That, notwithstanding the previous resolution of Members to grant planning permission subject to conditions and a Section 106 legal agreement, planning permission be refused for the following reasons. The proposed change of use of the warehouse to an in-vessel composting demonstration facility for the composting of waste materials has the potential to result in adverse impacts on the local highway network due to the type, number and of vehicles that would be associated with the delivery of waste and the export of composted material. It is considered that, in order to make the development acceptable, the proposed operation should be undertaken in accordance with a traffic routing agreement and a traffic management plan to limit vehicle movements and ensure that only an approved route which includes avoiding the village of Childs Ercall is used. It is further considered that it is appropriate for these to be secured through a Section 106 agreement. The local planning authority has sought to agree an appropriate agreement with the applicant however It has not been possible to complete this within a reasonable period of time . Core Strategy policy CS6 requires that all development is designed to be safe and accessible, and SAMDev Plan policies MD2 and MD8 require that development should only take place where there is sufficient existing infrastructure and capacity. In the absence of a satisfactory routing agreement and traffic management plan it is considered that the proposal would have adverse impacts upon highway safety and is therefore contrary to these Development Plan policies. The benefits of the proposal have been taken into account and it is not considered that these are sufficient to outweigh the harm that would arise due to conflict with these policies. Also owing to the passing of time update reports would be required in order to satisfy both local and national planning policies.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
1.0THE PROPOSAL 1.1 The planning application proposes the adaptation of a former aircraft hangar, weighbridge and office to an In-Vessel composting facility for the composting of waste materials. The primary aim of the proposal is to function as a demonstration facility to showcase the aerobic in-vessel composting technology to the waste industry. Compost would be provided to local farms to add organic matter and nutrients to farmland.
1.2Works to the buildings would include selective cladding and refurbishment. An internal enclosure would be constructed within the hangar, bolted onto the hangar framework. Wastes would be unloaded from vehicles within this enclosure. WC and rest room facilities for employees and visitors would be provided at an adjacent building.
1.3Imported waste materials would be composted in sealed rotating drums within the hangar building. Waste types to be composted would include: green waste and catering waste from municipal collections, food manufacture/preparation catering waste that contain meat or that come from premises handling meat. Other wastes may include sewage cake, effluent treatment sludge cake, paper/cardboard, chipped wood. The facility would compost a maximum of 25,000 tonnes of waste per year.
1.4Proposed process Weighing of wastes would be undertaken at the weighbridge. All other processes would take place within the hangar, and would comprise: • inspection of waste to identify and remove any contaminants
Contact: Stuart Thomas on 01743 252665 th North Planning Committee: 24 May 2011
• shredding and mixing of wastes • loading of wastes into enclosed composting vessels via conveyors • sorting and screening of composted waste using a trommel • formation of composted materials into long piles (windrows) for maturation • relocation of matured compost to loading area in readiness for collection
1.5The enclosed vessels allow for the control of moisture content, temperature and exposure of the material to air. The waste would be composted for between 3 and 6 days, on a continuous basis. The system allows for heat generated as part of the process to be re-used, and for moisture content of wastes to be reduced. In addition foul air from the composting process would be passed through a biofilter to reduce odour.
1.6Access and traffic The primary vehicle access to the hangar would be via an existing access track that is located to the north-east which would be improved through the construction of passing places. The secondary access would be the existing main access into the airfield, to be used by staff cars and a small proportion of tractors delivering compost out to farmland in that direction.
1.7It is estimated that there would be 5.2 heavy vehicles to the site per day (10.4 movements). These vehicles would comprise lorries delivering waste and collecting compost, and tractor/trailers collecting compost. The applicant states that this is a worst case scenario and assumes that separate vehicles would collect compost, whereas in practice the applicant expects that delivery vehicles would leave the site full of compost. Other vehicles would be associated with staff and visitors, comprising approximately 4 vehicles per day.
1.8The proposed development does not fall within the requirements for formal Environmental Impact Assessment, however the application details specific controls that would be imposed on operations to mitigate against land-use impacts.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.