Resolved
RESOLVED that the Use of Prospective Scheduling Software to Improve Punctuality be noted. (K. Belfield left the meeting.)
Enhanced Partnership Board noted this item on Tuesday 21 March 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the Use of Prospective Scheduling Software to Improve Punctuality be noted. (K. Belfield left the meeting.)
Beyond Averages
• The FlowOS approach to running time generation is fundamentally robust as it relies on percentiles and probability.
• Though averages can give a good and quick indication of likely running times, they are fundamentally flawed as they satisfy neither the probable worst case or optimal times.
1 Robustness whilst removing slack
• Allocating the 90th percentile goal would certainly deliver good OTP but would result in excess slack and slowing of customer journeys.
We need another step to get the best balance between cost/slack and punctuality
• To do this, the system allocates the fastest possible time that would still deliver 90% OTP in the event of 5 (or 4/3/2) minutes late running. • Gives the best running times whilst ensuring 90% OTP is still achieved in worst case.
• In this example, the most common running time is allocated but with the insurance that it will still be 90% OTP in the event of late running. • We control of both the percentile ‘benchmark’ as well as on-time window or ‘buffer’.
2 Relationship to our inputs
90th Allocated 90% time
0 sec (early) 180 sec (late)
3 mins 3 mins
Allocated 85th 85% time
0 sec (early) 180 sec (late)
3 3 mins Recovery time
Recovery times are calculated in a similar way, and specify how long it will take for 90%-98% of vehicles to complete the trip.
• As times generated are balanced between the optimal time and the TC window, it is crucially important that a high percentage of trips STA on-time. • To solve this, there is a final piece of analysis done by the system that dictates the minimum recovery time for x% of trips observed to start their next trip on time. • As the running times given allow for potential lateness of 5 (or whatever window given), the recovery time is generally at least greater than that 5 minutes (or whatever window given). The trade-off: What levers can we pull?
Resource/PVR Frequency OTP
Impact on customer: Nil Impact on customer: Med Impact on customer: High • Simply make the case for • Allow frequency to flex • Increase OTP ‘window’ adding the resource +/- 2 minutes of desired • Reduce timing point OTP • Might be a consideration • Allow buses to step-back, • Or both for ‘flagship’ services missing trips in the hour • Definitely not pinching time out of timeband to make it work on paper! Doncaster 15: Clay Lane to Edlington
Last week’s OTP: 85%
05:55: 43 mins
06:15: 43 mins 06:35: 44 mins 06:50: 48 mins
07:05: 53 mins 07:20: 53 mins 07:35: 58 mins 07:55: 63 mins
08:15: 63 mins 08:35: 58 mins 08:55: 53 mins
09:10: 53 mins 09:25: 53 mins 09:40: 53 mins 09:55: 53 mins Sheffield 24: Woodhouse to Lowedges
Last week’s OTP: 85.7%
05:30: 66 mins
06:00: 66 mins 06:20: 66 mins 06:40: 71 mins
07:00: 76 mins 07:20: 76 mins 07:40: 81 mins
08:00: 76 mins 08:20: 76 mins 08:40: 71 mins
09:00: 66 mins 09:15: 66 mins 09:30: 66 mins 09:45: 66 mins
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Use of Prospective Scheduling Software to Improve PunctualityReport | 386 KB | DownloadRead as text |
Follow Enhanced Partnership Board at South Yorkshire Mayoral Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes & actions of the previous meetingRESOLVED that the minutes of the meeting held on 4 th March 2026 were agreed as a true and accurate record. The Chair... | Agreed | Open |
| 10 Jun 2026 | DRT UpdateThat the Board noted the update. | Noted | Open |
| 10 Jun 2026 | Vision Strategy UpdateThat the presentation be noted. | Noted | Open |
| 10 Jun 2026 | Fleet Accessibility and Safety EngagementThat the presentation be noted. | Noted | Open |
| 10 Jun 2026 | EP Forum UpdateThat the update be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.