Resolved
That planning permission be GRANTED subject to the following conditions: 01 The development hereby permitted shall be begun not later than 3 years beginning with the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development shall be carried out in accordance with the approved plans; 1477-PEL-00-GF-DR-A-0004-S2_P2, 1477-PEL-00-GF-DR-A-0003-S2_P2, 1477-PEL-00-GF-DR-A-0005-S2_P2, 1477_PEL_00_XX_DR_A_0020_S2 P1, 1477_PEL_00_XX_DR_A_0015_S2 P1, 1477_PEL_00_XX_DR_A_0014_S2 P1, 1477_PEL_00_XX_DR_A_0013_S2 P1, 1477_PEL_00_XX_DR_A_0011_S2 P1, 1477_PEL_00_ZZ_DR_A_0002_S2 P1, 1477_PEL_00_XX_DR_A_0001_S2 P1, 1477_PEL_00_XX_DR_A_0012_S2 P1, 1477_PEL_00_GF_DR_A_0006_S2 P1, 1477_PEL_00_02_DR_A_0008_S2 P1, 1477_PEL_00_01_DR_A_0007_S2 P1. Reason: To ensure the development is carried out in accordance with the development plan. 03 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works above ground level shall take place until samples of the materials to be used in the construction of the external elevations of the building hereby permitted have been submitted to and approved in writing by the local planning authority. Development shall be carried out in full accordance with the approved details before it is occupied. Reason: To safeguard character and appearance of surrounding area in accordance with the National Planning Policy Framework, Policies KP2 and CP4 of the Core Strategy (2007) and policies DM1 and DM3 of the Development Management Document (2015) as well as the guidance contained within the Design and Townscape Guide (2009). 04 Notwithstanding the details shown on the plans submitted and otherwise hereby approved, no construction works other than demolition works shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include: the timings of the hard and soft landscaping works; proposed finished levels or contours; means of enclosure (including any gates to the car parks); car parking layouts; other vehicle and pedestrian access and circulation areas; hard surfacing materials; minor artefacts and structures (e.g. furniture, loggia, bollards, play equipment, refuse or other storage units, signs, lighting etc.) Details for the soft landscape works shall include the number, location and species of the trees to be removed, the number, size and location of the trees, shrubs and plants to be planted together with a planting specification, the management of the site (e.g. the uncompacting of the site prior to planting) and the initial tree planting and tree staking details. The approved hard and soft landscaping works shall be carried out in accordance with the approved timings. Reason: In the interests of visual amenity and the amenities of occupiers and to ensure a satisfactory standard of landscaping pursuant to Policy CP4 of the Core Strategy (2007), policies DM1 and DM3 of the Development Management Document (2015) as well as the guidance contained within the Design and Townscape Guide (2009). 05 ... view the full minutes text for item 233.