Resolved
Conditional approval with amendments to conditions 4 and 5, and the removal of condition 9, and subject tot the applicant entering into a Section 106 Agreement to secure £10,000 towards Traffic Regulation Order contributions with a claw-back if the monies are not expended on or after six years of full application. Amended conditions to read:- (4) Notwithstanding the plans already submitted the development shall not be commenced until such time as a scheme to manage the surface water runoff from the development has been submitted to and approved in writing by the Local Planning Authority, with no occupation until the scheme is operational. Prior to the submission of those details, an assessment shall be carried out into the potential for disposing of surface water by means of sustainable drainage systems ( SuDS ), and the results of the assessment provided to the Local Planning Authority. The submitted details shall:- ( i ) provide information about the design, including detailed engineering drawings of all drainage features, and evidence that the site will be effectively drained in all storm events up to 1 in 100 years with an appropriate allowance for climate change; (ii) specify a timetable for the implementation of the Suds scheme; (iii) provide a management and maintenance plan for the lifetime of the development, which shall include the arrangements for adoption by any public authority or statutory undertaker, and any other arrangements to secure the operation of the scheme throughout its lifetime; and (iv) provide plans showing that the building will be protected in the event of blockage or exceedance of the drainage system. The scheme shall be implemented, maintained and managed in accordance with the approved details. To secure the satisfactory drainage of the site in accordance with the NPPF, as well as Policy P11 and P15 of the Solihull Local Plan 2013. (5) The development hereby approved shall not commence until full details of the translocation of landscape features (trees) from the development site to the relocation site as shown on plan ASM-FEA2479-EX-XX-PL-A-1100 have been submitted to and approved in writing by the Local Planning Authority. Details shall include a plan showing their proposed location, an arboricultural method statement demonstrating the preparation of the receptor site, the timing of the translocation, any works to the trees to prepare them for moving, establishment, maintenance and monitoring while in the temporary location, and provision for replacements should any fail. Thereafter, the scheme shall be implemented in accordance with the approved details and if within a period of 5 years from the date of planting any tree, that tree or any tree planted in replacement for it, is removed, uprooted, destroyed, dies or becomes seriously damaged or defective, another tree of the same species and size as that originally planted shall be planted at the same place within the next planting season (October-March), unless the Local Planning Authority gives its written consent to any variation. To minimise the effect and enhance the character of the development in accordance with Policy ...