Resolved
that the Board noted the paper.
Enhanced Partnership Board noted this item on Tuesday 16 July 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
that the Board noted the paper.
This report presents discussion points for the future options of the South Yorkshire bus stops and shelter estate both in terms of assets and information.
Thematic Priority
Cross cutting.
Freedom of Information Papers are not made available under the Combined Authority Publication Scheme. The purpose of the Board is to assist the Statutory Officers in exercising their delegated powers as set out in the Scheme of Delegation as described at Article 11 of the Constitution]
This paper is not exempt under Part II of the Freedom of Information Act 2000
EP Board is asked to take note of the content of this report. 1. Introduction
The future options for our bus stop estate requires a challenging, multi-faceted approach. We must maintain services, whilst looking to the change in end user and stakeholder needs, i.e., updated technology, net zero ambitions and whole-life management of assets.
1.1Bus Stop Assets
Is it time to rethink how we provide and maintain the stop/shelter provision throughout South Yorkshire?
Most busy stops feature shelters designed to protect customers from the elements, with visibility for both those waiting to board and the driver. These shelters typically include seats and lighting to enhance security for passengers, together with relevant travel information.
The majority of the shelters within South Yorkshire are constructed from steel and glass, though some are built from stone, brick or even wood. In circumstances of high vandalism polycarbonate or steel mesh may also be utilised. Currently there are 4268 live bus pole stops and 3329 live bus shelters, including 535 “redundant” stops (464 bus stop poles and 61 virtual stops), 136 interchange stops, 18 poles which have never been used on route profiles and 44 customer practice stops which have never been used in route profiles. For information, redundant stops are those which are active but have no services to/from them, i.e., they are no longer served but could be in future. Redundant = Hibernation.
The current shelter replacement programme looks to replace approximately 20 shelters per year at a budget value of £200k. Given the average age of our current portfolio, 15+ years, this figure is woefully inadequate to maintain the stock even minimally. The current number of shelters requiring repair is 377, with 1661 carousel repairs. The life expectancy of a steel shelter is up to 25 years, and a carousel is 5 years, but this expectancy is not usually met. To continue with the present shelter replacement programme pace, most of our portfolio will be aged past its whole life expectancy within the next 5-7 years.
In addition, the growing number of requirements in relation to bus shelters is leading to increases in additional works being required i.e., mains electrical or solar power, plus statutory maintenance.
1.2Bus Stop Information
Is it time to embrace technology and go paperless?
Following the growth in smartphone ownership and online retail, customer expectations have changed. With companies providing live progress updates, customers are accustomed to being able to track the location and arrival time of services as taxis and parcels.
Whilst bus operators and SYMCA provide access to live information through a range of apps and online tools, customers without access to a smartphone are left behind as it is estimated only 7.5% or 511 of 6859 active stops provide live information.
In 2023, 29% of over 65’s didn’t use a smart phone and as a result, some of the most vulnerable residents of South Yorkshire are unable to access the information they need and more immediate action is required to address this.
With over 6800 active stops across the region, significant investment will be required to provide live information at every stop. As a result, a more considered approach based on individual stop location, demographics and usage is required.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
SYMCA Bus Shelter Estate OptionsReport | 317 KB | DownloadRead as text |
Follow Enhanced Partnership Board at South Yorkshire Mayoral Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Jun 2026 | Minutes & actions of the previous meetingRESOLVED that the minutes of the meeting held on 4 th March 2026 were agreed as a true and accurate record. The Chair... | Agreed | Open |
| 10 Jun 2026 | DRT UpdateThat the Board noted the update. | Noted | Open |
| 10 Jun 2026 | Vision Strategy UpdateThat the presentation be noted. | Noted | Open |
| 10 Jun 2026 | Fleet Accessibility and Safety EngagementThat the presentation be noted. | Noted | Open |
| 10 Jun 2026 | EP Forum UpdateThat the update be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.