Successful Flood Alleviation and Resilience Schemes

Noted Committee 2 papers

MCA - Housing and Infrastructure Board noted this item on Wednesday 29 June 2022. Below is the council's own wording, with the papers it was decided on.

Item31

Resolved

Resolved that the Board noted the case studies in Appendix A of successful flood alleviation and resilience schemes delivered in recent years within South Yorkshire.
Word for word from the decision South Yorkshire Mayoral Combined Authority published for this meeting. Source: governance.southyorkshire-ca.gov.uk

Follow this further

Built from South Yorkshire Mayoral Combined Authority's papers

What the report saysPro

Report to MCA - Housing and Infrastructure Board

Appendix A: Successful flood alleviation and resilience initiatives

The following case studies demonstrate successful approaches to flood alleviation and resilience within South Yorkshire:

 Bentley Ings Pumping Station, Doncaster

 Phase 1 of the Rotherham Renaissance Flood Alleviation Scheme, Rotherham

 Lower Don Valley Flood Alleviation Scheme, Sheffield

 Lang Avenue, Lundwood, Barnsley SMART Investment – Bentley Ings Pumping Station (BIPS), Doncaster Highlights Key Information

 £14 million refurbishment scheme  Located in the managed River Don floodplain, BIPS does not manage water  Located in the River Don floodplain in the levels in the River Don. Instead BIPS Doncaster area directs water from Mill Dyke, Swaithe Dyke, and Bentley Ings Drain into the River Don  Protects approx. 1669 residential properties and 150 businesses at the north  Originally built in the 1940’s to help end of Bentley during a flood event alleviate mining subsidence issues by Danum drainage commissioner on behalf  Improved resilience and access to BIPS of the National Coal Board under the during a flood event Doncaster Drainage Act (1920)

 Active flood management – BIPS operates  Became EA property in 2006 as part of the continually to protect over 3000 properties critical ordinary watercourses transfer in the area process. This 2 year process moved approx. 1800 ordinary (non main river)  Originally constructed in the early 1940’s watercourses with roles in flood before becoming Environment Agency management under the EA’s jurisdiction (EA) property in the early 2000’s

 Next step investigations spurred by the 2007 flooding incident when the pumping Refurbishment favoured over station’s low laying electrical equipment replacement due to multiple factors: became submerged causing flooding to approx. 600 properties  £8 million capital saving over accommodating new build site which would  New station has a 50 year structural life redirect flow 3km downstream to a new and a 25 year Mechanical, electrical, pump site instrumentation, control and automation (MEICA) life span  Capital carbon saving of 60% (20% over government targets) by repurposing existing 1940’s concrete structures

 13% cost efficiencies over the cost of a new build

Above: The original 1940’s era design of Bentley Ings Pumping Station Refurbishment allowed the existing site to have increased functionality and capabilities:

 Operational Carbon reduced by 20% through modern pumps

 20% increase to pumping capabilities through 4 modern pumps with greater resilience

 Rotatable pump stand with stand-by position should one pump fail Above: The Refurbished Bentley Ings Pumping Station. Note the original 1940’s design in the  Future proofed equipment has electrical centre surrounded by raised modern technology controls raised above the 1/1000 flood and high security fencing levels.

 Improved access & resilience – The new Further Information high level causeway with integrated 1.5m high culverts allows water to flow through For further information on the Bentley Ings the Doncaster Flood Corridor unimpeded Pumping station, please contact: while maintaining vehicular and pedestrian access to BIPS during a flood incident Environment Agency

 Installation of fish friendly dry weather flow Email pump designs especially designed to allow Connectedbywater@environment- fish to pass in and out of the pumping agency.gov.uk station undamaged. Phone  Enhancements to biodiversity in the local 03708 506 506 area by installation of hedgerows, grasslands, and trees

 Increased security – CCTV, alarms, and forced entry resistant perimeter fencing

Left: The high level access causeway with 1.5m high culverts beneath. Bentley Ings Pumping station can be seen in the distance. Responding to the Climate Emergency - Rotherham Renaissance Flood Alleviation Scheme - Phase 1 (Templeborough to Rotherham)

Project summary Detailed description

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
13a Flood Scheme Case StudiesReport 1.8 MB DownloadRead as text
PDF
Successful Flood Alleviation and Resilience SchemesReport 527 KB Download

At this meeting

Whole meeting

Who was there

6 of 14 attended
TF
Councillor Terry FoxCo-Chair, apologies
GS
Gemma SmithCo-Chair, present
RF
Councillor Robert FrostCommittee Member, present
DJ
Councillor Douglas JohnsonCommittee Member, present
AB
Councillor Amy BrookesCommittee Member, apologies
GJ
Councillor Glyn JonesCommittee Member, present
MF
Michael FaulksCommittee Member, present
DA
Damian AllenCommittee Member, apologies
MS
Martin SwalesCommittee Member, present
RS
Ryan ShepherdOfficer, in attendance
RS
Richard SulleyOfficer, in attendance
KL
Karen LytheObserver, in attendance

All 14 on the meeting page

More from South Yorkshire Mayoral Combined Authority MCA - Housing and Infrastructure Board

All decisions
MeetingDecisionOutcome
16 Mar 2023 Minutes of Previous MeetingRESOLVED that the minutes of the previous meeting held on 8 February 2023 be approved. Approved Open
16 Mar 2023 Matters Arising / Action LogRESOLVED that the Action Log be noted. Noted Open
16 Mar 2023 Programme ApprovalsRESOLVED that the Board: Approve £3m grant award to Sheffield City Council for the “West Bar” project. Approve £1.3m ... Approved Open
8 Feb 2023 Minutes of Previous MeetingRESOLVED that the minutes of the meeting held on 8 December 2022 be approved. Approved Open
8 Feb 2023 Matters Arising / Action LogRESOLVED that the Action Log be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies