- That ENFORCEMENT ACTION be AUTHORISED to: a) Require the unauthorised roof enlargement to be removed b) Remove from site all materials resulting from compliance with (a) above. The authorised enforcement action to include (if/as necessary) the service of an Enforcement Notice under Section 172 of the Act and the pursuance of proceedings whether by prosecution or injunction to secure compliance with the requirements of the Enforcement Notice. When serving an Enforcement Notice the local planning authority must ensure a reasonable time for compliance. In this case a compliance period of 4 months is considered reasonable for the above works.
Word for word from the decision Southend-on-Sea published for this meeting.Source: democracy.southend.gov.uk
Breach of Control: Enlargement of roof without planning permission
Address: 29 The Drive, Westcliff-On-Sea, Essex, SS0 8PL
Case opened : 4th December 2018
Case Officer: Hayley Thompson
Recommendation: AUTHORISE ENFORCEMENT ACTION
29 The Drive, Westcliff-On-Sea, Essex, SS0 8PL 1 Site location and description
1.1The site is occupied by a large detached two storey dwellinghouse on the west side of The Drive. The site is situated within a residential setting, consisting mainly of large two storey dwellings of traditional appearance with hipped roofs the principal roof form along The Drive.
1.2The Drive is a long sweeping road which slopes downwards from north-south, with gabled roof dwellings found to the north of the application site and side dormers sporadically located along The Drive. No.29 occupies a prominent position, sited forward of neighbouring dwellings to the north with its flank elevation readily visible in the streetscene when travelling north-south down The Drive.
1.3The application dwelling has been significantly extended in the past including two storey front and rear extensions and a two storey side extension completed in the 1980’s.
2 Lawful Planning Use
2.1The lawful planning use is as a dwellinghouse within Class C3 of the Town and Country Planning Use Classes Order 1987 (as amended).
3 Relevant Planning History
3.184/1304 - First floor and two storey extension at rear and two storey front extension – Permission granted.
3.287/0789 - Extend roof with windows at rear – Permission granted.
3.319/00047/CLP - Hip to gable roof extensions, extend existing dormer to rear, rooflights to front – Application refused.
3.419/00551/FULH - Hip to gable roof extensions, extend existing dormer to rear and alter elevations – Application refused and appeal dismissed 30th October 2019
4 The alleged planning breach and the harm caused
4.1Without planning permission, a hip to gable roof extension has been erected together with the installation of a ‘box’ style rear dormer to provide habitable accommodation in the roof.
4.2It has been found through determination of a planning application and dismissal of the subsequent appeal that the rear dormer, by reason of its size, scale, design and siting, represents a discordant, incongruous and overly dominant feature which is detrimental to the character and appearance of the host dwelling, the rear garden scene and the area more widely. In itself the hip to gable roof extension was found to be acceptable and policy compliant. 5 Background and efforts to resolve breach to date
5.1In October 2018 an enforcement case was raised regarding an alleged unauthorised balcony/roof terrace. A site visit was carried out and found that no balcony or roof terrace was being constructed at the site. On site it was clarified by the builders that the works to enlarge the roof, which were in the early stages of construction, were permitted development. An advisory letter was sent noting that a rear dormer was being constructed without planning permission and it was strongly recommended to the owner that they apply for a lawful development certificate.
5.2In December 2018 it was reported to the Local Planning Authority that the size and scale of the roof extensions may be exceeding permitted development size limits and photographic evidence was provided. During the initial site visit in October the dormer was at an early stage of construction and did not reflect the size and scale of the dormer constructed at the site. The enforcement case was refreshed.
5.3In January 2019 a lawful development certificate, reference 19/00047/CLP was applied for to seek to demonstrate that the works being carried out were permitted development.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.