Resolved
To approve the application subject to conditions Noting comments made during the public speaking session by: Applicant/Applicant’s Agent Rebecca Rutter Together with: · No objection subject to conditions from Lincolnshire County Council (Local Highway and Lead Local Flood Authority) · No objection from Anglian Water · No comments from the Upper Witham Internal Drainage Board · No objection from Lincolnshire Police (Force Crime Prevention Design Advisor), subject to the development taking into account safety and security · Concerns raised and further information requested from SKDC Environmental Services · An objection from Lincolnshire Fire and Rescue and the requirement for the installation of one fire hydrant · Representations received as a result of public consultation · Provisions within the National Planning Policy Framework and the South Kesteven Local Plan and supplementary planning documents · Comments made by Members at the meeting It was proposed, seconded and agreed that the application be approved for the summary of reasons set out in the case officer’s report, subject also to the following conditions: Time Limit for Commencement 1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Approved Plans 2. The development hereby permitted shall be carried out in accordance with the following list of approved plans: 2458-051 Site Location Plan A4 2458-100C Proposed Site Plan A1 2458-101 Proposed GA A1 2458-102A Proposed Elevations A1 2458-103A Proposed Sections A1 2458-104 Proposed Roof Plan A1 2458-06T/ 07A CGI image A3 2458-VL_L01F Landscape Plan_A1 V2458_D01 Tree Pit Detail-Soft_A3 Unless otherwise required by another condition of this permission. Before the Development is Commenced 3. Prior to the commencement of the development hereby permitted, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority, this shall indicate measures to mitigate against traffic generation and drainage of the site during the construction stage of the proposed development. The development shall then be carried out in accordance with the approved CEMP. The CEMP shall include, though not necessarily be restricted to the following details: a) A site waste management plan; b) A Traffic Management Plan incorporating the routing construction traffic and details of heavy vehicle patterns (including earliest and latest times and suspension of rips during peak traffic times; c) Measures to minimise and control noise, vibration, dust and fumes during site preparation works; d) Details of the site parking of all vehicles of site operatives and visitors; e) The location, extent and duration of any temporary stockpiling areas; f) Measures to prevent mud being deposited on the surrounding highway; g) Phasing of the development to include access construction; h) Loading/unloading of plant and materials used in constructing the development; i ) Construction activities not to take place outside the hours of 08;00 to 18:00 Mondays to Fridays or 0900 to 1400 on Saturdays and not at any time ... view the full minutes text for item 91c