Resolved
Resolved that the Board noted the case studies in Appendix A of successful flood alleviation and resilience schemes delivered in recent years within South Yorkshire.
MCA - Housing and Infrastructure Board noted this item on Wednesday 29 June 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved that the Board noted the case studies in Appendix A of successful flood alleviation and resilience schemes delivered in recent years within South Yorkshire.
Appendix A: Successful flood alleviation and resilience initiatives
The following case studies demonstrate successful approaches to flood alleviation and resilience within South Yorkshire:
Bentley Ings Pumping Station, Doncaster
Phase 1 of the Rotherham Renaissance Flood Alleviation Scheme, Rotherham
Lower Don Valley Flood Alleviation Scheme, Sheffield
Lang Avenue, Lundwood, Barnsley SMART Investment – Bentley Ings Pumping Station (BIPS), Doncaster Highlights Key Information
£14 million refurbishment scheme Located in the managed River Don floodplain, BIPS does not manage water Located in the River Don floodplain in the levels in the River Don. Instead BIPS Doncaster area directs water from Mill Dyke, Swaithe Dyke, and Bentley Ings Drain into the River Don Protects approx. 1669 residential properties and 150 businesses at the north Originally built in the 1940’s to help end of Bentley during a flood event alleviate mining subsidence issues by Danum drainage commissioner on behalf Improved resilience and access to BIPS of the National Coal Board under the during a flood event Doncaster Drainage Act (1920)
Active flood management – BIPS operates Became EA property in 2006 as part of the continually to protect over 3000 properties critical ordinary watercourses transfer in the area process. This 2 year process moved approx. 1800 ordinary (non main river) Originally constructed in the early 1940’s watercourses with roles in flood before becoming Environment Agency management under the EA’s jurisdiction (EA) property in the early 2000’s
Next step investigations spurred by the 2007 flooding incident when the pumping Refurbishment favoured over station’s low laying electrical equipment replacement due to multiple factors: became submerged causing flooding to approx. 600 properties £8 million capital saving over accommodating new build site which would New station has a 50 year structural life redirect flow 3km downstream to a new and a 25 year Mechanical, electrical, pump site instrumentation, control and automation (MEICA) life span Capital carbon saving of 60% (20% over government targets) by repurposing existing 1940’s concrete structures
13% cost efficiencies over the cost of a new build
Above: The original 1940’s era design of Bentley Ings Pumping Station Refurbishment allowed the existing site to have increased functionality and capabilities:
Operational Carbon reduced by 20% through modern pumps
20% increase to pumping capabilities through 4 modern pumps with greater resilience
Rotatable pump stand with stand-by position should one pump fail Above: The Refurbished Bentley Ings Pumping Station. Note the original 1940’s design in the Future proofed equipment has electrical centre surrounded by raised modern technology controls raised above the 1/1000 flood and high security fencing levels.
Improved access & resilience – The new Further Information high level causeway with integrated 1.5m high culverts allows water to flow through For further information on the Bentley Ings the Doncaster Flood Corridor unimpeded Pumping station, please contact: while maintaining vehicular and pedestrian access to BIPS during a flood incident Environment Agency
Installation of fish friendly dry weather flow Email pump designs especially designed to allow Connectedbywater@environment- fish to pass in and out of the pumping agency.gov.uk station undamaged. Phone Enhancements to biodiversity in the local 03708 506 506 area by installation of hedgerows, grasslands, and trees
Increased security – CCTV, alarms, and forced entry resistant perimeter fencing
Left: The high level access causeway with 1.5m high culverts beneath. Bentley Ings Pumping station can be seen in the distance. Responding to the Climate Emergency - Rotherham Renaissance Flood Alleviation Scheme - Phase 1 (Templeborough to Rotherham)
Project summary Detailed description
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
13a Flood Scheme Case StudiesReport | 1.8 MB | DownloadRead as text |
PDF |
Successful Flood Alleviation and Resilience SchemesReport | 527 KB | Download |
Follow MCA - Housing and Infrastructure Board at South Yorkshire Mayoral Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Mar 2023 | Minutes of Previous MeetingRESOLVED that the minutes of the previous meeting held on 8 February 2023 be approved. | Approved | Open |
| 16 Mar 2023 | Matters Arising / Action LogRESOLVED that the Action Log be noted. | Noted | Open |
| 16 Mar 2023 | Programme ApprovalsRESOLVED that the Board: Approve £3m grant award to Sheffield City Council for the “West Bar” project. Approve £1.3m ... | Approved | Open |
| 8 Feb 2023 | Minutes of Previous MeetingRESOLVED that the minutes of the meeting held on 8 December 2022 be approved. | Approved | Open |
| 8 Feb 2023 | Matters Arising / Action LogRESOLVED that the Action Log be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.