What was decided
Delegated authority given to officers to grant outline planning permission for up to 450 dwellings, subject to completing a Section 106 agreement and the conditions in Appendix 1, with any minor changes to conditions allowed.
The application is in outline with access considered concurrently; layout, scale, appearance and landscaping are reserved for later approval. Report 1.1, P35
Development will be delivered in two phases: Phase 1 of 150 dwellings and Phase 2 of 300 dwellings, both at about 35 dwellings per hectare. Report P36
Why
Officers found the site conflicts with the Development Plan as unallocated countryside beyond Shrewsbury's boundary, but the council cannot demonstrate a five-year housing land supply, triggering the NPPF paragraph 11(d) tilted balance in favour of sustainable development. Report P136, P137, P140, P141, P156, P157
The Local Highway Authority is now satisfied that 450 dwellings can be built and occupied before the North West Relief Road opens without significant transport impact, following hybrid traffic modelling and a further technical note dated 31 March 2026; the development's impact on the Chester Street junction is forecast at 3% in the AM peak and 4% in the PM peak, below the 5% trigger. Report P5, P12, P17, P58, P167
Technical assessments concluded no unacceptable harm to heritage assets, protected species, the Old River Bed SSSI and Local Wildlife Site, or flood risk, and the proposal delivers at least 10% biodiversity net gain with around 8.4 ha (39%) of the site for landscaping, open space and habitat. Report P50, P62, P63, P76, P187, P206, P221
What happens next
Officers will finalise a Section 106 agreement to secure affordable housing, education, healthcare, playing pitches, passenger transport, Travel Plan monitoring, and an active travel contribution of up to £5,000 per dwelling, with any unspent active travel monies returnable after 10 years. Report P17, P27, P28, P66, P72, P74
Planning conditions will require an updated Travel Plan before commencement, engineering details of access junctions, footways and a toucan crossing, a phasing plan, a highways infrastructure completion plan, a Construction Management Plan, and a detailed landscaping strategy for each reserved matters application. Report P21, P23, P25, P29, P30, P189
The toucan crossing on Ellesmere Road and southern footway improvements must be built before occupation, and the toucan crossing must be in place before the 50th dwelling is occupied. Report P25
The money
- £5,000 per dwelling Maximum active travel contribution under Section 106, subject to further assessment of local infrastructure Report P17, P28
Options considered
- Chosen: Grant outline permission subject to Section 106 and conditions (officer recommendation). Tilted balance under NPPF paragraph 11(d) applies, no protected-area clear reason for refusal, and benefits of housing supply outweigh identified impacts Report 1.3, P156, P157, P164
- Rejected: Refuse on grounds of premature development before the North West Relief Road. Highway Authority is satisfied the 450 dwellings can come forward before the NWRR opens without significant transport impact Report P5, P12, P58, P167
- Rejected: Further defer to consider Chester Street and Movement Strategy impacts. The March 2026 technical note confirmed impacts below the 5% assessment trigger; the Movement Strategy is a material consideration of limited weight that does not override the Development Plan Report P5, P12, P13, P14
- Rejected: Phase 1 only (150 dwellings) before the NWRR. The Highway Authority accepted the full 450 dwelling quantum before the NWRR following further assessment Report P56, P58
Implications
- Legal: A Section 106 agreement must be completed before permission is granted, securing affordable housing at 10% and a range of financial contributions, with any unspent active travel monies returnable after 10 years. Report P17, P27, P28, P59
- Equalities: The development would generate an estimated 1,080 additional patients placing pressure on already oversubscribed local GP and dental services, with a financial contribution sought towards healthcare provision. Report P73, P109
- Climate: The proposal has been criticised by objectors for conflicting with the council's Climate Emergency declaration, with no zero-carbon homes proposed and reliance on car-based travel; officers found the landscape strategy provides carbon and habitat mitigation but did not assess carbon neutrality. Report P99, P112, P113, P128, P187, P188
- Risk: Active Travel England formally deferred and did not support the application, citing shortcomings in the Transport Assessment and Travel Plan, reliance on 2011 Census data, and need for more ambitious walking, wheeling and cycling targets; the Highway Authority nonetheless raised no objection. Report P17, P83, P84, P85, P86, P87
- Other: The site lies within 60m of the Old River Bed SSSI, separated by the A528; technical work concluded no adverse effect on the SSSI subject to drainage design and construction controls. Report P76, P77, P206
Who and where
- Future residents of up to 450 dwellings on the north side of Shrewsbury Report P35, P36, P144
- Existing residents of Ellesmere Road, Greenfields, Cedars Drive, Winney Hill View, Hencote Lane and adjacent streets who would experience construction activity and visual change Report P115, P197, P199
- Users of Public Rights of Way to the north and north-west of the site Report P198
- Drivers and pedestrians using Ellesmere Road, Coton Hill, Chester Street and the wider Shrewsbury network Report P107, P172
- Local schools, particularly Greenfields Primary, and secondary schools in Shrewsbury Report P66, P109
- Local GP surgeries and dental services, with the Integrated Care Board estimating about 1,080 additional patients Report P72, P73, P109
- Shrewsbury Town Council, which objected to the application Report P94, P95, P96, P97, P98, P99, P100, P101, P102
- Members of the public: 114 objections and 2 supportive representations received Report P105
Timeline
- June 2021: Screening Opinion issued, confirming the development does not need Environmental Impact Assessment Report 1.4, 1.5
- March 2022: Original Transport Assessment and Travel Plan submitted by the applicant Report P56
- June 2022: Updated badger survey submitted with mitigation strategy Report P64
- October 2025: Applicant's Technical Note 05707-T-002 submitted on highway impact of the full 450 dwellings Report P3, P58
- 17th February 2026: Application first considered by the Northern Planning Committee and deferred for further work Report 1.3, P5
- 31 March 2026: Applicant's Technical Note 05707-T-008 on highway impact submitted after deferral Report P5
- 2 April 2026: Applicant's Technical Note 05707-T-007 on active travel submitted after deferral Report P17
- 21 April 2026: Northern Planning Committee resolves to delegate authority to grant outline permission, subject to Section 106 and conditions
- Prior to commencement of development: Updated Travel Plan to be submitted and a phasing plan approved Report P21, P25, P30
- Prior to occupation of the 50th dwelling: Toucan crossing on the A528 Ellesmere Road to be constructed Report P25, P30
Plain English for the jargon
- Outline planning permission: Permission that establishes whether a development is acceptable in principle, with detailed design matters reserved for later approval.
- Section 106 agreement: A legal agreement between a developer and the council used to secure affordable housing, financial contributions and other planning obligations.
- NPPF paragraph 11(d) tilted balance: The National Planning Policy Framework rule that planning permission should be granted unless adverse impacts significantly and demonstrably outweigh benefits, applied where the council cannot show a five-year housing land supply.
- NWRR (North West Relief Road): A proposed road scheme in Shrewsbury considered as a way of relieving traffic; uncertainty over its delivery shaped the assessment of this application.
- Biodiversity net gain: A measurable improvement in biodiversity on a development site, with the proposal claiming at least 10% net gain.
- SSSI (Site of Special Scientific Interest): A statutory nature conservation designation; the Old River Bed SSSI lies about 60m from the site.
- Reserved matters: Details such as layout, scale, appearance and landscaping that an outline application leaves to a later application.
- Toucan crossing: A signal-controlled crossing shared by pedestrians and cyclists.