Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)
DecidedPlanning1 paper
AI summaryShropshire Council's Southern Planning Committee has granted permission for variations to conditions at the Swancote Energy anaerobic digestion plant, capping feedstock at 120,000 tonnes per year and requiring access realignment within six months.
Written from the decision and the officer reportPDF Pro
OutcomeDecidedVariation of three conditions on prior consent approved
MoneyNone statedNo sums mentioned in the papers
What happens nextOfficers to redraft conditionsDelegated to review and reattach conditions from 2010 consent
Who it affectsSwancote Farm, BridgnorthOn-farm anaerobic digestion and renewable energy site
What was decided
The committee approved the variation of conditions 3, 9 and 10A attached to the 2010 permission, following the officer recommendation. Report P20, P22
The total feedstock received at the site is capped at 120,000 tonnes per annum, with records of quantities and types to be kept available to the council. Report P33, P34
Officers were given delegated authority to review the conditions attached to 10/03881/MAW and redraft and reattach them to the new consent as appropriate.
Why
The proposal was assessed against national and local planning policy, including the National Planning Policy Framework and Shropshire's Core Strategy and SAMDev plan policies on waste management, sustainable design and the countryside. Report P16, P17, P18
The recommendation balanced human rights, equalities, and the risk of not determining the application against the possibility of appeal or judicial review. Report 8.2, P7, P8, 8.3, P11, P1, P5
The conditions are intended to protect general amenity, environmental protection and highway safety, with the access realignment needed to enable safe HGV movements. Report P34, P36, P38
What happens next
Within six months of the permission, the site access must be realigned in accordance with the approved drawings. Report P37
Officers will review the conditions attached to the 2010 consent and redraft them as needed for the new permission.
The applicant must maintain records of feedstock quantities and types, available to the council on request. Report P33
The money
120,000 tonnes per annum Maximum feedstock allowed at the anaerobic digestion plant Report P33
Options considered
Chosen: Grant planning permission subject to conditions as recommended by officers. Per officer recommendation, with delegation to refine conditions from the 2010 consent
Implications
Risk: The applicant can appeal against the decision or conditions, and a third party could seek judicial review within six weeks. Report P2, P4, P5
Financial: Defending any appeal or judicial review would be at the authority's cost, with the amount depending on the scale and nature of the challenge. Report P12
Legal: Human rights and equalities legislation were taken into account in reaching the recommendation. Report P9
Other: The site must be operated so that feedstock is kept inside dedicated buildings and digestate inside dedicated lagoons and buildings. Report P35, P36
Who and where
Swancote Energy Ltd (applicant and operator) Report P3, P20
Local residents and landowners near Swancote Farm, Bridgnorth Report P8
Highway users on the adjoining road (HGV movements) Report P37, P38
Cllr Dawn Husemann, local member Report P29
Councillor David Walker, Cabinet Member (Portfolio Holder) Report P26
Timeline
20 December 2010: Original AD plant permission 10/03881/MAW granted Report P20
24 May 2023: Additional AD infrastructure and lagoon approved under 23/00748/FUL Report P20
16 June 2025: Split decision on non-material amendment 25/01893/AMP Report P20
26 May 2026: Variation of conditions 25/02645/VAR granted by Southern Planning Committee Report P3
Within 6 months of permission: Access must be realigned to approved drawings Report P37
Plain English for the jargon
Anaerobic digestion (AD): A process that breaks down organic material in the absence of oxygen to produce biogas and digestate, used here to generate renewable energy.
Variation of condition: An application to change the wording or requirements of conditions attached to an existing planning permission.
Feedstock: Organic material such as food waste, slurry, manure or energy crops used as input to the anaerobic digestion process.
Digestate: The solid and liquid material remaining after anaerobic digestion, which can be used as a soil conditioner.
Judicial review: A court process to challenge the lawfulness of a public body's decision.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item9
Resolved
RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Appendix 1 with delegation to officers to review the conditions attached to 10/03881/MAW and redraft and reattach to the consent as appropriate.
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Recommendation:- Grant Permission subject to the conditions set out in Appendix 1 with delegation to officers to review the conditions attached to 10/03881/MAW and redraft and reattach to the consent as appropriate.
REPORT
1.0THE PROPOSAL
1.1The application seeks to vary existing planning conditions to increase the permitted feedstock throughput at an established Anaerobic Digestion (AD) facility at Swancote Farm from 70,000 to 120,000 tonnes per annum. The proposal involves a transition away from energy crops (such as maize), with all feedstock proposed to be derived from non-agricultural food waste, liquid wastes and farm manures. The only built development proposed relates to access improvement works. These changes are sought through a section 73 application which enables the variation of conditions attached to a previous consent.
2.0SITE LOCATION/DESCRIPTION
2.1Swancote Farm is situated some 2 kilometres to the east of Bridgnorth, to the south of the A454 highway at Swancote. Access to the site is off the A454 highway via a private drive. The existing site provides parking and manoeuvring space in the existing concrete yard area.
2.2There are a number of residences in the area around Swancote Farm, the closest of which that are not associated with the AD facility are residences along the A454 to the north, the closest of which is approximately 160 m distant, with Firs Croft approximately 200 m to the north and Swancote Rise approximately 230 m to the north-east of the AD. The residences at Hoccum and Hoccum Cottages are approximately 350 m to the south-east and there are residences on The Hobbins that are approximately 600 m to the south-west of the existing site.
3.0REASON FOR COMMITTEE DETERMINATION OF APPLICATION
3.1Complex or major application which in the view of the Director of Legal, Governance and Planning, or the Planning Services Manager in consultation with the Chairman or Vice Chairman should be determined by the relevant Planning Committee.
4.0Representations
4.1Consultee Comments AGENDA ITEM
- 26th May 2026 Swancote Energy Ltd
4.1.1 SC Ecologist SC Ecology have no comments to make on this VAR.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.