That planning permission be granted subject to: · The Conditions as set out in Appendix 1; · An amendment to Condition 8 to require no above ground building work to commence until a landscaping scheme has been submitted and approved in consultation with the County Arboriculture Officer, and the approved landscape planting has commenced; and · Subject to the completion of a Section 106 legal agreement to provide for off-site landscaping and long term maintenance.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Recommendation: Grant planning permission subject to conditions as set out in Appendix 1 and subject to the completion of a Section 106 legal agreement to provide for off-site landscaping and long term maintenance.
REPORT
1.0THE PROPOSAL 1.1 The planning application seeks permission for the construction of a solar farm on agricultural land, comprising arrays of solar panels with associated buildings and infrastructure. The proposal would involve the installation of 15,532 solar panels generating approximately 3.75MW of electricity which would be fed into the national grid network.
1.2The panels would be mounted on fixed aluminium frames arranged in west-east orientated rows. These frames would be secured to the ground through metal piles. The panels would face south, angled at approximately 25 degrees to the horizontal, with the highest edge at a height of 2.33 metres and the lowest at 0.8 metre. There would be a separation of 3 to 4 metres between each row.
1.3Buildings and other infrastructure proposed comprises the following: Inverters (4no.): two of these would be positioned at the centre of the site; the other two along the northern boundary; they would measure 9.8 metres x 3 metres x 3.6 metres high; Control building/substation: this would house control panels and the transformer: it would be sited at the north-eastern corner of the site and would be of brick construction with dimensions 3.6 metres x 3.6 metres x 2.4 metres high; DNO substation: this would be accessed by the Distribution Network Operator; it would be sited at the north-eastern corner of the site, of similar construction and dimensions to the control building; Perimeter fencing: wire mesh, 2.4 metres high; 4no. CCTV cameras, installed on 3 metres high wooden poles.
1.4Once the panels have been erected the land is proposed to be grazed by sheep. The application states that the operational life of the panels is 25 years. Existing trees and hedgerows would be retained, and additional landscape planting would be undertaken.
1.5The application is supported by a number of detailed documents, including: Soils and Agricultural Quality report; Assessment of Alternatives report; Archaeology and Cultural Heritage Assessment; Landscape and Visual Impact Assessment; Ecological Appraisal; Flood Risk Assessment; Geophysical Survey Report; Noise Assessment report; Transport Assessment.
2.0SITE LOCATION/DESCRIPTION 2.1 The application site occupies the north-eastern corner of an agricultural field which is located approximately 1.1km to the north-west of Baschurch and 430 metres to the south-east of Stanwardine in the Fields. The site is roughly rectangular in shape and covers an area of approximately 6.1 hectares (300 metres x 200 North Planning Committee – 27 October 2015 Agenda Item 5 – Moor Farm, Baschurch
metres). The site itself is relatively flat, and is bounded to the north and east by a hedgerow. Surrounding land is in agricultural use. A pubic highway runs in a generally north-south direction to the east.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.