CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Solihull Metropolitan Borough Council
Planning Committee, Wednesday 11 December 2013 at 6.00pm

2013/1811/S CRAIG CROFT CHELMLSEY WOOD

Approved Planning 6 papers

Planning Committee approved this item on Wednesday 11 December 2013. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

RESOLVED – Conditional approval with condition 5 amended as per the update note.
Word for word from the decision Solihull published for this meeting. Source: democracy.solihull.gov.uk

Follow this further

Built from Solihull's papers

What the report saysPro

Report to Planning Committee

Background

Planning permission was granted in June 2012 for a hybrid application with part of the development being in outline with some reserved matters and part full for the demolition of existing buildings, creation of new infrastructure including junction to chester road and associated highway works, public realm & redevelopment of the new village centre comprising commercial units (Use Classes A1, A3, A5, D1, offices (B1), and residential apartments (C2 & C3).

The elements of the scheme that sought full planning permision were: -

• The Enterprise Centre; and • Highway works including public realm.

The works have now commenced on both elements that have full planning permission.

The Enterprise Centre (Building Two) on the approved site layout plan is located on the Chester Road/Hedigham Grove junction. The Enterprise Centre is a managed workspace facility offering office space to small and start-up business. The nature of the target tenants requires flexibility and a range of unit size with opportunity to provide support services. The building is proposed to be 3-storey with ground floor public space and upper floors used as private space. The building has a maximum height of 12.75 metres including the roof parapet. The primary entrance will be from the Chester Road with a secondary access from the rear.

The highway works now commenced include various proposals that include: -

• A new all movement signal controlled T junction with integrated pedestrian/cycle crossing at the Chester Road/High Street intersection; • Closure of existing underpass; • One lane of vehicular carriageway in each direction of the Chester Road to be replaced by a cycle lane; • Narrower carriageway to Chester Road; • Physical road narrowing events and features to include 2 no Toucan crossings, gateways at the start and end of Chester Road corridor, signage and soft landscaping/tree planting, refuge islands with illuminated bollards at approximately 100m spacing between other feature, and central reserve tree planting at strategic locations; • White line hatching between cycle lane and carriageway; • Edge of carriageway white line to offside carriageway; • Green surfacing to cycleway at and on approaches to junctions; • Tighter radii at vehicular junctions namely Woodlands Way, Dunster Raod and islands at Coleshill Heath Road/Chester Road and Chester Road/Moorend Avenue; and • Roundel markings and signage to communicate reduction in speed to 40mph.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
2013/1811/S CRAIG CROFT CHELMLSEY WOODReport 66 KB DownloadRead as text
PDF
block_planReport 135 KB Download
PDF
location_planReport 208 KB Download
PDF
phase_1_car_parkReport 1.2 MB Download
PDF
proposed_site_planReport 1.2 MB Download
PDF
sketch_perspective_oneReport 1.8 MB Download

At this meeting

Whole meeting

Who was there

9 of 9 attended
DB
Councillor David BellChairman, present
HA
Councillor Howard AllenCommittee Member, present
DC
Councillor Don CornockCommittee Member, present
KH
Councillor Ken HawkinsVice-Chairman, present
RH
Councillor Robert HullandCommittee Member, present
AM
Councillor Alan MartinCommittee Member, present
JR
Councillor Jim RyanCommittee Member, present
GS
Councillor Glenis SlaterCommittee Member, present
JW
Councillor John WindmillCommittee Member, present

On this subject at Solihull

Search all
  1. 2013/1811/S CRAIG CROFT CHELMLSEY WOODThis decision
  2. 2014/319 - Craig Croft Medical Centre 139 Dunster RoadApproved

More from Solihull Planning Committee

All decisions
MeetingDecisionOutcome
17 Jun 2026 Birmingham Airport Night Flying Policy Sub-CommitteeRESOLVED That Councillors Bob Grinsell (Chairman), Jane Lamden and David Hoey were elected to sit on the Birmingham A... Decided Open
27 May 2026 Appointment of chairmanRESOLVED Councillor Bob Grinsell was elected Chairman for the Municipal Year 2026/27. Decided Open
27 May 2026 Appointment of vice-chairmanRESOLVED Councillor James Bradley was elected Vice-Chairman for the Municipal Year 2026/27. Decided Open
21 May 2025 Appointment of ChairmanRESOLVED Councillor Bob Grinsell was elected Chairman for the Municipal Year 2025/26. Decided Open
21 May 2025 Appointment of Vice-ChairmanRESOLVED Councillor Prish Sharma was elected Vice-Chairman for the Municipal Year 2025/26. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies