CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
South Kesteven District Council
Planning Committee, Tuesday 26 April 2011 at 1.00pm

PLANNING MATTERS

Deferred Planning 3 papers

Planning Committee deferred this item on Tuesday 26 April 2011. Below is the council's own wording, with the papers it was decided on.

Item105

Resolved

- To determine applications, or make observations, as listed below:- NB1 Application ref: S10/2312 / FULL Description: Change of use from residential (C3) to restaurant (A3) and hotel (C1) and erection of single storey and part two storey rear extension Location: 4, St Marys Place, Stamford, Lincolnshire, PE9 2DN Deferred Pending an assessment of the recommendations of the noise consultant. NB2 Application ref: S10/2313 / LB Description: Alterations and extensions to listed building Location: 4, St Marys Place, Stamford, Lincolnshire, PE9 2DN Deferred Pending an assessment of the recommendations of the noise consultant. NB3 Application ref: S11/0431 / MJNF Description: Solar farm including 2.2m high boundary fence and associated equipment Location: Land Adjacent Lodge Farm, Spalding Road, Bourne Approved Noting comments made during the public speaking session from:- [name removed] – objecting [name removed] – applicants together with no objection from Bourne Town Council or Natural England, comments from the Black Sluice Internal Drainage Board and Lincolnshire Archaeology, no objection from the Highway Authority, objections from nearby residents; late information report circulated to members at the meeting including confirmation from the Environment Agency that they do not object subject to an imposition of a condition, together with the suggested condition referred to, report of site inspection and comments made by members at the meeting. It was proposed, seconded and agreed that the application be approved, subject to the summary of reasons set out by the case officer in the circulated report, and subject also to the following conditions:- 1. The development hereby permitted shall be commenced before the expiration of five years from the date of this permission. 2. No development shall take place within the application site until the applicant has secured the maintenance of an on-site watching brief by a suitably qualified and experienced archaeologist during construction work in accordance with written details which have been submitted to and approved in writing by the Local Planning Authority. In the event of important archaeological features or remains being discovered which are beyond the scope of the watching brief to excavate and record and which require a fuller rescue excavation, then construction work shall cease until the applicant has secured the implementation of a further programme of archaeological work in accordance with a written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority. 3. Before development commences a working design, methods statement and timetable of works to mitigate any adverse impacts to badgers shall be submitted to and agreed in writing with the Local Planning Authority. 4. Site clearance operations that involve the destruction and removal of vegetations on site shall not be undertaken during the months of March to August inclusive, except when approved by the Local Planning Authority, to ensure that breeding birds are not adversely affected. 5. No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority ... view the full minutes text for item 105.
Word for word from the decision South Kesteven published for this meeting. Source: moderngov.southkesteven.gov.uk

Follow this further

Built from South Kesteven's papers

What the report saysPro

Report to Planning Committee

Local Gov Issues, Acoustics, Health & Safety, Food Hygiene, Planning, Pollution, Licensing, Nuisances, Catering Design, Training.

Analysis of Environmental Impacts Proposed development 4 St. Mary's Place Stamford by Mike Stigwood, MAS Environmental 6th April 2011

1.0Introduction and outline. 1.1 I have particular expertise not just in Environmental Health related matters and acoustics but also commercial kitchen design. I have designed a significant number of large and small commercial catering kitchens and have particular expertise in ventilation requirements and odour control. As a consequence I am able to provide expert advice on the interrelationship between kitchen design requirements and odour and noise control. I have also been directly involved in odour nuisance cases where carbon filters have failed due to incorrect ventilation design. i consider I have expertise in relation to the competing issues in this case.

1.21) Odour and kitchen extract requirements. There is legitimate concern over the adequacy of the kitchen ventilation system as proposed which may ultimately require changes to the external layout in order to achieve the ductwork and airflow required.

1.3There are limitations to the airflow speed through ductwork and fans and ventilation related equipment is designed with these tolerances taken into account. For example the noise emissions from a fan or terminus are based on the normal pressure drop values caused by ductwork limitations and a range of airflow speeds. High airflow leads specifically to internal duct turbulence which in turn generates increased noise. In the circumstances of this case this leads to unpredictable levels of noise and a number of other problems. This is entirely different to increasing the final terminal velocity (efflux velocity) in an attempt to improve dispersal of pollutants.

14 SOUTH ROAD, IMPINGTON, CAMBS CB24 9PB tel/ans: 01223 441671 / 510430 mob: [phone removed] e - m a i l : m a s @ m a s e n v. c o . u k . www. m a s e n v. c o . u k . partners: MIKE STIGWOOD FRSPH, MIOA. TERRI STIGWOOD FRSPH Cert ed. 1.4 Where plant operates outside of its tolerances noise generation can increase substantially and there is no manufacturer's guarantee. Warranty is also lost. Similarly odour control systems are based on the same tolerances and cannot be expected to adequately perform when operated outside of their normal tolerances for airflow. Odour control systems are particularly sensitive to airflow rates and their success generally requires lower than normal airflow speeds. In this case the chimney flue limitations leads to substantially higher airflow rates than is usually designed for. This may in part be addressed by siting the odour control close to the kitchen canopy but that introduces further problems of its own.

1.5Where the limitations prevent adequate air extract and make-up supply air, fugitive emissions become a serious concern leading to unacceptable risks of localised odour issues. In view of the enclosure by buildings, entrapment of these odours is a high risk. It follows therefore for an odour control system to be acceptable there needs to be appropriate airflow rates, sufficient contact time between the odour counteracting medium and the gaseous stream and suitable temperatures.

1.6In summary, ventilation requirements, odour and noise control are all inter-related.

1.7The airflow rate required for the chimney flue space is excessive and it is unlikely the various plant will be able to meet both general health and safety requirements as well as the requirements to adequately mitigate the impact that the planning conditions are designed to address.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Agenda: 26 04 11Agenda 122 pages Download
PDF
MASReport4StMarysStamford110407Report 60 KB DownloadRead as text
PDF
PLANNING MATTERSReport 28 KB Download

At this meeting

Whole meeting

On this subject at South Kesteven

Search all
  1. PLANNING MATTERSThis decision
  2. Procedure for returning consultations on planning applications being determined by neighbouring authorities and county matters being determined by Lincolnshire County CouncilAgreed
  3. Planning mattersApproved
  4. Planning mattersRefused
  5. Planning mattersApproved
  6. Planning mattersApproved

More from South Kesteven Planning Committee

All decisions
MeetingDecisionOutcome
3 Sep 2026 Application S26/0096Decision It was proposed, seconded and AGREED to authorise the Assistant Director – Planning & Growth to GRANT planni... Agreed Open
3 Sep 2026 Application S26/0354Decision It was proposed, seconded and AGREED to authorise the Assistant Director – Planning & Growth to GRANT planni... Agreed Open
3 Sep 2026 Application S25/1082Decision It was proposed, seconded and AGREED to authorise the Assistant Director – Planning to GRANT planning permis... Agreed Open
16 Apr 2026 Application S26/0363It was agreed that Officers would consult with Grantham Civic Society were the application approved and a note would ... Agreed Open
16 Apr 2026 Application S25/2342It was AGREED to extend the meeting until 18.00 The meeting adjourned at 16.52 and resumed at 17.01. Proposal: Outlin... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies