Conditional approval with condition 5 amended to read:- (5) Prior to the occupation of development, a parking monitoring regime shall be put in place and this shall include monitoring of on-site parking occupancy and off-site parking occupancy on streets within 400m of the site at a frequency, to be agreed with the LPA, but being no less than every other month and an on-going log kept of any complaints made in relation to parking around the school. This monitoring regime shall be implemented prior to occupation of development and for a period of six months. In the event that there is significant on-street parking nuisance identified as caused by employee/student parking associated with the sixth-form, a suite of mitigation measures shall be submitted to, and approved by the LPA, and thereafter implemented by the school in accordance with the approved details. Such measures shall include funding the implementation of traffic regulation orders on surrounding roads. To control the intensity of use and impact on amenity/highway safety in accordance with Policies P8 and P14 of the Solihull Local Plan (2013). Members requested that Travel Plan (condition 8) shall be reported to committee for discharge.
Word for word from the decision Solihull published for this meeting.Source: democracy.solihull.gov.uk
Alderbrook School Blossomfield Road Proposal: 3 No. storey Sixth Form building providing circa 2000m of new teaching facilities. Case Ref: PL/2015/50259/PPFL Location Alderbrook School Blossomfield Road Solihull B91 1SN Ward: St Alphege Parish: Non-Civil Parish Or Community Applicant: [name removed] Registered: 12.03.2015
Reason for The application has been submitted by (or on behalf of) Referral to the Council (or it relates to Council owned land) and there Planning has been one objection or more. Committee:
Recommendation: APPROVAL
PROPOSAL
The application seeks planning permission for the construction of a new three-storey building to provide a new sixth form facility plus alterations to the existing car parking layout at Alderbrook School on Blossomfield Road.
The proposed building will allow the school to offer teaching facilities for up to 250 sixth-form students, as the school has recently been granted sixth form status to offer post-16 provision for students in South Solihull.
The new building is proposed to be sited to the south-east of the of the existing hard- standing/playground area and to the east of the existing tennis/netball courts. The main school buildings are located on the opposite side of the hard- standing/playground. There is also a car parking area located immediately to the north of the proposed site of the building.
The proposed building will be positioned on part of a larger grassed area which faces onto Dingle Lane. The Dingle Lane site boundary comprises a boundary hedge interspaced by a number of mature trees. There are also mature trees in the verge on the opposite side of Dingle Lane, with residential properties positioned beyond this facing the school grounds.
The proposed building will have a footprint measuring 42.5m in length and 17.0m in width plus a small projection to the north. It will be three-storeys in height, measuring 10.3m to the main parapet wall level and 11.8m to the stair/lift towers at each end of the building.
In terms of building design, a fairly contemporary approach is proposed. The building will have a flat roof behind a parapet with metal handrail above. The main SW elevation facing Dingle Lane contains full height aluminium windows on the ground floor with standard height windows for the two storeys above. Metal ‘Brise Soleil’ shading screens are placed above each window level. The main SW elevation wall will be constructed in white Steni façade panelling (SN8001) with feature panelling in purple (SN9107) around some of the second floor windows and picking out the stair/lift towers at each end.
The other main NE elevation faces into the internal part of the school grounds is similarly designed although slightly more colour is introduced – the building entrance (also containing full height aluminium windows and curtain walling) and the assembly hall front projection is constructed in purple Steni façade panelling (SN9107) and the ground floor walling is to be constructed in lime green panelling (SN9302).
The two end elevations (SE and NW) are mainly constructed in white panelling with the glazing and purple detailing to pick out the stairwells.
10 new parking spaces are proposed to be provided next to the western end of the building. A small hard-standing area will be provided around the building with a slightly larger seating area alongside the SW elevation.
The application is accompanied by: - Site Layout Plan showing the position of the building - Detailed plans and elevations of the proposed building - Internal Floor Plans - Design & Access Statement - Transport Assessment - Ecological Survey (whole site) - Tree Survey (whole site)
CONSULTATION RESPONSES
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.