Resolved
That planning permission is GRANTED subject to the following conditions: 01 The development hereby permitted shall begin not later than three years from the date of this decision. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans: (PA)001, (PA) 002, (PA) 003, (PA) 004, (PA) 005, (PA) 006, (PA)007, (PA) 008 Rev P2, (PA) 009 Rev P2, (PA) 010 Rev P1 and SK (003) Rev P1. Reason: To ensure that the development is carried out in accordance with provisions of the Development Plan. 03 Notwithstanding the provisions of Part 3 of the Town and Country Planning (General Permitted Development) Order 2015, the buildings at the site shall be used for no purposes other than as a vocational education and training centre for the construction, motor-vehicle and engineering industries and not for any other uses falling within Use Class D1. Notwithstanding the content of Part 3 of the Town and Country Planning (General Permitted Development) Order 2015 or any legislation amending, revoking or re-enacting this order, the buildings shall be used for no other purposes falling within Use Class D1 as defined by the Town and Country Planning (Use Classes) Order 1987. Reason: To enable future control to be retained in relation to the use of the building and to reflect the specific circumstances that have provided justification for the proposed use at the application site. 04 With reference to BS4142, the noise rating level arising from all plant and equipment used at the site should be at least 5dB(A) below the prevailing background at 3.5 metres from the ground floor façades of the nearest noise sensitive property and 1m from all other facades of the nearest noise sensitive property with no tonal or impulsive character. Reason: In the interests of the amenities of neighbouring residents in accordance with the National Planning Policy Framework, Policy DM1 of the Development Management Document and the Design and Townscape Guide, 2009. 05 Before the use hereby permitted commences, a scheme for the installation of equipment to control the emission of fumes and smell from the spray painting booths installed at the premises shall be submitted to, and approved in writing by, the Local Planning Authority and the approved scheme shall be implemented in full. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interests of the amenities of neighbouring residents in accordance with the National Planning Policy Framework, Policy DM1 of the Development Management Document and the Design and Townscape Guide, 2009. 06 Prior to the occupation of either of the buildings for ... view the full minutes text for item 818.