The Cabinet Committee received a report of the Deputy Chief Executive (Place) that sought approval of proposals amending the road layout and traffic flows, including the introduction of signal controls and amendment of traffic regulation orders, in Queensway at the junctions with Whitegate Road and York Road. The proposals included: ( i ) the introduction of a signal controlled right turn manoeuvre by vehicles travelling south from Queensway into Whitegate Road; (ii) the introduction of a signal controlled right turn manoeuvre by vehicles travelling south from Queensway into York Road; (iii) the introduction of a left turn manoeuvre by vehicles travelling north from Queensway into Whitegate Road; (iv) the revocation of the existing one way traffic flow in the section of Whitegate Road from the eastern most exit of Warrior Square Car Park to the eastern extremity of Whitegate Road, enabling two way traffic flow in this section; (v) the revocation of the existing restrictions in the section of Whitegate Road referred to in (iv) above and the introduction “no waiting at any time” restrictions; (vi) the revocation of the existing “no waiting at any time restriction” at the existing western exit of Warriors Square car park and the introduction of a section of Payment Parking (Zone TC) 9am-6pm (Tariff_1) restriction; and (vii) the relocation of the existing “Toucan” pedestrian crossing in Queensway in the southbound carriageway of Queensway to a new position south of the junction with York Road. Plans of the proposals were displayed at the meeting. Having considered the views of the Traffic Regulations Working Party it was:
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
1.1For the Traffic Regulations Working Party and the Cabinet Committee to review the proposed amendments on Queensway at the junctions with Whitegate and York Road.
Recommendations
2.1The Traffic Regulations Working Party and Cabinet Committee will:-
a) Note Officers comments and agree implementation of the Queensway Right Turn Improvement scheme;
b) If approved, further agree that in the event of there being no objections to the proposals, and the Traffic Regulation Order be confirmed; &
c) Note that all unresolved objections will be referred to the Traffic Regulations Working Party for consideration.
Background
3.1Around one third of trips to the town centre are made by car, one third by walking and cycling and one third using the bus and train. Traffic arrives along two major routes (A127 and A13) and is then directed around or through the central area. This leads to congestion, especially during high seasonal peaks, which limits economic growth and residential development. Congestion also interferes with the potential to improve facilities for walking, cycling and public transport access. Traffic accessing the main car parks circulates unnecessarily and leads to confusion over access, parking and alternatives.
Royston Avenue Page 1 of 4 Report Number Verge Hardening Consultation 3.2 Congestion and journey delays make Southend Town Centre a less attractive place to visit. By improving car park access which subsequently reduces town centre traffic volumes and associated travel delays will make the town more appealing to visitors.
3.3The air quality in the town centre is poor which is exasperated by idling vehicles queued in traffic. In order to improve air quality traffic volumes need to be reduced ad traffic flows improved.
3.4Maximum occupancy is currently not achieved at either the Warrior Square or York Road/Tylers Avenue car parks. It is anticipated that occupancy levels can be increased by improving vehicular access.
4.0Scheme Proposals
4.1This scheme seeks to eliminate the issues highlighted in section 3 by allowing vehicles travelling south to right turn from Queensway. This will reduce the volume of vehicular traffic in the town centre, most notably Chichester Road. In order to achieve this, a number of physical changes to the highway are required which are explained in sections 4.2-4.7 and the drawings in Appendix 12.1.
4.2Kerb realignment to the central reservations on the southbound approaches to both Whitegate and York roads to allow the construction of right turn lanes to both junctions.
4.3Installation of traffic signals at the junction with Whitegate Road to ensure the safety of right turning vehicles and prevent excessive queuing at the junction.
4.4Kerb realignment on Whitegate Road at the junction with Queensway to allow both right and left turning traffic into Whitegate Road from Queensway.
4.5It is proposed to close the accesses to Warrior Square Car Park from Warrior Square which will ensure that all access/egress to the car park is via Queensway and Whitegate Road and not from the town centre network.
4.6Currently, there is a Toucan crossing at the junction with York Road which crosses the southbound carriageway to the north of the junction. It is proposed to relocate the southbound crossing to the south of the junction to reduce crossing times when the additional right turn lane is installed.
4.7There are associated changes to traffic signs, street lighting and road markings as shown in the drawings in Appendix 12.1.
4.8To allow the above changes to the highway, some alterations to Statutory Undertakers Plant are required at the junction with Whitegate Road with both Cadent (Formerly National Grid) and Vodafone apparatus affected.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.