That planning permission be granted as per the Officer’s recommendation; subject to: · The Conditions as set out in Appendix 1 to the report, subject to: Condition No. 10 being amended to ensure that external lighting is designed to minimise adverse impact on the surrounding area as well as to minimise disturbance to bats, to reflect the comments made in paragraph 6.4.9 of the report: and the following additional Condition: No development approved by this permission shall commence until details of existing and proposed finished floor levels have been approved in writing by the local planning authority. Reasons: To safeguard the visual amenities of the area.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Application Number: 15/05462/EIA Parish: Great Ness
Proposal: Erection of four poultry rearing buildings, biomass building, ten feed bins and other ancillary buildings, landscaping including ground modelling and tree planting, construction of a surface water attenuation feature and new access
Site Address: Land Adjacent To The A5 Kinton Shrewsbury SY4 1AZ
Applicant: [name removed] Officer: Kelvin Hall email: [email protected]
Contact: Tim Rogers (01743) 258773 Land Adjacent To The A5 Kinton, Central Planning Committee – 28 April 2016 Shrewsbury, SY4 1AZ
Recommendation:- subject to the conditions set out in Appendix 1.
REPORT
1.0THE PROPOSAL 1.1 The planning application seeks permission for the erection of four poultry rearing buildings, biomass building, ten feed bins and other ancillary buildings. Each poultry building would accommodate 50,000 birds, with a combined total of 200,000 bird places. Each shed would measure approximately 109 metres x 27 metres with a height of 2.68 metres to eaves and 4.98 metres to ridge. Each shed would include a fan canopy and baffle area to the rear.
1.2The biomass boiler building would measure 30 metres long x 12 metres wide, and 5.4 metres to eaves and 6.5 metres to ridge. It would be constructed of concrete composite panel walls with box profile metal sheeting above with a profile metal sheet roof.
1.3The feed bins would be of cylindrical design with a conical top and bottom. Their diameter would be 3.35 metres, and height would be 9.22 metres. Other development proposed includes six gas tanks within a safety compound, a water tower 6 metres high and 3 metres diameter, and starter crumb feed bin 7.67 metres high and 2.57 metres wide. A surface water attenuation pond would be provide at the western side of the site.
1.4Proposed landscaping would include tree planting around the perimeter of the site, the formation of a landscaped bund on the western side of the site, and hedgerow planting along the western and southern sides of the site.
1.5Production process: Prior to the crop cycle the sheds would be pre-warmed to 310c in preparation for chick delivery from the hatchery, and bedding litter would be spread on the building floors. Chicks would be ‘thinned’ when they reach around five weeks old. This would involve the catching and transport of a proportion of chicks over a two day period. When the birds are around six weeks old the remainder would be caught and removed from the site. Bird catching and removal would take place during the day time and night time over two days. At the end of the growing period the used litter would be taken away in covered vehicles and stored in fields off-site prior to spreading on agricultural land. Wash down and disinfection would then take place ready for the next crop. The wash water would be collected in underground tanks before being spread to agricultural land. The biomass boiler would provide heat for the poultry sheds, using wood chip/pellets, home grown straw or miscanthus as fuel.
1.6As detailed in section 6.1.1 below, the planning application is accompanied by an Environmental Impact Assessment (EIA), and this includes a detailed set of reports assessing the potential impacts of the development.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.