Resolved
That it be noted that the next meeting of the Central Planning Committee be held at 2.00 p.m. on Thursday, 5 November 2015 in the Shrewsbury Room, Shirehall, Shrewsbury, SY2 6ND.
Central Planning Committee noted this item on Thursday 8 October 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
That it be noted that the next meeting of the Central Planning Committee be held at 2.00 p.m. on Thursday, 5 November 2015 in the Shrewsbury Room, Shirehall, Shrewsbury, SY2 6ND.
CENTRAL PLANNING COMMITTEE SCHEDULE OF ADDITIONAL LETTERS Date: 08 Oct 2015 NOTE: This schedule reports only additional letters received before 5pm on the day before committee. Any items received on the day of Committee will be reported verbally to the meeting
Item No. Application No. Originator:
6 15/03580/FUL AGENT
During the design period numerous consultations between Shrewsbury Planning Department, the Conservation Officer and Historic England have taken place to develop the design of the project. The discussions were rigorous, and the design was developed to take into account the various concerns and suggestions that these official consultees had requested. In addition to this we have taken account of comments from the Civic Society and members of the public and with that revised the design of the original planning submission. We understand that there are a few design issues which need to be resolved and believe the implementation of the suggested planning conditions will adequately cater for their conclusion.
This report contains additional responses from POD Architects to the design and appearance objections highlighted within section 4.21 of the Development Management Report.
1.0Design and Appearance
1.1The three blocks are one storey too high and will dominate the area. Nearly all residential buildings in the town centre are three storeys high and only a few non- residential buildings are four storeys
Within the Design and Access Statement, Section 3, Context and Urban Analysis p.14-37, a series of research and analysis studies explored the existing urban grain of Shrewsbury. Section 3.3 Surrounding Site Studies (p.20-24) closely analysed surrounding streets, highlighting architectural features, materials, roof types, heights and building uses. This insured that the project was developed in scale to its surrounding context.
1.2The addition of the steel decoration to the sides of the blocks is an unnecessary adjunct and expense.
It is unclear what this objection is highlighting; if it is in regards to the Brise Soleils positioned on both sides of each block, they have been removed within the new set of revised planning drawings submitted 16.09.15.
1.3The construction of three, four storey ‘slabs’ placed formally, end-on to the street bears little or no relation to the existing street scene and this arrangement, if built, will certainly have detrimental repercussions on the surrounding area centred on Rowley’s House.
Throughout the preliminary and development stages of the project, a comprehensive set of studies researched into the site and its surrounding context. The studies were systematically included within the Design and Access Statement (Section 3, p.14-37) to explain the design and thought process to how the proposal was developed. Characteristics and small details from local architecture that were repeatedly noted such as red brick, soldier course brick / stone lintel were later developed into the proposal. This ensured that the new scheme reflected the local urban characteristics of neighbouring architecture.
1.4None of the elevations are an adequate response to the context. The overall scale of the 4 storeys is reasonable for this part of the town but the flat roof dull appearance of the buildings is completely alien in this location.
With regards to the Elevations and Context please refer to comment 1.3.
As highlighted within a set of preliminary studies researched into roof typologies within the local context which highlighted flat roofs (Section 3.4 Roof and Materials Typology Studies; Design and Access Statement, p.25). A series of design development studies for roof variations have been explored (Section 4.4 initial roof studies; Design and Access Statement, p.44-45) and discussed at meetings with both the clients and planning department prior to submission and the flat roof option for all three buildings was the preferred option.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Date of the Next MeetingReport | 83 KB | DownloadRead as text |
Follow Central Planning Committee at Shropshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 Jul 2019 | MinutesThat the of the meeting of the Central Planning Committee held on 6 th June 2019 be approved as a correct record and ... | Approved | Open |
| 4 Jul 2019 | Land North East of Kinton, Shrewsbury - 18/00130/EIAThat consideration of the application be deferred to a future meeting of this Committee at the request of the applicant. | Deferred | Open |
| 4 Jul 2019 | Land Off Manor Lane, Longden, Shrewsbury - 16/02395/FULThat authority be delegated to the Head of Planning Services to refuse planning permission subject to further consult... | Refused | Open |
| 4 Jul 2019 | School House Farm, Sheinton, Shrewsbury - 18/04266/FULThat planning permission be granted as per the Officer’s recommendation subject to the conditions set out in Appendix 2. | Decided | Open |
| 4 Jul 2019 | Maesbrook Nursing Home, Church Road, Shrewsbury - 19/01132/FULThat planning permission be granted as per the Officer’s recommendation subject to the conditions set out in Appendix 1. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.