That the following recommendations of Cabinet be noted: “1. That the RWLP, as set out in Appendix 1 to the submitted report, be published for public consultation under Regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2012. 2. That the RWLP be submitted to the Secretary of State, prior to Examination in Public, under Regulation 22 of the Town and Country Planning (Local Planning) (England) Regulations 2012. 3. That the Corporate Director for Place, in consultation with the Executive Councillor for Housing, Planning and Regulatory Services, be authorised to: (i) approve amendments to the RWLP that may result from inter alia analysis of the representations made following public consultation, recommendations of the Sustainability Appraisal and any additional evidence considered, and then consult on these changes, if required, before they are submitted to the Secretary of State; (ii) agree and approve amendments that may be proposed by the Inspector during the Examination in Public process and to any further consultation that may be required as a result of this; and (iii) take all necessary steps to ensure compliance with the relevant statutory processes and procedures necessary for preparation and participation of the Council at the Examination in Public. 4. That the consultation summary regarding the previous version of the RWLP, as set out in Appendix 2 to the submitted report, be noted.” Note :- This is a Council Function. Executive Councillor :- Cllr Terry
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
1.1To seek Cabinet endorsement of the Essex and Southend-on-Sea Replacement Waste Local Plan Proposed Submission Document (RWLP), prior to consideration at Full Council on 25th February 2016.
Recommendations
2.1Approve the RWLP (Appendix 1) to be published for public consultation under Regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2012.
2.2Approve the RWLP to be submitted to the Secretary of State, prior to Examination in Public, under Regulation 22 of the Town and Country Planning (Local Planning) (England) Regulations 2012.
2.3That the Corporate Director for Place in consultation with the Executive Councillor for Housing, Planning and Regulatory Services is authorised to:
a) approve amendments to the RWLP that may result from inter alia analysis of the representations made following public consultation, recommendations of the Sustainability Appraisal and any additional evidence considered, and then consult on these changes, if required, before they are submitted to the Secretary of State; and
b) agree and approve amendments that may be proposed by the Inspector during the Examination in Public process and to any further consultation that may be required as a result of this; and
c) take all necessary steps to ensure compliance with the relevant statutory processes and procedures necessary for preparation and participation of the Council at the Examination in Public; and
Replacement Waste Local Plan Page 1 of 8 Report No 16/002 Proposed Submission Document 2.4 Note the consultation summary regarding previous version of the RWLP (Appendix 2).
Background
3.1The RWLP will replace the existing Essex and Southend Waste Local Plan 2001. The Plan will provide planning policies to guide and enable waste and related developments until 2032 within the administrative boundaries of Essex and Southend-on-Sea (referred subsequently as the Plan area).
3.2The Borough Council has been working in partnership with Essex County Council to prepare a new RWLP since 2009.
3.3As this is a Joint Waste Plan with Essex County Council, both Councils will need to agree to the contents of the Waste Local Plan at their respective Full Councils. Officers and the relevant Portfolio holders at Essex and Southend-on-Sea Borough Council have been involved in preparing the Waste Local Plan through on going Joint Briefing Panel sessions.
3.4The main sources of waste within the Plan area are: Local Authority Collected Waste (LACW), which is mainly from homes; Commercial and Industrial Waste (C&I) from workplaces; and Construction, Demolition and Excavation Waste (CD&E);
Other types of waste to be managed include: Hazardous; Clinical; Radioactive; and Waste water.
3.5LACW makes up approximately 20% of the total amount of waste created in the Plan area and is managed by a network of transfer sites and the recently opened mechanical biological treatment facility at Tovi Eco Park. These facilities will be ‘safeguarded’ under the RWLP to help meet existing and future need.
3.6The Plan must address not only LACW, which forms a relatively small portion of the overall waste volumes generated in Essex, but also Commercial and Industrial Waste, Construction and Demolition Waste, Hazardous and radioactive waste. The aim is to prioritise waste prevention, re-use and recycling ahead of other types of recovery, and finally disposal.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.