It was proposed, seconded and AGREED to APPROVE the application conditionally : Time Limit for Commencement 1 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason: In order that the development is commenced in a timely manner, as set out in Section 91 of the Town and Country Planning Act 1990 (as amended). Approved Plans 2 The development hereby permitted shall be carried out in accordance with the following list of approved plans: i. Site Plan Proposed Dwg . No. 02D ii. Ground Floor Plan – Proposed - Dwg . No. 03A iii. First Floor Office – Second Floor Office -Proposed Dwg . No. 06B iv. Elevations Proposed – Dwg . No. 04A Unless otherwise required by another condition of this permission. Reason: To define the permission and for the ... view the full minutes text for item 32.
Word for word from the decision South Kesteven published for this meeting.Source: moderngov.southkesteven.gov.uk
S23/0404 Proposal: Proposed Office and Production Building Location: Land Off Hards Lane, Frognall Applicant: Garford Farm Machinery Ltd Agent: G R Merchant Ltd Application Type: Full/Major Reason for Referral to Member call in Cllr Phil Dilks – Impact on the character and Committee: appearance of the area Key Issues: Principle of development, Scale of development, Design/layout, Impact on residential amenity, Drainage, Highway safety, Sustainability
Kevin Cartwright – Senior Planning Officer 01476 406186 [email protected]
Corporate Priority: Decision type: Wards:
Growth Regulatory Deeping St James
Reviewed by: Phil Jordan – Development Management & 15 August 2025 Enforcement Manager
Recommendation (s) to the decision maker (s)
That the application is approved conditionally S23/0404 - Land Off Hards Lane, Frognall 1 Description of Site
1.1The application site is situated on the south side of Hards Lane, the unclassified public road leading east from Frognall out into agricultural land.
1.2The ground is generally flat; the site is a long rectangular field stretching south from Hards Lane to a linear field drain (site length approximately 164m, width 87m = 1.42 hectares). There are no enclosures or trees on the site of any note.
1.3To the west is the remainder of the gap site between the current application site and a well-established industrial/commercial area ‘This site/area includes a dwelling known as Orchardside.
1.4To the east is the industrial/commercial site currently occupied by Garford Farm Machinery (main occupier) and a range of subsidiary businesses in smaller units.
1.5Further to the east is the large commercial site operated by Kyoto Futons Ltd.
1.6On the opposite side of Hards Lane is ‘Five Acres’ – a farm including an agricultural dwelling.
1.7The gap mentioned in 1.3 above is also the subject of a current application, planning ref. S23/0401, for an industrial park. The application was submitted at the same time as S23/0404; and is considered elsewhere within this agenda.
1.8There are no specific planning constraints relating to the site.
2 Description of Proposal
2.1The submitted documentation indicates that the site would be developed for a single commercial building having a gross internal floorspace of 7324m2. This would be occupied by Garfords Farm Machinery Ltd.
2.2Within the Planning, Design and Access Statement, it is stated: “The aim of the new warehouse and offices is to combine the two premises they have one to the North of the site along Hards Lane and a premises at Spitfire Park 4.5 miles away. Along with the combining of the two premises will include expansion and allow for future expansion when required.”
2.3The submitted plans show that the building would occupy a substantial part of the overall site with its footprint being aligned with the western site edge, and its longest dimension being north-to-south. At its longest, the building would be 121m; at its widest (across the front elevation) it would be 71m.
2.4The building would in effect be three conjoined blocks with the front section being 10.1m in height to a parapet roof edge; the remainder would have a maximum ridge height of 10.1m and eaves height of 8m. The roller-shutter doors in the east elevation would each be 5m high. 2.5 The accommodation is arranged so that the production section would occupy the rear two- thirds of the length (although this is the narrower part of the building); the widest front section would provide flexible office/utility/training space; and the section in between would be for storage and sub-assembly.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.