CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Slough Borough Council
Slough Health & Wellbeing Board, Wednesday 12 November 2014 at 5.00pm

Heatherwood and Wexham Park Operational Resilience and Capacity Planning (ORCP) 2014/15

Noted Committee 2 papers

Slough Health & Wellbeing Board noted this item on Wednesday 12 November 2014. Below is the council's own wording, with the papers it was decided on.

Item32

Resolved

Resolved – (a) That the update on the Operational Resilience and Capacity Planning 2014/15 at Heatherwood and Wexham Park be noted. (b) That the concerns of the Board be expressed in relation to timescales imposed on the planning process for Winter 2014/15.
Word for word from the decision Slough published for this meeting. Source: democracy.slough.gov.uk

Follow this further

Built from Slough's papers

What the report saysPro

Report to Slough Health & Wellbeing Board

Purpose of report

To inform the wellbeing board on the supersession of winter planning with ORC Planning and the consequent evolution of urgent care boards in to System Resilience Groups (SRGs).

To give sight of the 2014/15 ORCP and take comments to further refine local implementation plans.

Recommendation

The Committee is requested to note the report – The ORCP as attached

3. ORCP Guidance 2014/15

In June 2014, fresh Guidance was issued by Monitor, the Trust development agency, ADASS and NHS England.

Operational Resilience & Capacity Planning 2014/15 Guidance Overview

• Set out the process to oversee system level operational resilience and capacity of planned and urgent care

• Set out requirements for; and expectation of; System Resilience Group

• Required systems to build upon Urgent Care Board collaborative approach

• Required Submission of a robust plan for assurance by 30th July. Release of the non- recurrent funding allocations to CCGs was contingent on “passing the plan”

• East Berks in highest risk category and required tripartite sign off inclusive of National approval.

• Although first submission was 30th July, NHS England accepted that submission would be before full GB and provider board meetings and expected sign off to through August or September Governing Bodies 3a. Local Context

Unlike winter planning and urgent care boards, system resilience groups must lead on planned as well as unplanned care for a population defined as the catchment area of a major emergency centre. In our case this is defined as the Heatherwood and Wexham Park System. In 2013/14 and prior years, funding was allocated through a bidding process; for 2014/15 allocation is on a “fair share “basis. The impact of this has been that instead of an allocation of over £6m in 2013/14 the maximum allocation on fair share basis has been £2.1 million.

However, it is important to note that the system is already better equipped for this winter than the last, in a number of key areas.

System strengths: • Building work at HWPH is now complete • Many service developments from winter 2013/14 are now embedded in every day working • The 18 week recovery plan is on track • Additional bed capacity is in the system • Bracknell health space is relieving pressure on A&E • Improved communication and flow for discharge • Primary care enhanced services e.g. Slough Prime Ministers Challenge Fund initiatives 3b. The Allocation and Prioritisation Process

Given the reduction in available monies and previous expectations it was essential to develop a robust and transparent process for approval of funding bids from system partners. The multiple step process is represented diagrammatically below. 3c. Funded Schemes As a result of the above process the following schemes were included in our ORCP submission. 3d. In Update

After submission of our plan, an SRG challenge meeting with NHS England, Monitor, and ECIST (Emergency Care Intensive Support Team) was convened on the 11th September. In response to feedback from this session updates were made to the draft and the Final Plan submitted on the 30th September. The ORCP was formally signed off by SRG, Governing bodies and NHS England in October and funding has now been released to CCGs for distribution to partners organisations.

4. Other Implications

(a) Financial

The reduction in allocated monies may have financial implications if further risks arise throughout this winter.

(b) Risk Management

There are no recommendations and thus no risks associated with decision-making.

(c) Human Rights Act and Other Legal Implications

There are no Human Rights Act Implications.

(d) Equalities Impact Assessment

Not applicable

5. Supporting Information

Not applicable.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
ORCPAppendix HWPH 3.6 MB Download
PDF
Heatherwood and Wexham Park Operational Resilience and Capacity Planning (ORCP) 2014/15Report 373 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 12 attended
RA
Councillor Robert AndersonCommittee Member, present
SH
Councillor Sabia HussainCommittee Member, present
RB
Ruth BagleyCommittee Member, present
SB
Simon BowdenCommittee Member, apologies
RK
Ramesh KukarCommittee Member, absent
LL
Lise LlewellynCommittee Member, present
JO
Dr Jim O'DonnellCommittee Member, present
DP
Dave PhillipsCommittee Member, present
CP
Colin PillCommittee Member, absent
MT
Matthew TaitCommittee Member, apologies
JW
Jane WoodCommittee Member, apologies
SK
Shabana KauserDemocratic Services Officer, expected

On this subject at Slough

Search all
  1. Heatherwood and Wexham Park Operational Resilience and Capacity Planning (ORCP) 2014/15This decision
  2. Heatherwood & Wexham Park Operational Resilience and Capacity Planning for Winter 2015/16Noted

More from Slough Slough Health & Wellbeing Board

All decisions
MeetingDecisionOutcome
16 Sep 2025 Appointment of Vice Chair of the Health & Wellbeing Boardthat [name removed], be appointed vice-chair for the 2025-26 Municipal Year. Decided Open
16 Sep 2025 Minutes of the last meeting held on 17 June 2025That the minutes of the last meeting held on 16 June 2025 were agreed to be a true and accurate record. Agreed Open
16 Sep 2025 Health Protection PartnershipResolved : that the report be noted. Noted Open
16 Sep 2025 Suicide Prevention Partnership Updatethatthe report be noted. Noted Open
16 Sep 2025 Slough Joint Local Health & Wellbeing Strategy - Draft & Consultation PlanResolved – that the draft Strategy be approved for a 6-week consultation. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies