Resolved
- That PLANNING PERMISSION be GRANTED subject to the following conditions: 01 This development must be begun within three years from the date of this permission. Reason: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. 02 The development hereby permitted shall be carried out in accordance with the following approved plans: 911.002 Revision E; 911.4A; 911.4B; 911_51; 911.15 Revision A; 911.16 Revision A; 911.17 Revision A; 911.18 Revision A; 911.31 Revision A; 911.4C. Reason: To ensure that the development is carried out in accordance with the policies in the Development Plan. 03 In respect of all sites hereby approved, details of the design and colour of the external surfaces of the posts and poles and associated structures plus, in respect of site 17A the detailed location, size and design detail of the steel sheet fixings, shall be submitted to the Local Planning Authority and approved in writing prior to the commencement of the development at a particular site. Each individual pole, post or structure hereby approved shall be completed in full accordance with the details approved under this condition within 6 months of the commencement of the implementation of that particular pole, post or structure. Reason: To safeguard character and appearance of surrounding area in accordance with the National Planning Policy Framework (2019), Policies KP2 and CP4 of the Core Strategy (2007) and policies DM1 and DM3 of the Development Management (2015) and the advice contained within the Design and Townscape Guide (2009). 04 A Construction and Maintenance Strategy, for all works hereby approved on or adjacent to the public highway, shall be submitted to and approved in writing by the Local Planning Authority, in consultation with Local Highway Authority, prior to the commencement of the development. The Construction and Maintenance Strategy submitted shall include details on how the Eruv structure (poles, posts, associated structures and wire) would be constructed and maintained in a manner that would not compromise highway and pedestrian safety or unacceptably impact on movements on the public highway. The development shall be implemented and in full accordance with the approved Construction and Maintenance Strategy and maintained in accordance with this Strategy in perpetuity. Reason: In the interests of highway and pedestrian safety and to ensure that disruption to pedestrians and traffic on the road network arising from the development would be kept to a minimum in accordance with the National Planning Policy Framework (2019) Policies KP2, CP3 and CP4 of the Core Strategy (2007) and Policies DM1, DM3 and DM15 of the Development Management (2015) and the advice ... view the full minutes text for item 535.