 2011 For reference purposes only. No further copies may be made.

Recommendation:- Grant Permission subject to the conditions set out in Appendix 1.

REPORT North Planning Committee – 4 August 2015 Agenda Item 11 – Meadowland, Sleap

1.0THE PROPOSAL 1.1 This application is one of three applications for new poultry sheds at Meadowlands, Sleap, as an extension to the three previously approved poultry sheds adjacent to the application site. Each of the three poultry sheds now proposed will be the same as the approved buildings, and will measure 108m x 24.7m. Eaves heights are 2.76m and with a low pitched roof the ridge height is 4.9m. The design and access statement submitted with the application advises that the buildings will be constructed of a steel frame, the roofs and side walls will be clad with box profile polyester coated steel sheet with high level double glazed windows to provide natural light to match the existing buildings. The three sheds are intended for a maximum of 150,000 broiler chickens at any one time, which would increase the capacity at the site as a whole to 300,000.

1.2In addition the scheme proposes the erection of six feed bins which are proposed to be 7.5m high with a diameter of 2.8m and 30 tonne capacity. The previous applications on the site also included the erection of a control room, biomass boiler building and agricultural workers dwelling. However, the boiler building has not been erected and instead each poultry shed has a small boiler and wood chip store room at the end, off the hard surfaced access road. The new buildings will also connect to the existing services and facilities including the drainage system.

1.3The scheme has been submitted in three separate applications by the agent and on this occasion this method of applying for permission appear to be acceptable. However, to ensure that the development is considered as a whole all three applications need to be considered alongside each other. The separating of the composite parts can allow the authority to grant parts and refuse parts if not all of the overall scheme is acceptable and as such each application will also need to be considered on its own merits.

1.4EIA requirements The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 requires that for certain types of development an EIA must be undertaken. The proposed poultry development as a whole falls within the criteria in Schedule 1 of the Regulations (as it will accommodate in excess of 85,000 broiler chickens) and an EIA was therefore a mandatory requirement of the application submission.

1.5The EIA procedure is a means of drawing together, in a systematic way, an assessment of a project’s likely significant effects on the environment. The Regulations at Schedule 4, Parts 1 and 2, stipulate the information to be included in an Environmental Statement (ES). An ES should identify, describe and assess the likely significant impacts of the development on the environment.

1.6The application has been submitted with an ES non-technical summary as required by the regulations and the contents of this document will be considered in the relevant sections of the report below.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Meadowland, Sleap, Harmer Hill, Shrewsbury,: 15/01937/EIAReport 383 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 11 attended
AW
Arthur WalpoleChairman, present
PW
Paul WynnVice Chairman, apologies
JB
Joyce BarrowCommittee Member, present
JC
John CadwalladerCommittee Member, present
GD
Gerald DakinCommittee Member, apologies
SD
Steve DavenportCommittee Member, present
PD
Pauline DeeCommittee Member, present
VH
Vince HuntCommittee Member, apologies
DL
David LloydCommittee Member, present
DM
David MinneryCommittee Member, apologies
PM
Peggy MullockCommittee Member, present

On this subject at Shropshire

Search all
  1. Meadowland, Sleap, Harmer Hill, Shrewsbury, - 15/01937/EIAThis decision
  2. Meadowland, Sleap, Harmer Hill, Shrewsbury, Shropshire, SY4 3HE (24/02735/EIA)Agreed
  3. Meadowland, Sleap, Harmer Hill, Shrewsbury, Shropshire, SY4 3HE (24/02735/EIA)Deferred
  4. Meadowland, Sleap, Harmer Hill, Shrewsbury, Shropshire, SY4 3HE (22/02001/EIA)Decided
  5. Meadowland, Sleap, Harmer Hill, Shrewsbury - 15/01921/EIAAgreed
  6. Meadowland, Sleap, Harmer Hill, Shrewsbury - 15/01938/EIAAgreed

More from Shropshire Northern Planning Committee

All decisions
MeetingDecisionOutcome
21 Jul 2026 MinutesThat the of the meeting of the North Planning Committee held on 21 st April and 14 th May 2026 be approved as a corre... Approved Open
21 Jul 2026 Proposed Residential Development Land Between Aston Road and Church Lane, Wem, Shropshire. (25/02775/OUT)Deferred by the Development Manager, in consultation with Legal, under 17.4 of the Local Protocol for Councillors and... Deferred Open
21 Jul 2026 Proposed Residential Development Land To The West Of Crosemere Crescent Cockshutt Shropshire (25/04083/FUL)To delegate authority to officers to grant planning permission, subject to further investigation for options to impro... Decided Open
21 Jul 2026 Proposed Residential Development NW Of Kingfisher Way Morda Shropshire (26/00772/FUL)That Planning Permission be granted subject to the conditions set out in Appendix 1 of the report Decided Open
21 Jul 2026 Application to Register The Glebelands, Bayston Hill as a Village GreenThat an independent barrister be appointed to act as an Inspector to undertake, if necessary, a non-statutory public ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies